Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Telecommunication Services
Eprocure
Opening Date7 Mar 2024
Closing Date12 Mar 2024
Tender Amount₹ 4,39,480 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

2

1760

880

... More
Supply of Stay Clamp

2

546

273

... More
Supply of Stay Wire (6 KG per Stay)

12

936

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

5000

5000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

5466

2733

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

2

3120

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.22

1583

7131

... More
Fixing of jumper

1

211

211

... More
Annexure "B" SOP to BSNL Tower Kwaring

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.67

18251

27364

... More
Supply of Shackle insulator with D-iron

20

2560

128

... More
Supply of LT Stay Set complete

3

2640

880

... More
Supply of Stay Clamp

3

819

273

... More
Supply of Stay Wire (6 KG per Stay)

18

1404

78

... More
Supply of Aluminium paint

3

1035

345

... More
Supply of Nut & Bolts of various size

10

1180

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

3000

3000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

3

9066

3022

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

3

4680

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.67

4756

7131

... More
Fixing of jumper

1

211

211

... More
Annexure "C" SOP to BSNL Tower Chokhang

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.22

6074

27364

... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

5000

5000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

6036

3018

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.22

1583

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "D" SOP to BSNL Tower Tila

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

1.13

30948

27364

... More
Supply of Shackle insulator with D-iron

20

2560

128

... More
Supply of LT Stay Set complete

3

2640

880

... More
Supply of Stay Clamp

3

819

273

... More
Supply of Stay Wire (6 KG per Stay)

18

1404

78

... More
Supply of Aluminium paint

6

2070

345

... More
Supply of Nut & Bolts of various size

17

2006

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

3000

3000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

6

18108

3018

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

3

4680

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

1.13

8065

7131

... More
Fixing of jumper

3

612

204

... More
Annexure "E" SOP to BSNL Tower Lingcha

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.24

6622

27364

... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

4000

4000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

6036

3018

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.24

1725

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "F" SOP to BSNL Tower Yangthang

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.71

19346

27364

... More
Supply of Shackle insulator with D-iron

16

2048

128

... More
Supply of LT Stay Set complete

3

2640

880

... More
Supply of Stay Clamp

3

819

273

... More
Supply of Stay Wire (6 KG per Stay)

18

1404

78

... More
Supply of Aluminium paint

5

1725

345

... More
Supply of Nut & Bolts of various size

16

1888

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

4000

4000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

5

13650

2730

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

3

4680

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.71

5041

7131

... More
Fixing of jumper

2

408

204

... More
Annexure "G" SOP to BSNL Tower Shakoli

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.34

9385

27364

... More
Supply of Shackle insulator with D-iron

6

768

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

7000

7000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

6034

3017

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.34

2445

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "H" SOP to BSNL Tower Kurched

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.51

13818

27364

... More
Supply of Shackle insulator with D-iron

10

1280

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

3

1035

345

... More
Supply of Nut & Bolts of various size

10

1180

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

8000

8000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

3

9051

3017

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.51

3601

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "I" SOP to BSNL Tower Kothi

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.26

7169

27364

... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

3

2640

880

... More
Supply of Stay Clamp

3

819

273

... More
Supply of Stay Wire (6 KG per Stay)

18

1404

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

12

1416

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

4000

4000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

6034

3017

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

3

4680

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.26

1868

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "J" SOP to BSNL Tower Kishori

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.3

8291

27364

... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

4000

4000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

5460

2730

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.3

2160

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "K" SOP to BSNL Tower Gilding

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.2

5527

27364

... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

4000

4000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

6036

3018

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.2

1440

7131

... More
Fixing of jumper

1

204

204

... More
Annexure "L" SOP to BSNL Tower DPF Phatagahar

-

-

-

... More
SUPPLY PART

-

-

-

... More
Supply of ACSR Conductor, 6/1/2.29 mm sq.

0.28

7744

27364

... More
Supply of Shackle insulator with D-iron

8

1024

128

... More
Supply of LT Stay Set complete

1

880

880

... More
Supply of Stay Clamp

1

273

273

... More
Supply of Stay Wire (6 KG per Stay)

6

468

78

... More
Supply of Aluminium paint

2

690

345

... More
Supply of Nut & Bolts of various size

8

944

118

... More
ERECTION PART

-

-

-

... More
Transportation of material from Division Store to site of work

1

4000

4000

... More
Erection of steel tubular pole 8.00 Mtr. Long (Single pole) digging of pit, Erection of pole, Drilling of holes, Fixing of insulator, Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items. (Punching of the poles is stricitly not allowed)

2

6036

3018

... More
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tightening)

1

1560

1560

... More
Sagging of ACSR Conductor (6/1/2.59 mm) i.e Laying of conductor, Stringging & Sagging& Binding with Insulators

0.28

2018

7131

... More
Fixing of jumper

1

204

204



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.