Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Telecommunication Services
Eprocure
Opening Date27 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 15,02,340 
Notes
Download

Costs

Summary

Tender For Supply Of Equipment / Material For Sop To 4g Bsnl Tower Prov. Single Phase Lt Line From Existing 11/.4kv S/stns. And Aug Of S/stns At 7 Locations I.e. Guddan, Shimra, Bhatua, Masrot, Galua, Bondari, Darunda, U Esd Tissa, Koti,ed Chamba.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Muff for steel tubular pole (1800mm long) with concrete filling

8

1708

13666.08

... More
Shackle Insulator with D-Iron

16

119

1915.68

... More
Stay set complete in all respect

8

940

7525.76

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

64

102

6567.68

... More
Prov. G.I. wire 8SWG

60

102

6157.2

... More
Prov. Egg insulator

8

21

171.04

... More
Prov. Eye Hook

8

29

239.44

... More
Nut & Bolts off size

15

126

1892.1

... More
Coil earthing

3

820

2462.97

... More
Aluminium Paint

6

367

2206.44

... More
Erectionof LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.570KM) vill. Guddan section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

1.14

9020

10282.8

... More
Prov. Steel tubular poles. 8mtrs

8

3180

25442.88

... More
Muff for steel tubular pole (1800mm long) with concrete filling

8

503

4031.52

... More
Shackle Insulator with D-Iron

16

35

565.12

... More
Stay set complete in all respect

8

277

2220.08

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

64

30

1937.28

... More
Prov. G.I. wire 8SWG

60

30

1816.2

... More
Prov. Egg insulator

8

6

50.48

... More
Prov. Eye Hook

8

8

70.64

... More
Nut & Bolts off size

15

37

558.15

... More
Coil earthing

3

242

726.57

... More
Aluminium Paint

6

108

650.88

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.240KM)vill. Shimra and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Kangela section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.49

30894

15261.69

... More
Prov. Steel tubular poles. 8mtrs

3

10780

32342.61

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

1708

5124.78

... More
Shackle Insulator with D-Iron

10

119

1197.3

... More
Stay set complete in all respect

3

940

2822.16

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

102

2462.88

... More
Prov. G.I. wire 8SWG

25

102

2565.5

... More
Prov. Egg insulator

3

21

64.14

... More
Prov. Eye Hook

3

29

89.79

... More
Nut & Bolts off size

6

126

756.84

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

2

367

735.48

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.240KM)vill. Shimra and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Kangela section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.49

9020

4455.88

... More
Prov. Steel tubular poles. 8mtrs

3

3180

9541.08

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

503

1511.82

... More
Shackle Insulator with D-Iron

10

35

353.2

... More
Stay set complete in all respect

3

277

832.53

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

30

726.48

... More
Prov. G.I. wire 8SWG

25

30

756.75

... More
Prov. Egg insulator

3

6

18.93

... More
Prov. Eye Hook

3

8

26.49

... More
Nut & Bolts off size

6

37

223.26

... More
Coil earthing

1

242

242.19

... More
Aluminium Paint

2

108

216.96

... More
Supply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Kangela

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
Pipe earthing with GI,Charcoal & Salt

3

3046

9139.95

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

15038

15038.69

... More
LT Cable 3-1/2 core-70mm sq.

20

203

4062.2

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Kangela

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11500

11500

... More
Pipe earthing with GI,Charcoal & Salt

3

360

1080.72

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

1533

1533

... More
LT Cable 3-1/2 core-70mm sq.

20

24

480.4

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) 3.00 KM back to store

1

6300

6300

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.310KM)vill. Bhatua and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Barund section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.64

30894

19741.33

... More
Prov. Steel tubular poles.8mtrs

4

10780

43123.48

... More
Muff for steel tubular pole (1800mm long) with concrete filling

4

1708

6833.04

... More
Shackle Insulator with D-Iron

12

119

1436.76

... More
Stay set complete in all respect

3

940

2822.16

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

102

2462.88

... More
Prov. G.I. wire 8SWG

25

102

2565.5

... More
Prov. Egg insulator

3

21

64.14

... More
Prov. Eye Hook

3

29

89.79

... More
Nut & Bolts off size

7

126

882.98

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

3

367

1103.22

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.310KM)vill. Bhatua and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Barund section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.64

9020

5763.78

... More
Prov. Steel tubular poles.8mtrs

4

3178

12712.36

... More
Muff for steel tubular pole (1800mm long) with concrete filling

4

503

2014.32

... More
Shackle Insulator with D-Iron

12

35

423.48

... More
Stay set complete in all respect

3

277

831.93

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

30

726

... More
Prov. G.I. wire 8SWG

25

30

756.25

... More
Prov. Egg insulator

3

6

18.9

... More
Prov. Eye Hook

3

8

26.46

... More
Nut & Bolts off size

7

37

260.33

... More
Coil earthing

1

242

242.02

... More
Aluminium Paint

3

108

325.2

... More
Supply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Barund

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

15038

15038.69

... More
LT Cable 3-1/2 core-70mm sq.

15

203

3046.65

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Barund

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11500

11500

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

1533

1533

... More
LT Cable 3-1/2 core-70mm sq.

