Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Telecommunication Services
Eprocure
Opening Date13 Jan 2025
Closing Soon24 Jan 2025
Tender Amount₹ 3,71,475
Costs
EMD
₹ 3,750Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HPSEB_97961_1Tender No
HPSEBL/JMK/2024-25/22Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
AAAC 7/3.15 mm( As per IS Specification)
1.03
-
49179.41
... More
RCC Muff 2000mm Long with concrete filling
6
-
9588
... More
Pro. AI ( 75 x75 x 6) (Length : 1.50 mtr + 0.2 mtr)
6
-
6090
... More
Shackle Insulator(16 kN)
12
-
312
... More
D-iron(U -knob)
12
-
1032
... More
LT stay Set
6
-
5820
... More
Stay wire(7/3.15 mm) including Stay Clamp
36
-
3456
... More
Earth wire( GI , 8 SWG)
51
-
4896
... More
Nuts and Bolts of various sizes (Galvanized/ coated)
5
-
650
... More
Aluminium Paint
6
-
2196
... More
Red Oxide
6
-
1500
... More
Spiral PVC Spacer 1phase
6
-
180
... More
Earthing Set Complete
6
-
4608
... More
Erection Part SOP to 1-phase LT Extension to 4G Mobile Tower at Village Jol
-
-
-
... More
ERECTION OF LT ST Pole : Erection of LT ST pole i.e digging of pit, drilling of hole in pole X-arm, erection of pole , Erection of x-arm Shackle insulator Filling of pit and ramming complete in all respect.
6
-
22096.68
... More
Transportation and manual carriage of LT line from Raod side to site of work (avg lead 0.3 km)
1
-
15275.1
... More
Erection of Conductor :- Laying of Conductor, Stringing, Sagging of AAAC, 50mm² /7/3.15mm² and binding with Insulators complete in all respect
1.03
-
16821.14
... More
Erection of LT stay set:-Digging of pit, Fixing of stay rod Nozzelling and Tightening
6
-
11667.84
... More
Erection of GI wire:- laying of wire, stringging and sagging and binding with insulator.
0.51
-
2515.52
... More
Erection of Earthing Set:- Digging of Pit, Fixing Of GI wireto the earth System and Filling of pit complete job in all respect
6
-
8694.24
... More
SOP to BSNL 4G Mobile Tower in vill Nahli ( GP Baggi)
-
-
-
... More
Supply Part of LT line
-
-
-
... More
ST Pole 8 mtr Long ( As per IS Specification)
2
-
22190
... More
AAAC 7/3.15 mm( As per IS Specification)
0.93
-
44261.47
... More
RCC Muff 2000mm Long with concrete filling
2
-
3196
... More
Shackle Insulator(16 kN)
9
-
234
... More
D-iron(U -knob)
9
-
774
... More
LT stay Set
2
-
1940
... More
Stay wire(7/3.15 mm) including Stay Clamp
16
-
1536
... More
Nuts and Bolts of various sizes (Galvanized/ coated)
6
-
780
... More
Aluminium Paint
3
-
1098
... More
Red Oxide
4
-
1000
... More
Earth wire( GI , 8 SWG)
50
-
4800
... More
Earth knob
2
-
106
... More
Pro. LT cable 3.5 Core 50 mm²
30
-
4590
... More
Erection Part
-
-
-
... More
ERECTION OF LT ST Pole : Erection of LT ST pole i.e digging of pit, drilling of hole in pole X-arm, erection of pole , Erection of x-arm Shackle insulator Filling of pit and ramming complete in all respect.
2
-
7365.56
... More
Transportation and manual carriage of LT line from Raod side to site of work (avg lead 0.45 km)
1
-
22912.65
... More
Erection of Conductor :- Laying of Conductor, Stringing, Sagging of AAAC, 50mm² /7/3.15mm² and binding with Insulators complete in all respect
0.93
-
15188.02
... More
Erection of LT stay set:-Digging of pit, Fixing of stay rod Nozzelling and Tightening
2
-
3889.28
... More
Erection of GI wire:- laying of wire, stringging and sagging and binding with insulator.
0.5
-
2466.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%