Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date19 Jan 2024
Closing Date24 Jan 2024
Tender Amount₹ 21,35,906 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.

4

11644

-

... More
Erection of S.T Double Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect.

1

6605

-

... More
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.

4

2820

-

... More
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.

5

6680

-

... More
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80mm²) stringing and sagging, binding with insulator complete in all respect.

1.18

15906

-

... More
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.

0.39

1111

-

... More
Erection of GO switch complete in all respect.

1

6980

-

... More
Fixing jumper complete in all respect.

3

429

-

... More
Erection Part 3-Phase and 1-Phase LT line

-

-

-

... More
Erection of LT line. Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

7

12971

-

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

5

5295

-

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.

5

3840

-

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor for 3-Phase and 1-Phase LT line, complete in all respect.

1.7

15553

-

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.55

1557

-

... More
Erection Part 3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line

-

-

-

... More
Erection of LT line. Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

10

18530

-

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

7

7413

-

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.

7

5377

-

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor for 3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line, complete in all respect.

2.45

22451

-

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.49

1382

-

... More
Erection Part of 11/0.4 KV, 100 KVA Transformer

-

-

-

... More
Erection of 100 kva S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 4 Nos., Erection of LT cable, brabed wire and painting, 4 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer)

1

39362

-

... More
Erection Part of 11 KV HT Line

-

-

-

... More
Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.

4

11644

-

... More
Erection of S.T Single Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect.

1

2911

-

... More
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.

4

2820

-

... More
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.

5

6680

-

... More
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80mm²) stringing and sagging, binding with insulator complete in all respect.

1.14

15287

-

... More
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.

0.38

1069

-

... More
Erection of GO switch complete in all respect.

1

6980

-

... More
Fixing jumper complete in all respect.

3

429

-

... More
Erection Part 3-Phase

-

-

-

... More
Erection of LT line. Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

9

16677

-

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

6

6354

-

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.

6

4609

-

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor for 3-Phase LT line complete in all respect.

2.02

18480

-

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.51

1425

-

... More
Loading of S/Stn. LT & HT Line complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).

1

30500

-

... More
Transformer LT distribution Box & GO Switch fixing Assembly

-

-

-

... More
Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA

2

202120

-

... More
Steel Tubular Poles (9 m, Working Load 200 kgf/m²)

4

50400

-

... More
RCC Muffs with concerete filling

4

7076

-

... More
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line

4

8168

-

... More
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.

2

2048

-

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

8

12460

-

... More
Transformer Belting & Knee Bracing

-

-

-

... More
X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]

4

8168

-

... More
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]

4

1344

-

... More
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos

4

4096

-

... More
MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos

4

460

-

... More
MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)

4

1388

-

... More
Transformer L.T Distribution Box and GO Switch fixing Assembly

-

-

-

... More
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos

4

4096

-

... More
MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.

2

330

-

... More
GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm

2

512

-

... More
GO AB Switch Unit (11kV, 400A, 25 KA) Tripple Pole O/d Type

2

13478

-

... More
D.O Fuse Unit

2

4346

-

... More
Surge Arrester, 9 kV Station Class (Porcelain Type)

6

7002

-

... More
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)

6

8784

-

... More
Stay set complete

8

8560

-

... More
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)

56

4368

-

... More
Pipe Earthing Set

6

20340

-

... More
Panel(Distribution Box LT MS Sheet od 1.6 mm (900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x5mm)inside .painted /powder coated after primar coating MCCB 100 amp 3P 35kA ,ICS =100 % ICU, KIT-KAT 200 Amp

2

28136

-

... More
Half Clamp (M.S. Flat 50X6 mm)

34

5372

-

... More
Full Clamp (M.S. Flat 50X6 mm)

18

4914

-

... More
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

54

6372

-

... More
Aluminium Thimble

32

1344

-

... More
Aluminium Thimble

8

2696

-

... More
Danger Plate

2

202

-

... More
Barbed Wire

15

1170

-

... More
LT Cable (3.5 Core) 95 mm²

30

7470

-

... More
Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box (CT-100/5A) for 63 KVA Transformer

2

28500

-

... More
Aluminium Paint.

8

2760

-

... More
Red Oxide

6

906

-

... More
Supply Part of 11 KV HT Line

-

-

-

... More
Prov. Steel Tublar 9 mtr long with Steel cap & Base Plate

6

75600

-

... More
Prov. RCC Muff with Concrete filling

6

10614

-

... More
Prov. (AAAC 6/1/3.35 mm 50mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

1.18

55726

-

... More
Prov.G.I.Wire No. 8 SWG in mtr.

39.78

3023

-

... More
Run Through Str. ( ∆) Formation on Singlr Pole Str.

-

-

-

... More
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole

4

3704

-

... More
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure

8

2192

-

... More
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm

4

1187

-

... More
Dead End Str.

-

-

-

... More
Prov Belt Set Angle Iron (50x50x6) Length 1800mm x2 Nos.

2

1316

-

... More
Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.

2

1553

-

... More
Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos. ( ∆) Formation

2

3414

-

... More
For G.O. Switch and D.O. Fuse.

-

-

-

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch

4

6232

-

... More
G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm

1

256

-

... More
Prov.Nuts and Bolts of Various Sizes

12

1416

-

... More
Prov.MS Half Clamp

20

3160

-

... More
Prov.MS Full Clamp

10

2730

-

... More
Prov.Barbed Wire

18

1404

-

... More
Prov.Eye/Earth Hook

5

250

-

... More
Prov. Earth Wire Clamp

5

1365

-

... More
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.

3

4350

-

... More
Prov.11kv Pin Insulator with pin complete in all respect

15

2310

-

... More
Prov.11kv Stay set complete in all respect

5

5351

-

... More
Prov. HT Stay Wire (10 kg. per Stay Set)

50

3900

-

... More
Prov.11kv Earthing set complete in all respect.

4

4532

-

... More
Prov.Red Oxide (1.5 Ltr. Per Pole)

9

1359

-

... More
Prov.Alluminum Paint

12

4140

-

... More
Prov.11kv Danger Plate (250x200x1.6 mm)

5

507

-

... More
Prov. 11kv D.O.Fuse unit.

1

2173

-

... More
Prov. 11kv G.O.Switch complete.

1

6739

-

... More
Supply Part 3-Phase and 1-PhaseLT line

-

-

-

... More
Prov. Steel Tubular Pole 8 mtr. long

7

61740

-

... More
Prov. RCC muff with concrete filling

7

12383

-

... More
Prov. AAAC 7/3.15 (55 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

1.7

58393

-

... More
Prov. Eye Hook for earth wire

7

350

-

... More
Prov.Prov. Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr]

4

3808

-

... More
Prov. Shackle Insulator (16 kN)

22

924

-

... More
Prov. D-Iron

22

1892

-

... More
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]

13

3549

-

... More
Prov. L.T Stay wire @ 6Kg P/set

30

2340

-

... More
Prov. L.T Stay Set complete

5

4400

-

... More
Prov. Nut & Bolt off sizes.

14

1652

-

... More
Prov. G.I. Wire 8 SWG

56.5

4294

-

... More
Prov. Superior PVC Sapacer

11

748

-

... More
Prov. Aluminium Paint

14

4830

-

... More
Prov. Red Oxide

10.5

1585

-

... More
Prov. Prov. Earthing Set Complete

5

3335

-

... More
3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line

-

-

-

... More
Prov. Steel Tubular Pole 8 mtr. long

10

88200

-

... More
Prov. RCC muff with concrete filling

10

17690

-

... More
Prov. AAAC 7/3.15 (55 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

2.45

84292

-

... More
Prov. Eye Hook for earth wire

10

500

-

... More
Prov.Prov. Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr]

10

9520

-

... More
Prov. Shackle Insulator (16 kN)

40

1680

-

... More
Prov. D-Iron

40

3440

-

... More
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]

27

7371

-

... More
Prov. L.T Stay wire @ 6Kg P/set

42

3276

-

... More
Prov. L.T Stay Set complete

7

6160

-

... More
Prov. Nut & Bolt off sizes.

20

2360

-

... More
Prov. G.I. Wire 8 SWG

50

3800

-

... More
Prov. Superior PVC Sapacer

20

1360

-

... More
Prov. Aluminium Paint

20

6900

-

... More
Prov. Red Oxide

15

2265

-

... More
Prov. Prov. Earthing Set Complete

7

4669

-

... More
Supply Part of Substation Structure

-

-

-

... More
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100KVA

1

121580

-

... More
Prov. Steel Tubular Poles (9 m, Working Load 200 kgf/m²) with Steel cap & Base Plate

2

25200

-

... More
Prov. RCC Muffs with concerete filling

2

3537

-

... More
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line

2

4084

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.

1

1024

-

... More
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

6230

-

... More
Transformer Belting & Knee Bracing

-

-

-

... More
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]

2

4084

-

... More
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]

2

672

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos

2

2048

-

... More
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos

2

230

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)

2

693

-

... More
Transformer L.T Distribution Box and GO Switch fixing Assembly

-

-

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos

2

2048

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.

1

165

-

... More
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm

1

256

-

... More
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type

1

6738

-

... More
Prov. D.O Fuse Unit

1

2173

-

... More
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)

3

3501

-

... More
Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS,12 kV, 90 kN) including Dead End Clamps etc.)

3

4393

-

... More
Prov. Stay set complete

4

4281

-

... More
Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)

28

2180

-

... More
Prov. Pipe Earthing Set

4

13560

-

... More
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm (900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm) inside .painted /powder coated after primar coating with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp

1

18163

-

... More
Prov. Half Clamp (M.S. Flat 50X6 mm)

17

2688

-

... More
Prov. Full Clamp (M.S. Flat 50X6 mm)

9

2453

-

... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

27

3186

-

... More
Prov. Aluminium Thimble

16

679

-

... More
Prov. Aluminium Thimble

4

1349

-

... More
Prov. Danger Plate

1

101

-

... More
Prov. Barbed Wire

15

1168

-

... More
Prov. LT Cable (3.5 Core) 185 mm² Incoming

15

7168

-

... More
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter (CT-300-400/5 A), Accuracy Class: 0.5S, Category-C, DLMS Compliantfor 100 KVA Transformer

1

13820

-

... More
Prov. Aluminium Paint.

4

1378

-

... More
Prov. Red Oxide

3

453

-

... More
Supply Part of 11 KV HT Line

-

-

-

... More
Prov. Steel Tublar 9 mtr long with Steel cap & Base Plate

5

63000

-

... More
Prov. RCC Muff with Concrete filling

5

8845

-

... More
Prov. (AAAC 6/1/3.35 mm 50mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

1.14

53557

-

... More
Prov.G.I.Wire No. 8 SWG in mtr.

38.25

2907

-

... More
Run Through Str. ( ∆) Formation on Singlr Pole Str.

-

-

-

... More
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole

4

3704

-

... More
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure

8

2192

-

... More
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm

4

1187

-

... More
Dead End Str.

-

-

-

... More
Prov Belt Set Angle Iron (50x50x6) Length 1800mm x2 Nos.

2

1316

-

... More
Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.

2

1553

-

... More
Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos. ( ∆) Formation

2

3414

-

... More
For G.O. Switch and D.O. Fuse.

-

-

-

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch

4

6232

-

... More
G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm

1

256

-

... More
Prov.Nuts and Bolts of Various Sizes

10

1180

-

... More
Prov.MS Half Clamp

20

3160

-

... More
Prov.MS Full Clamp

10

2730

-

... More
Prov.Barbed Wire

15

1170

-

... More
Prov.Eye/Earth Hook

5

250

-

... More
Prov. Earth Wire Clamp

5

1365

-

... More
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.

3

4350

-

... More
Prov.11kv Pin Insulator with pin complete in all respect

12

1848

-

... More
Prov.11kv Stay set complete in all respect

5

5351

-

... More
Prov. HT Stay Wire (10 kg. per Stay Set)

50

3900

-

... More
Prov.11kv Earthing set complete in all respect.

4

4532

-

... More
Prov.Red Oxide (1.5 Ltr. Per Pole)

8

1208

-

... More
Prov.Alluminum Paint

10

3450

-

... More
Prov.11kv Danger Plate (250x200x1.6 mm)

5

507

-

... More
Prov. 11kv D.O.Fuse unit.

1

2173

-

... More
Prov. 11kv G.O.Switch complete.

1

6739

-

... More
Supply Part 3-Phase LT line

-

-

-

... More
Prov. Steel Tubular Pole 8 mtr. long

9

79380

-

... More
Prov. RCC muff with concrete filling

9

15921

-

... More
Prov. AAAC 7/3.15 (55 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}

2.02

69384

-

... More
Prov. Eye Hook for earth wire

9

450

-

... More
Prov.Prov. Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr]

9

8568

-

... More
Prov. Shackle Insulator (16 kN)

36

1512

-

... More
Prov. D-Iron

36

3096

-

... More
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]

24

6552

-

... More
Prov. L.T Stay wire @ 6Kg P/set

36

2808

-

... More
Prov. L.T Stay Set complete

6

5280

-

... More
Prov. Nut & Bolt off sizes.

18

2124

-

... More
Prov. G.I. Wire 8 SWG

51

3876

-

... More
Prov. Superior PVC Sapacer

18

1224

-

... More
Prov. Aluminium Paint

18

6210

-

... More
Prov. Red Oxide

13.5

2038

-

... More
Prov. Prov. Earthing Set Complete

6

4002

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.