Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Services
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date10 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 5,44,501.26 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prov. Muffs with concerete filling

8

-

13600

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2340 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

-

5200

... More
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm

1

-

256

... More
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side)

4

-

3716

... More
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 4 structures

4

-

2192

... More
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]

4

-

660

... More
Prov. Pin Insulator with GI Pin

24

-

3528

... More
Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting

15

-

20790

... More
Prov. GO AB Switch Unit (11kV, 400A,) O/D type

1

-

6445

... More
Prov. D.O Fuse Unit

1

-

2156

... More
Prov.Stay set complete HT i/c Egg

14

-

11788

... More
Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL)

98

-

-

... More
Prov. HT Earthing set complete

4

-

10912

... More
Prov. GI Wire 8 SWG. (Prov. By HPSEBL)

84

-

-

... More
Prov. Eye hook For earth wire

8

-

400

... More
Prov. earth wire Clamp

8

-

2184

... More
Prov. Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ]

12

-

1812

... More
Prov. Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No]

12

-

3132

... More
Prov. Danger Plate (250X200X1.6 mm)

6

-

780

... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

40

-

4000

... More
Prov. Barbed Wire

20

-

1500

... More
Prov. Aluminium Paint

16

-

5280

... More
Erection of 9 Mtr. ST pole Single structure i.e. digging of pit, fixing of insulator, x-arms, K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect.

4

-

19460

... More
Erection of 9 Mtr. ST pole double structure i.e. digging of pit, fixing of insulator, x-arms, K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect.

2

-

21630

... More
Erection of HT Stay set complete

14

-

26950

... More
Erection of HT Earthing set complete

4

-

3980

... More
Erection of G.O. switch & Do Fuse set complete

1

-

2650

... More
Fixing of Jumper

2

-

960

... More
Sagging of GI Wire i.e. laying, stringing and sagging & binding (Single wire per KM).

0.4

-

2488

... More
Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.250 Km)

0.25

-

12327

... More
63 KVA Trsanformer ( TS No. 222/2024-25)

-

-

-

... More
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA (Prov. By HPSEBL)

1

-

-

... More
Prov. Steel Tubular Poles (9 m, Working Load 200 kgf/m²) (Prov. By HPSEBL)

2

-

-

... More
Prov. Muffs with concerete filling

2

-

3400

... More
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line

2

-

3036

... More
Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's

1

-

773

... More
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

-

5200

... More
Prov. Transformer Bed, Belting & Knee Bracing

-

-

-

... More
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed

2

-

3036

... More
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]

2

-

498

... More
Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

-

1546

... More
Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos

2

-

126

... More
Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing

2

-

524

... More
Prov. Transformer LT Distribution Box and GO Switch fixing Assembly

-

-

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

-

1546

... More
Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos

1

-

124

... More
Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm

1

-

145

... More
Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type

1

-

6443

... More
Prov. D.O Fuse Unit

1

-

2077

... More
Prov. Lighting Arrester, 9 kV Station Class (Porcelain Type)

1

-

371

... More
Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)

3

-

4200

... More
Prov. Stay set complete

4

-

3368

... More
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) (Prov. By HPSEBL)

24

-

-

... More
Prov. Pipe Earthing Set

3

-

9723

... More
Prov. LT Distribution Panel Box With MCCB 100 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp

1

-

21067

... More
Prov. Half Clamp (M.S. Flat 50X6 mm)

17

-

2567

... More
Prov. Full Clamps (M.S. Flat 50X6 mm)

9

-

2349

... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

25

-

2350

... More
Prov. Aluminium Thimble

16

-

640

... More
Prov. Aluminium Thimble

4

-

1288

... More
Prov. Danger Plate

1

-

127

... More
Prov. Barbed Wire

15

-

1125

... More
Prov. LT Cable (3.5 Core) 95 mm²

35

-

8295

... More
Prov. Aluminum Paint.

4

-

1320

... More
Prov. Prov. 6/1/3.35, 50mm² (Prov. By HPSEBL)

0.15

-

-

... More
Prov. Transformer structure Chain Link fencing , Angle Iron ,Gate etc & Protection plinth (Civil Work as per HPSR) .

1

-

45000

... More
Erection of 63 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earth drilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect.

1

-

81075

... More
Prov. Transportation charges of 63 KVA pole mounted distribution S/Stn.

1

-

10060

... More
Prov. Manual Carriage of 63 KVA Pole Mounted Distribution Sub Stn. Average Distance 1 km from road to site of work (0.080 Km)

0.1

-

1447.7

... More
3-Ph LT Line ( TS No. 224/2024-25)

-

-

-

... More
Prov. AAAC (7/3.15 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} (Prov. By HPSEBL)

2.25

-

-

... More
Prov. Steel Tubular Poles (8 m, Working Load 180 kgf/m²) (Prov. By HPSEBL)

10

-

-

... More
Prov. RCC Muffs

10

-

17000

... More
Prov. C.I. X-Arm (600x75x40) i/c Clamp

7

-

3920

... More
Prov. Stay set L.T. i/c Egg & Clamp).

12

-

11640

... More
Prov. Stay Wire (7/3.15 m) (6.0 kg Per Stay Set) (Prov. By HPSEBL)

72

-

-

... More
Prov, Full Clamp

7

-

2380

... More
Prov. GI Wire (Prov. By HPSEBL)

116

-

-

... More
Prov. D.I. iron (Prov. By HPSEBL)

45

-

-

... More
Prov. Shackle Insulator. (Prov. By HPSEBL)

45

-

-

... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

52

-

6760

... More
Prov. Aluminium Paint

10

-

3660

... More
Prov. Spiral PVC Spacers (Prov. By HPSEBL)

14

-

-

... More
Erection of ST pole 8 Mtr. long , digging of pit, errection of X-Arm, Shackle insulator, filling of pit , painting of pole & ramming with concerete filling of RCC Muff

10

-

28100

... More
Erection of L.T. stay set i.e. digging of pit, fixing of stay road, noseling & titening.

12

-

15600

... More
Sagging of Conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).

2.25

-

34575.36

... More
Sagging of GI WIre i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).

1.16

-

7215.2

... More
Mannual carriage of material 1 KM LT line considering average distance from road to site of work (0.060 Km)

0.25

-

7810

... More
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.