Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Jan 2024
Closing DateCancelled
Tender Amount₹ 8,74,986
Costs
EMD
₹ 8,800Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_84286_1Tender No
HPSEBL/JMK/2023-24/16Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
RCC Muff 2000mm Long with concrete filling
21
37149
-
... More
AAAC 7/3.15 mm² ( AS per IS Standard and Specification attached)
2.76
94665
-
... More
Pro. AI ( 75 x75 x 6) (Length : 1.50 mtr + 0.2 mtr)
13
12376
-
... More
Shackle Insulator(16 kN)
48
2016
-
... More
D-iron(U -knob)
48
4128
-
... More
Earth Knob
21
1050
-
... More
LT stay Set
19
16720
-
... More
Stay wire(7/3.15 mm)
114
8892
-
... More
Full Clamp made of MS Flat 50x6mm
19
5187
-
... More
Earth wire( GI , 8 SWG)
140
10640
-
... More
Nuts and Bolts of various sizes (Galvanized/ coated)
51
6018
-
... More
Aluminium Paint
21
7245
-
... More
Erection Part of LT line under ESD No-I Jawalamukhi
-
-
-
... More
4. ERECTION OF ST Pole : Erection of ST pole 8 mtr long i.e digging of pit, drilling of hole in pole X-arm, erection of pole , Erection of x-arm Shackle insulator Filling of pit and ramming complete in all respect.
21
45917
-
... More
Transportation charges of LT line including manual carriage from Raod side to site of work (avg lead 1 km)
1
34050
-
... More
Erection of Conductor :- Laying of Conductor, Stringing, Sagging of AAAC, 50mm² /7/3.15mm² and binding with Insulators complete in all respect
2.75
29688
-
... More
Erection of LT stay set:-Digging of pit, Fixing of stay rod Nozzelling and Tightening
19
23742
-
... More
Erection of GI wire:- laying of wire, stringging and sagging and binding with insulator.
1.35
4495
-
... More
Replacement of Lengthy Service with Bare Conductor In ESD Majheen
-
-
-
... More
Supply Part of LT line
-
-
-
... More
8 Mtr Long ISI marked Swaged Steel Tubular Pole as per IS 2713/1980 (Part-A) as ammended time to time a/w cap welded on top and Cast Iron Base Plate of designation 410-SP-47.
13
114660
-
... More
RCC Muff 2000mm Long with concrete filling
13
22997
-
... More
AAAC 7/3.15 mm² ( AS per IS Standard and Specification attached)
1.68
57706
-
... More
Pro. AI ( 75 x75 x 6) (Length : 1.50 mtr + 0.2 mtr)
13
12376
-
... More
Shackle Insulator(16 kN)
26
1092
-
... More
D-iron(U -knob)
26
2236
-
... More
Earth Knob
13
650
-
... More
LT stay Set
13
11440
-
... More
Stay wire(7/3.15 mm)
78
6084
-
... More
Full Clamp made of MS Flat 50x6mm
39
10647
-
... More
Earth wire( GI , 8 SWG)
83
6308
-
... More
Nuts and Bolts of various sizes (Galvanized/ coated)
20
2360
-
... More
Aluminium Paint
13
4485
-
... More
Erection Part of 1-phase LT line in vill Pathiar
-
-
-
... More
4. ERECTION OF ST Pole : Erection of ST pole 8 mtr long i.e digging of pit, drilling of hole in pole X-arm, erection of pole , Erection of x-arm Shackle insulator Filling of pit and ramming complete in all respect.
13
28425
-
... More
Transportation charges of LT line including manual carriage from Raod side to site of work (avg lead 0.8 km)
1
27240
-
... More
Erection of Conductor :- Laying of Conductor, Stringing, Sagging of AAAC, 50mm² /7/3.15mm² and binding with Insulators complete in all respect
1.68
18136
-
... More
Erection of LT stay set:-Digging of pit, Fixing of stay rod Nozzelling and Tightening
13
16245
-
... More
Erection of GI wire:- laying of wire, stringging and sagging and binding with insulator.
0.81
2697
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements