Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date11 Nov 2024
Closing Soon20 Nov 2024
Tender Amount₹ 6,35,779.75 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 6,380Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Tender For Supply Of Equipment,material, Design, Erection, Testing And Commissioning For Sop To Shifting Of 11kv Ht Line On 11kv Jawali Feeder And Shifting Of 3-ph. Lt Line From Existing 250 Kva S/stn Bhanei In The Complex Of Shaheed Surinder Singh
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_95106_1Tender No
JED 47/2024-25Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Prov. Muffs with concerete filling
6
-
9600
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
4
-
6760
Cross Arm: [Channel Iron (100x50x6 mm), Length:1270 mm i/c tolerance of 100 mm either side) x 2 Structure
2
-
2048
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x2 structures
2
-
560
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
4
-
1308
Prov. & fabrication of Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm & X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm for Doub. Pole Str. i/c clamp (2 No. per set)
2
-
5740
Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] Δ Formation
4
-
7552
Prov. Pin Insulator with GI Pin
18
-
2934
Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting
6
-
10248
Prov. GO AB Switch Unit (11kV, 400A,) O/D type
1
-
8520
Prov. D.O Fuse Unit
1
-
2200
Prov.Stay set complete HT i/c Egg
10
-
11770
Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL)
70
-
-
Prov. HT Earthing set complete
2
-
2614
Prov. Eye Hook for earth wire
6
-
312
Prov. earth wire
6
-
1638
Prov. GI Wire 8 SWG. (Prov. By HPSEBL)
44
-
-
Prov. Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ]
12
-
2040
Prov. Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No]
12
-
4080
Prov. Danger Plate (250X200X1.6 mm)
4
-
540
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
18
-
2340
Prov. Barbed Wire
35
-
3360
Prov. Aluminium Paint
12
-
4380
MS Channel Iron: 75x40x6, Length : 2400 m for Road crossing
2
-
2092
Erection of 11 Mtr. ST pole Single structure i.e. digging of pit, fixing of insulator, x-arms, K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect.
2
-
11690
Erection of 11 Mtr. ST pole double structure i.e. digging of pit, fixing of insulator, x-arms, K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect.
2
-
24760
Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning.
10
-
22750
Erection of HT Earthing set complete
2
-
3460
Erection of G.O. switch 400 Amp. Comp.
1
-
2200
Sagging of HT AB Cable 3 x 120+95 mm² i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
0.22
-
20394
Sagging of GI Wire i.e. laying, stringing and sagging & binding (Single wire per KM).
0.44
-
2169.2
Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.100Km)
0.1
-
8078
Cutting of tree branches to clear ROW
1
-
45000
3-Ph LT Line
-
-
-
LT AB Cable [Size: (3x120+95 mm²){additional 1% sagging & wastage)
0.21
-
145708.5
Prov. Steel Tubular Poles (8 m, Working Load 180 kgf/m²)
4
-
44380
Prov. RCC Muffs
4
-
6400
Prov. C.I. X-Arm (75x40x6) i/c Clamp
4
-
2240
Prov. Stay set L.T. i/c Egg & Clamp).
6
-
5820
Prov. Stay Wire (7/3.15 m) (6.0 kg Per Stay Set) (Prov. By HPSEBL)
36
-
-
Prov, Full Clamps ( 1 No for Stay Set)
4
-
1360
Prov. D.I. iron & Shackle Insulator assembly (Prov. By HPSEBL)
16
-
-
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
12
-
1560
Prov. Aluminium Paint
8
-
2920
Erection of ST pole 8 Mtr. long , digging of pit, errection of X-Arm, Shackle insulator, filling of pit , painting of pole & ramming with concerete filling of RCC Muff
4
-
14720
Erection of L.T. stay set i.e. digging of pit, fixing of stay road, noseling & titening.
6
-
11670
Sagging of LT AB Cable 3 x 120+95 mm² i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
0.21
-
12714.45
Mannual carriage of material 1 KM LT line considering average distance from road to site of work (0.080Km)
0.08
-
4209.6
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.
Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%