Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Civil And Construction
Electrical and Electronics
Water Storage And Supply
Electrical Works
Eprocure
Opening Date22 Aug 2024
Closing Date30 Aug 2024
Tender Amount₹ 11,90,850
Costs
EMD
₹ 11,910Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_92068_1Bid Award Id
ViewTender No
NED-13/2024-25Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Prov.Muffs with concerete filling
2
3196
-
Prov.X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line (Prov. by HPSEBL)
2
-
-
Prov.MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's (Prov. by HPSEBL)
1
-
-
Prov.X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch (Prov. by HPSEBL)
4
-
-
Transformer Bed, Belting & Knee Bracing
-
-
-
X-Arm:[Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos]forTransformer Bed (Prov. by HPSEBL)
2
-
-
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] (Prov. by HPSEBL)
2
-
-
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos (Prov. by HPSEBL)
2
-
-
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos (Prov. by HPSEBL)
2
-
-
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing (Prov. by HPSEBL)
2
-
-
Transformer LT Distribution Box and GO Switch fixing Assembly
-
-
-
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos (Prov. by HPSEBL)
2
-
-
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos (Prov. by HPSEBL)
1
-
-
GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm (Prov. by HPSEBL)
1
-
-
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type (Prov. by HPSEBL)
1
-
-
D.O Fuse Unit
1
2202
-
Surge Arrester, 9 kV Station Class (Porcelain Type)
3
3705
-
Discs insulator
3
1614
-
Dead End Clamp (Prov. by HPSEBL)
3
-
-
Ball Cleave eye socket (Prov. by HPSEBL)
3
-
-
Stay set complete (Prov. by HPSEBL)
4
-
-
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. by HPSEBL)
28
-
-
Pipe Earthing Set
3
4584
-
LT Distribution Panel Box with MCCB(50A, 25 kA, 4P) (Prov. by HPSEBL)
1
-
-
Half Clamp (M.S. Flat 50X6 mm) (Prov. by HPSEBL)
17
-
-
Full Clamps (M.S. Flat 50X6 mm) (Prov. by HPSEBL)
9
-
-
Nuts and Bolts of Various Sizes (with flat and spring washers)] (Prov. by HPSEBL)
27
-
-
Aluminium Thimble (Prov. by HPSEBL)
16
-
-
Copper Thimble (Prov. by HPSEBL)
4
-
-
Danger Plate (Prov. by HPSEBL)
2
-
-
Barbed Wire
15
1200
-
LT Cable (3.5 Core) 70 mm²
30
8160
-
3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box(CT-100/5A)
1
17243
-
Aluminium Paint.
4
1464
-
LT Switched Capacitors 9- KVAr for 63KVA DTR (Prov. by HPSEBL)
9
-
-
Prov.AAAC 7/3.15mm² Conductor for Earthing
150
7950
-
Prov. Plinth for double pole (25KVA S/Stn.) structure complete with digging, C.C. 1:6:12, R.R. masonary and plastering etc. size 10'x3'x2.5'
1
8500
-
Prov. Desktop Computer comprising 4GB RAM, SSD, latest window, latest processor, MS-Office etc. installed a/w UPS (Make:Elnova or equivalent)
1
45000
-
Add Erection charges 63 KVA DTR
1
85440
-
Add Transportation charges 63 KVA DTR
1
34688
-
11 KV HT line
-
-
-
AAAC 7/3.15 (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}
0.99
51943
-
Prov. Steel Tubular Poles (13 m, Working Load 200 kgf/m²)
4
146336
-
Prov. Steel Tubular Poles (9 m, Working Load 200 kgf/m²)