15

17

262.95

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) 1.00 KM back to store

1

2100

2100

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.240 KM)vill. Masrot and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Masrot section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.49

30894

15261.69

... More
Prov. Steel tubular poles.8mtrs

3

10780

32342.61

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

1708

5124.78

... More
Shackle Insulator with D-Iron

10

119

1197.3

... More
Stay set complete in all respect

3

940

2822.16

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

102

2462.88

... More
Prov. G.I. wire 8SWG

25

102

2565.5

... More
Prov. Egg insulator

3

21

64.14

... More
Prov. Eye Hook

3

29

89.79

... More
Nut & Bolts off size

6

126

756.84

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

2

367

735.48

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.240 KM)vill. Masrot and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Masrot section Nakror ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.49

9020

4455.88

... More
Prov. Steel tubular poles.8mtrs

3

3180

9541.08

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

503

1511.82

... More
Shackle Insulator with D-Iron

10

35

353.2

... More
Stay set complete in all respect

3

277

832.53

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

30

726.48

... More
Prov. G.I. wire 8SWG

25

30

756.75

... More
Prov. Egg insulator

3

6

18.93

... More
Prov. Eye Hook

3

8

26.49

... More
Nut & Bolts off size

6

37

223.26

... More
Coil earthing

1

242

242.19

... More
Aluminium Paint

2

108

216.96

... More
Supply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Masrot

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
Pipe earthing with GI,Charcoal & Salt

3

3046

9139.95

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

15038

15038.69

... More
LT Cable 3-1/2 core-70mm sq.

20

203

4062.2

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Masrot

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11500

11500

... More
Pipe earthing with GI,Charcoal & Salt

3

360

1080.72

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

1533

1533

... More
LT Cable 3-1/2 core-70mm sq.

20

24

480.4

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) 3.00 KM back to store

1

6300

6300

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.550KM) vill. Galua section Tarela ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

1.71

30894

52828.91

... More
Prov. Steel tubular poles. 8mtrs

8

10780

86246.96

... More
Muff for steel tubular pole (1800mm long) with concrete filling

8

1708

13666.08

... More
Shackle Insulator with D-Iron

22

119

2634.06

... More
Stay set complete in all respect

7

940

6585.04

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

56

102

5746.72

... More
Prov. G.I. wire 8SWG

58

102

5951.96

... More
Prov. Egg insulator

7

21

149.66

... More
Prov. Eye Hook

7

29

209.51

... More
Nut & Bolts off size

15

126

1892.1

... More
Coil earthing

2

820

1641.98

... More
Aluminium Paint

5

367

1838.7

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.550KM) vill. Galua section Tarela ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

1.71

8171

13973.78

... More
Prov. Steel tubular poles. 8mtrs

8

2851

22813.2

... More
Muff for steel tubular pole (1800mm long) with concrete filling

8

451

3614.8

... More
Shackle Insulator with D-Iron

22

31

696.74

... More
Stay set complete in all respect

7

248

1741.81

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

56

27

1520.4

... More
Prov. G.I. wire 8SWG

58

27

1574.7

... More
Prov. Egg insulator

7

5

39.62

... More
Prov. Eye Hook

7

7

55.44

... More
Nut & Bolts off size

15

33

500.55

... More
Coil earthing

2

217

434.32

... More
Aluminium Paint

5

97

486.35

... More
Supply of LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.210KM) vill. Bondari section Tarela ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.43

30894

13377.15

... More
Prov. Steel tubular poles. 8mtrs

3

10780

32342.61

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

1708

5124.78

... More
Shackle Insulator with D-Iron

10

119

1197.3

... More
Stay set complete in all respect

3

940

2822.16

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

102

2462.88

... More
Prov. G.I. wire 8SWG

22

102

2257.64

... More
Prov. Egg insulator

3

21

64.14

... More
Prov. Eye Hook

3

29

89.79

... More
Nut & Bolts off size

6

126

756.84

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

2

367

735.48

... More
Erction of LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.210KM) vill. Bondari section Tarela ESD Tissa T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.43

9020

3905.86

... More
Prov. Steel tubular poles. 8mtrs

3

3147

9443.4

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

498

1496.34

... More
Shackle Insulator with D-Iron

10

34

349.6

... More
Stay set complete in all respect

3

274

824.01

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

29

719.04

... More
Prov. G.I. wire 8SWG

22

29

659.12

... More
Prov. Egg insulator

3

6

18.72

... More
Prov. Eye Hook

3

8

26.22

... More
Nut & Bolts off size

6

36

220.98

... More
Coil earthing

1

239

239.71

... More
Aluminium Paint

2

107

214.74

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.120 KM)vill. Dharunda and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Bangushar section Pukhari ESD Koti T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.25

30894

7785.31

... More
Prov. Steel tubular poles.8mtrs

3

10780

32342.61

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

1708

5124.78

... More
Shackle Insulator with D-Iron

8

119

957.84

... More
Stay set complete in all respect

4

940

3762.88

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

32

102

3283.84

... More
Prov. G.I. wire 8SWG

27

102

2770.74

... More
Prov. Egg insulator

4

21

85.52

... More
Prov. Eye Hook

4

29

119.72

... More
Nut & Bolts off size

7

126

882.98

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

2

367

735.48

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.120 KM)vill. Dharunda and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Bangushar section Pukhari ESD Koti T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.25

5451

1373.72

... More
Prov. Steel tubular poles.8mtrs

3

1902

5706.84

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

301

904.26

... More
Shackle Insulator with D-Iron

8

21

169.04

... More
Stay set complete in all respect

4

165

663.96

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

32

18

579.52

... More
Prov. G.I. wire 8SWG

27

18

488.97

... More
Prov. Egg insulator

4

3

15.08

... More
Prov. Eye Hook

4

5

21.12

... More
Nut & Bolts off size

7

22

155.82

... More
Coil earthing

1

144

144.86

... More
Aluminium Paint

2

65

131

... More
Supply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Bangushar

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
LT Cable 3-1/2 core-70mm sq.

15

203

3046.65

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Bangushar

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11500

11500

... More
LT Cable 3-1/2 core-70mm sq.

15

22

335.4

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) 1.00 KM back to store

1

2101

2101.79



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.