Himachal Pradesh State Electricity Board Limited Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Civil And Construction
Eprocure
Opening Date25 Oct 2024
Closing Date8 Nov 2024
Tender Amount₹ 9,68,327
Costs
EMD
₹ 9,683Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Seop24/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_94660_1Bid Award Id
ViewTender No
SEOP24/2024-25Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://www.hpseb.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Belt Set - MS Angle Iron: 65x65x6, Length:(1800 mm) x 2 No.
4
-
3583.48
... More
X-Bracing Set - MS Angle Iron: 50X50x6, Length [2700 mm) x 2 No.]
4
-
4076.36
... More
X-Arm (Horizontal) - MS Channel Iron: (100x50x6 mm), Length: 3250 mm i/c tolerance 100 mm on either side x 2 No.]
4
-
10588.84
... More
Disc insulator String (Strain) sets: 3 No. Discs in each string: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (Single Circuit: 3 No. conductors) x (2 No. sides) /Dead Structures
12
-
31196.88
... More
33 kV Pin Insulators (Porcelain, 36 kV, 10 kN): 3 No per double pole structure
6
-
3745.08
... More
Stay / Guy Arrangement
-
-
-
... More
Stay set complete in all respect (2 No./Run Thro & 4 No. / Dead End)
12
-
16931.64
... More
Stay Wire (7/4.00 mm) (9.0 kg Per Stay Set)
108
-
10471.68
... More
Earthing
-
-
-
... More
HT Earthing set complete
2
-
2640.14
... More
Earth wire (GI, 6 SWG) {Includes Single wire length and Additional 1% (Sag and wastage)}@ 150 kg/km
291
-
28215.36
... More
Eye Hook for earth wire
4
-
210.08
... More
Earth Reel
4
-
101
... More
MS Channel Iron: 75x40x6, Length :3300 mm
4
-
8031.52
... More
Half clamps: [On Double Pole Dead End structure: 6 No, Double Pole Run Thro' structure: 8 No]
16
-
2747.2
... More
Full clamps: [On Double Pole Dead End structure: 4 No, Double Pole Run Thro' structure: 4 No]
12
-
4120.8
... More
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 20 mm Φ or more (with flat and spring washers)]
10
-
1313
... More
Barbed wire
15
-
1257.45
... More
Danger Plate (203X200X1.6mm)
2
-
266.64
... More
Red Oxide
8
-
2262.4
... More
Aluminium Paint
8
-
2957.28
... More
PG clamps
12
-
1721.04
... More
Transportation Charges except civil work
1
-
15914
... More
Erection Charges of Steel Tubular Four Pole Structure
1
-
26478.4
... More
Erection Charges of Stay Set
12
-
25833.6
... More
Stringging & Sagging of GI Wire .
1.79
-
8321.29
... More
Stringging & Sagging of conductor 150 mm2 .
2.69
-
80768.75
... More
Dismantling Charges of PCC Tubular Double Pole Structure
1
-
7307.04
... More
Dismantaling Charge for 1Km Line per conductor (150mm2)
2.69
-
26525.51
... More
Civil Work
-
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
24
-
4255.92
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size)
24
-
131405.76
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4 (1 Cement : 2 coarse sand: 4graded stone aggregate 40 mm nominal size)
38.7
-
238414.06
... More
Centering and shuttering including strutting, propping etc. and removal of form for:
-
-
-
... More
Foundations, footings, bases of columns, etc. for mass concrete.
76.8
-
17199.36
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
810.48
-
64441.26
... More
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.
Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements