Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Electrical and Electronics
Eprocure
Opening Date5 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 12,64,156
Costs
EMD
₹ 12,642Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Seop65/2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_87586_2Bid Award Id
ViewTender No
SEOP65/2023-24Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Prov.Muffs with concerete filling
2
3573
-
... More
Prov.X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
5.6
4134
-
... More
Prov.MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's
2.8
1035
-
... More
Prov.X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
11.2
6289
-
... More
Transformer Bed, Belting & Knee Bracing
-
-
-
... More
X-Arm:[Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos]forTransformer Bed
5.6
4134
-
... More
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
0.92
516
-
... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
5.6
2070
-
... More
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
0.92
340
-
... More
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
1.9
702
-
... More
Transformer LT Distribution Box and GO Switch fixing Assembly
-
-
-
... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
5.6
2070
-
... More
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
0.45
166
-
... More
GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
0.46
258
-
... More
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
1
6806
-
... More
D.O Fuse Unit
1
2194
-
... More
Surge Arrester, 9 kV Station Class (Porcelain Type)
3
1175
-
... More
Discs insulator sets (comprising 1No.Disc(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
3
4435
-
... More
Stay set complete
4
4322
-
... More
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
28
2205
-
... More
Pipe Earthing Set
3
10271
-
... More
LT Distribution Panel Box with MCCB 400 amp 3P 50kA -1 No., Make L&T,Schneider and ABB only, MCCB 250 Amp 36 kA 3P of L&T Schneider and ABB make only- 3 Nos for 250 KVA DTR
1
39890
-
... More
Half Clamp (M.S. Flat 50X6 mm)
17
2712
-
... More
Full Clamps (M.S. Flat 50X6 mm)
9
2481
-
... More
Nuts and Bolts of Various Sizes (with flat and spring washers)]
27
3217
-
... More
Aluminium Thimble
16
678
-
... More
Aluminium Thimble
4
1361
-
... More
Danger Plate
1
134
-
... More
Barbed Wire
15
1181
-
... More
LT XLPE Cable (3.5 Core) 120 mm²
30
35693
-
... More
Aluminium Paint.
4
1389
-
... More
Red Oxide
3
475
-
... More
Prov.AAAC 7/3.15mm² Conductor for Earthing
150
6925
-
... More
Prov. plinth and Fencing for double pole 250 KVA S/Stn.
1
108149
-
... More
CT-PT Unit Belting & Knee Bracing
-
-
-
... More
X-Arm:[Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos]for CT-PT Unit
5.6
4134
-
... More
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of CT-PT Unit]
0.92
679
-
... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
5.6
2070
-
... More
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
0.92
231
-
... More
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
2.77
1023
-
... More
Prov. CT/PT combined unit 15 KV /110V 25/5 A
1
23206
-
... More
Prov.Energy Smart Meter 11 KV HT -/5 Amps
1
14039
-
... More
PVC Multistrand 4 mm² copper wire with Φ-1 inch GI pipe for concealing
1
3169
-
... More
Transportation Charges
1
31156
-
... More
Erection Charges complete in all respect
1
85922
-
... More
11 KV HT Line
-
-
-
... More
Prov AAAC 7/3.81mm² Conductor (80mm²) {Includes Cutting and wastage}
1.39
93963
-
... More
Steel Tubular Poles (11 m, Working Load 200 kgf/m²)
2
40400
-
... More
Steel Tubular Poles (10 m, Working Load 300 kgf/m²)
7
128978
-
... More
Muffs with concerete filling
9
16080
-
... More
Run Thro' Structures (∆ Formation): on Single Pole Structures (Adopt Eight (8) No. Run-through Structures per Km) -
-
-
-
... More
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure
7
6568
-
... More
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
14
3874
-
... More
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
7
2509
-
... More
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole
structure
21
3266
-
... More
HT Stay / Guy Arrangement
-
-
-
... More
Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
9
9726
-
... More
Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
90
7090
-
... More
Earthing
-
-
-
... More
HT Earthing set complete
8
9154
-
... More
Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
46
3530
-
... More
Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] {0.102 kg/m}
2.02
155
-
... More
Eye Hook for earth wire
7
353
-
... More
Earth Wire Clamp
7
1930
-
... More
MS Angle Iron: 50x50x6, Length : 2800 mm for Road crossing
2
2068
-
... More
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting GO switch
2
3147
-
... More
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
1
258
-
... More
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
1
6806
-
... More
Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ]
18
2872
-
... More
Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No]
18
4963
-
... More
Danger Plate (250X200X1.6 mm)
8
1074
-
... More
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
48
6302
-
... More
Barbed Wire
27
2127
-
... More
Red Oxide
13
2061
-
... More
Aluminium Paint
18
6253
-
... More
Transportation Charges
1
26679
-
... More
Erection Charges complete in all respect
1
110901
-
... More
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.
Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements