Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Civil And Construction
Telecommunication Services
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date29 Jan 2025
Closing Soon13 Feb 2025
Tender Amount₹ 6,36,221.69 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Tender For Providing Supply Of Material Design Erection Testing And Commissioning For Sop To 4g Bsnl Tower By Providing 1 Phase Lt Lines At Locations Ie Upper Kugti Dhuan Nayagram And Piura Along With Augmentation Of Existing Dtr In Bhr Dhar

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

1708

5124.78

... More
Shackle Insulator with D-Iron

10

119

1197.3

... More
Stay set complete in all respect

5

940

4703.6

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

40

102

4104.8

... More
Prov. G.I. wire 8SWG

30

102

3078.6

... More
Prov. Egg insulator

4

21

85.52

... More
Prov. Eye Hook

4

29

119.72

... More
Nut & Bolts off size

10

126

1261.4

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

2

367

735.48

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.180KM)vill. Upper Kugti and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Upper Kugti section Bharmour-I ESD Bharmour T.S.No.104/24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.37

7528

2793.22

... More
Prov. Steel tubular poles.8mtrs

3

3400

10200

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

416

1248.9

... More
Shackle Insulator with D-Iron

10

29

291.8

... More
Stay set complete in all respect

5

229

1146.25

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

40

25

1000.4

... More
Prov. G.I. wire 8SWG

30

25

750.3

... More
Prov. Egg insulator

4

5

20.84

... More
Prov. Eye Hook

4

7

29.16

... More
Nut & Bolts off size

10

30

307.4

... More
Coil earthing

1

200

200.08

... More
Aluminium Paint

2

89

179.24

... More
Supply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Upper Kugti

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

15038

15038.69

... More
LT Cable 3-1/2 core-70mm sq.

30

203

6093.3

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Upper Kugti

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11039

11039

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

1474

1474

... More
LT Cable 3-1/2 core-70mm sq.

30

25

771.9

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) 2.00 KM back to store

1

4760

4760

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.410KM) vill. Dhuan (Siunrr) section Holi ESD Bharmour T.S.No. 92/24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.85

30894

26105.51

... More
Prov. Steel tubular poles.8mtrs

5

10780

53904.35

... More
Muff for steel tubular pole (1800mm long) with concrete filling

5

1708

8541.3

... More
Shackle Insulator with D-Iron

16

119

1915.68

... More
Stay set complete in all respect

9

940

8466.48

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

72

102

7388.64

... More
Prov. G.I. wire 8SWG

44

102

4515.28

... More
Prov. Egg insulator

9

21

192.42

... More
Prov. Eye Hook

9

29

269.37

... More
Nut & Bolts off size

12

126

1513.68

... More
Coil earthing

2

820

1641.98

... More
Aluminium Paint

4

367

1470.96

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.410KM) vill. Dhuan (Sinur) section Holi ESD Bharmour T.S.No. 92 /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.85

8500

7182.5

... More
Prov. Steel tubular poles.8mtrs

5

4500

22500

... More
Muff for steel tubular pole (1800mm long) with concrete filling

5

531

2659.75

... More
Shackle Insulator with D-Iron

16

37

596.48

... More
Stay set complete in all respect

9

292

2636.46

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

72

31

2301.12

... More
Prov. G.I. wire 8SWG

44

31

1406.24

... More
Prov. Egg insulator

9

6

59.94

... More
Prov. Eye Hook

9

9

83.88

... More
Nut & Bolts off size

12

39

471.36

... More
Coil earthing

2

255

511.32

... More
Aluminium Paint

4

114

458.04

... More
Supply of LT LINE 3 ph. WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.360KM) vill. Nayagran section Holi ESD Bharmour T.S.No. 103/24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

0.74

30894

22923.42

... More
Prov. Steel tubular poles.9mtrs

6

16569

99417

... More
Muff for steel tubular pole (2000mm long) with concrete filling

6

1708

10249.56

... More
Shackle Insulator with D-Iron

12

119

1436.76

... More
Stay set complete in all respect

8

940

7525.76

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

64

102

6567.68

... More
Prov. G.I. wire 8SWG

38

102

3899.56

... More
Prov. Egg insulator

8

21

171.04

... More
Prov. Eye Hook

8

29

239.44

... More
Nut & Bolts off size

15

126

1892.1

... More
Coil earthing

3

820

2462.97

... More
Aluminium Paint

6

367

2206.44

... More
Erection of LT LINE 3 ph. WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.360KM) vill. Nayagran section Holi ESD Bharmour T.S.No. 103/24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

0.74

8500

6307

... More
Prov. Steel tubular poles.9mtrs

6

3800

22800

... More
Muff for steel tubular pole (2000mm long) with concrete filling

6

340

2043.78

... More
Shackle Insulator with D-Iron

12

23

286.44

... More
Stay set complete in all respect

8

187

1500.64

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

64

20

1309.44

... More
Prov. G.I. wire 8SWG

38

20

777.48

... More
Prov. Egg insulator

8

4

34.08

... More
Prov. Eye Hook

8

5

47.76

... More
Nut & Bolts off size

15

25

377.25

... More
Coil earthing

3

163

491.13

... More
Aluminium Paint

6

73

439.98

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.180KM) vill. Piura and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Piura section Gehra ESD Dharwala T.S.No.102/24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.52

30894

16064.93

... More
Prov. Steel tubular poles.8mtrs

3

10780

32342.61

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

1708

5124.78

... More
Shackle Insulator with D-Iron

12

119

1436.76

... More
Stay set complete in all respect

3

940

2822.16

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

102

2462.88

... More
Prov. G.I. wire 8SWG

20

102

2052.4

... More
Prov. Egg insulator

3

21

64.14

... More
Prov. Eye Hook

3

29

89.79

... More
Nut & Bolts off size

12

126

1513.68

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

2

367

735.48

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.180KM) vill. Piura and Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Piura section Gehra ESD Dharwala T.S.No. 102/24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.52

7473

3886.11

... More
Prov. Steel tubular poles.8mtrs

3

3400

10200

... More
Muff for steel tubular pole (1800mm long) with concrete filling

3

413

1239.69

... More
Shackle Insulator with D-Iron

12

28

347.52

... More
Stay set complete in all respect

3

227

682.68

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

24

595.68

... More
Prov. G.I. wire 8SWG

20

24

496.4

... More
Prov. Egg insulator

3

5

15.51

... More
Prov. Eye Hook

3

7

21.72

... More
Nut & Bolts off size

12

30

366.12

... More
Coil earthing

1

198

198.6

... More
Aluminium Paint

2

88

177.92

... More
Supply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Piura

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

15038

15038.69

... More
LT Cable 3-1/2 core-70mm sq.

20

203

4062.2

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Piura

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11039

11039

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

1474

1474

... More
LT Cable 3-1/2 core-70mm sq.

20

23

466

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) 1.00 KM back to store

1

2380

2380



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.