Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date15 Nov 2024
Closing Date26 Nov 2024
Tender Amount₹ 1,71,862.3 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Estimate For Providing 11 Kv Ht Line 3 Phase Lt Line From Proposed 25 Kva 11/.04 Kv Dtr At Bajah Bakhli In E Section Saroa Under Electrical Sub Division Hpsebl Pandoh.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prov. C.I.X-Arm (100x50x6mm) Length 2400mm

4

1450

5800

... More
Prov. A I (75x40x6mm) Length 460mm for supporting G O switch handle.

2

210

420

... More
Prov. M S C I (100x50x6) Length 460mm

1

270

270

... More
Prov. X bracing Set 2x(2125X50X50X6 mm)+ 2x(1800x50x50x6 mm)

2

1190

2380

... More
Prov. of H T stay set complete in all respects.

6

890

5340

... More
Prov. of stay wire 7/3.15mm (@ 6 Kg per stay set).

60

62

3720

... More
Prov. H T Earthing set complete in all respects.

1

950

950

... More
Prov. Danger Plate.

2

85

170

... More
Providing of M. S. Nut and bolts with washers off sizes etc. These items should be free from any defects and cracks.

20

100

2000

... More
Prov. Half Clamp.

14

125

1750

... More
Prov. Full Clamp.

15

210

3150

... More
Prov. Aluminium Paint.

4

290

1160

... More
Prov. GO AB Switch complete in all respects.

1

5690

5690

... More
Erection/Labour Part HT Line

-

-

-

... More
Errection of Steel Tubular Pole 9 Mtr. long (Double Pole Strs.) comprising following :- Digging of Pit, Errection of pole, Drilling of hole in Pole, X-arms,Shackle Insulators, filling of Pits & ramming, etc. complete in all respect.

2

6200

12400

... More
Erection of H.T. Stay Set comprising following :-Digging of Pit, fixing of Stay Rod, Nozzeling & Tightening complete in all respect.

6

1200

7200

... More
Erection of H.T. Line with ACSR Conductor 6/1/2.59 (30mm²) such as Stringing , tensioning, Sagging, jointing & fasting etc.

0.28

13700

3836

... More
Erection of H.T. Earthing Set comprising following :- Digging of Pit, fixing of GI wire to earth system and filling of pit complete in all respect.

1

690

690

... More
Erection of G I wire such as Stringing , tensioning, Sagging, jointing & fasting etc.

0.28

2800

784

... More
Add extra mannual carriage on HT line from road head to site of work considering av. Lead 0.300km

0.28

35400

2973.6

... More
Supply Part 25 KVA DTR

-

-

-

... More
Prov. of RCC Muff.

2

1310

2620

... More
Prov. M S C I X-arm(100x50x6)mm Length 2800mm for incommer Line.

2

1710

3420

... More
Prov. M S A I X arms 50x50x6mm Length 2800mm (1 Nos LA ).

1

850

850

... More
Prov. M S C I X-arm(2800x75x40x6)mm for DO fuse & GO switch switch unit.

4

1300

5200

... More
Prov. M S C I X-arm(100x50x6)mm Length 2800mm for transformer base main channel.

2

1710

3420

... More
Prov. C I X arms 460x100x50x6mm for transformer main channel.

2

280

560

... More
Prov. M S A I X arms 50x50x6mm Length 2800mm.

2

850

1700

... More
Prov. M S A I X arms 460x35x35x6mm.

2

95

190

... More
Prov. M S A I X arms 50x50x6mm Length 950mm.

2

280

560

... More
Prov. M S A I X arms 50x50x6mm Length 2800mm.

2

850

1700

... More
Prov. M S A I X arms 50x50x6mm Length 450mm.

1

130

130

... More
Prov. C I-arms 75x40x6mm Length 460mm for supporting GO Switch handle.

1

210

210

... More
Prov. 11 KV GO Switch complete in all respect.

1

5690

5690

... More
Prov. 11 KV D O Fuse.

1

1830

1830

... More
Prov. Surge arrestor (18 KV).

3

960

2880

... More
Prov. Stay set complete in all respect.

4

890

3560

... More
Prov. of stay wire 7/3.15mm (@ 6 Kg per stay set).

24

62

1488

... More
Prov. Pipe Earthing set complete in all respect.

3

2840

8520

... More
Prov. Half Clamp.

17

130

2210

... More
Prov. Full Clamp.

9

220

1980

... More
Providing of M. S. Nut and bolts with washers off sizes etc. These items should be free from any defects and cracks.

25

100

2500

... More
Providing Aluminium Thimble.

16

35

560

... More
Providing Aluminium Thimble.

4

285

1140

... More
Prov. Danger Notice Plate.

1

85

85

... More
Prov. Barbed wire.

15

62

930

... More
Prov. Aluminium paint.

4

290

1160

... More
Erection/Labour Part 25 KVA DTR

-

-

-

... More
Erection of 25 KV, 11/0.4 KV Sub Station i.e. earthing ( 3 Nos. for earthing), drilling of holes in X Arms, Preparation of plate form structure (members C I , A I i. e. X-Arm & Knee bracing set, erection of plate form, erection of X-Arms, drop out, Lightening arrestor, MCCB, switch LT Box, energy meter, erection of transformer, providing earthing connection to G O switch, Transformer, Lightening arrestoretc. erection of 2 Nos. stay sets, erection of jumper, erection of 3 Nos. pipe earthing, Erection of L T Cable and barbed wire & prov. & Painting ect. to complete in all respect.(Note: 25 KVA S/Stn. and LA will be provided by the Board separatly.)

1

33400

33400

... More
Add extra mannual carriage of Transformer from road side to site of work for average distance of 0.300 KM lead. (Except 2 Nos. Steel poles & Muffs).

1

8410

2523

... More
Supply Part LT Line

-

-

-

... More
Prov. of RCC Muff.

3

1310

3930

... More
Providing Shakle Insulator & D-Iron complete.

12

105

1260

... More
Prov. G I wire 8 SWG.

18

62

1116

... More
Providing LT Earth Knob Hook.

3

42

126

... More
Prov. Stay set complete in all respect.

2

740

1480

... More
Prov. of stay wire 7/3.15mm (@ 6 Kg per stay set).

12

62

744

... More
Prov. Earthing set complete in all respect.

1

550

550

... More
Providing of M. S. Nut and bolts with washers off sizes etc. These items should be free from any defects and cracks.

5

100

500

... More
Providing Aluminium Paint.

3

280

840

... More
Erection/Labour Part LT Line

-

-

-

... More
Errection of Steel Tubular Pole 8/9 Mtr. long comprising following :- Digging of Pit, Errection of pole, Drilling of hole in Pole, X-arms,Shackle Insulators, filling of Pits & ramming, etc. complete in all respect.

3

1830

5490

... More
Erection of L.T. Earthing Set comprising following :- Digging of Pit, fixing of GI wire to earth system and filling of pit complete in all respect.

1

750

750

... More
Erection of G I wire such as Stringing , tensioning, Sagging, jointing & fasting etc.

0.17

2800

476

... More
Erection of L.T. Stay Set comprising following :- Digging of Pit, fixing of Stay Rod, Nozzeling & Tightening complete in all respect.

2

1050

2100

... More
Erection of L.T. Line with LT AB Cable 120mm² Such as Stringing , tensioning, Sagging, jointing & fasting etc.

0.17

34700

5899

... More
Add extra mannual carriage on 3phase LT line from road head to site of work considering av. Lead 0.300 km

0.17

18700

953.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.