4
66772
-
Prov Muffs with concerete filling
8
12784
-
Prov.M.S C.I X-Arm (1500x100x50x6 mm), Long For Single Pole
7.5
5535
-
Prov.M.S A.I X-Arm (1800x50x50x6 mm), Long For Single Pole
9
3330
-
Prov M.S A.I X-Arm (50x50x6 mm), Length (2x750) mm Long For Single Pole
7.5
2775
-
Prov M.S A.I X-Arm (50x50x6 mm), Length (2x600) mm Long For Single Pole
6
2220
-
Prov.M.S C.I X-Arm (2400x100x50x6 mm), Long For Double Pole
4.8
3542
-
Prov.M.S A.I X-Arm (2700x50x50x6 mm), Long For Double Pole
2.7
999
-
Prov.M.S C.I X-Arm (2400x75x40x6 mm), Long For G.O Switch &D.O.Fuses
2.4
1351
-
Prov Belt Set - MS A I 50x50x6, Length [2400 mm x 2 No.] For Double Pole
4.8
1776
-
Prov X-Bracing Set - MS A.I Iron 50x50x6, [2700 mm x 2 No.] For Double Pole
37.8
13986
-
Prov 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN) (Prov. by HPSEBL)
18
-
-
Discs insulator sets
2
1076
-
Dead End Clamp (Prov. by HPSEBL)
2
-
-
Ball Cleave eye socket (Prov. by HPSEBL)
2
-
-
Prov Stay set complete in all respect (Prov. by HPSEBL)
7
-
-
Prov Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) (Prov. by HPSEBL)
70
-
-
Prov HT Earthing set complete
3
3921
-
Prov Double Continous Earth wire (GI, 8 SWG) @ 0.102 kg/m
80
7680
-
Prov Danger Plate (250X200X1.6 mm) (Prov. by HPSEBL)
6
-
-
Prov Nuts and Bolts of Various Sizeswith flat and spring washers
32
4160
-
Prov Barbed Wire
8
768
-
ProvAluminium Paint
10
3660
-
Prov Full Pole Clamps (M.S. Flat 50X6 mm)
8
2720
-
Prov GO AB Switch Unit (11kV, 400A, 25 KA ) (Prov. by HPSEBL)
1
-
-
Prov D.O Fuse Unit
1
2202
-
Add Erection charges HT line
0.32
67982
-
Add Transportation charges HT line
0.32
25402
-
3-Ph LT line
-
-
-
AAAC 7/3.15 (55mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}
0.47
24894
-
Steel Tubular Poles (9 m, Working Load 200 kgf/m²) (with Ruling Span 67 m)
8
133544
-
Muffs with concerete filling
8
12784
-
Channel Iron (75x40x5) [Length- 1.50 Mtr + 0.2 Mtr]
2
2030
-
Shackle Insulator (16 kN) (Prov. by HPSEBL)
8
-
-
D-Iron (U- Clamps) (Prov. by HPSEBL)
8
-
-
Prov. LT AB Cable Size 3X95+1X100+1X16mm
0.23
53955
-
Prov. Suspension Assembly
6
1734
-
Prov. Façade Hook
12
1212
-
Prov. Anchoring Assembly
6
2196
-
Earth Knob
7
91
-
LT Stay Set (Prov. by HPSEBL)
7
-
-
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) (Prov. by HPSEBL)
42
-
-
Kit Kat I.C. (Prov. by HPSEBL)
6
-
-
Full Clamps [ 2 No for A.I + 1 No for Stay Set]
8
2720
-
Earthing Set complete
2
1536
-
Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
118
11328
-
Spool Tie
15
405
-
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
32
4160
-
Aluminium Paint
8
2928
-
Spiral PVC Spacer (Prov. by HPSEBL)
2
-
-
Add Erection charges 3-Ph LT line on Cond.
0.12
18860
-
Add Transportation charges 3-Ph LT line on Cond.
0.12
5963
-
Add Erection charges 3-Ph LT line on cable
0.23
67993
-
Add Transportation charges 3-Ph LT line on cable
0.23
32936
-
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.
Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Amount of serviceable ,dismented material will be recoverd from the bill of contrector as current market rates.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements