Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date18 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 4,89,491 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M S Angle Iron.(50x50x6mm) Length 2800 mmx(1 No)

1

1046

1046

... More
X-arm [ Chhanel iron (75x40x6mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

1688

6752

... More
X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos]

2

2259

4518

... More
X-arm [ Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of Transformer]

2

371

742

... More
M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos

2

1046

2092

... More
M S Angle Iron (35x35x6mm)Length 460mm x 2 Nos

2

117

234

... More
M S Angle Iron (50x50x6mm) Length 950 mm x 2 Nos

2

355

710

... More
M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos

2

1046

2092

... More
M S Angle Iron (50x50x6mm) Length 450 mm x 1Nos

1

166

166

... More
GO switch handle supporing M S Channel Iron (75x40x6mm) Length 460 mm x 1Nos

1

259

259

... More
D.O fuse Unit.

1

2202

2202

... More
Surge Arrester 9 KV Station class (Porcelain)

3

1235

3705

... More
Stay set comp.

4

1177

4708

... More
Pipe Earthing set .

3

1528

4584

... More
Half clamp (M.S. Flat 50x6mm)

17

170

2890

... More
Full clamp (M.S. Flat 50x6mm)

9

340

3060

... More
M.S. Nuts & Bolts of various sizes (Galvanised/Coated) [Preferably 16 mm phase or more (with flat and spring washers)]

27

130

3510

... More
Prov. AluminiumThimble

16

15

240

... More
Prov. copper Thimble

4

472

1888

... More
Danger plate

1

132

132

... More
Barbed Wire

15

80

1200

... More
L.T. Cable 3.5 Core 120 mm2 Allumimium Un-Armed

15

460

6909

... More
Aluminium Paint

4

366

1464

... More
Red oxide

3

250

750

... More
LT Switched Capacitors 36-KVAR for 100 KVA ( Rate per KVAR)

36

806

29016

... More
Chain Link Fencing, Angle Iron, Gate etc. for transformer fencing

1

61503

61503

... More
Material Part of CT/PT unit

-

-

-

... More
Prov. 11 KV/110 V Energy meter (3-ɸ, 3/4 wire CT-PT operated Static Tri-Vector meter (PT ratio-/ 110 V, CT ratio-/5 A)(DLMS Compliant)

1

6842

6842

... More
PVC Multistrand 4 mm2 Copper wire with 1-phase inch G.I Pipe for concealing

1

3181

3181

... More
Muff with concerete filling

2

1598

3196

... More
X-arm [Chhanel iron (100x50x6mm), Length:2800 mm X 4 Nos]

4

2237

8948

... More
X-arm [Chhanel iron (75x40x6mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

1672

6688

... More
X-arm [Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of CT/PT Unit]

2

368

736

... More
M S Angle Iron (50x50x6mm) Length 2800 mmx (1 Nos for LA's+2 No for Distribution Panel Box)

1

1036

1036

... More
M S Angle Iron (50x50x6mm) Length 2800 mm x 4 Nos

4

1036

4144

... More
M S Angle Iron (35x35x5mm) Length 460mm x 2 Nos

2

116

232

... More
GO AB Switch Unit (11 KV. 400A. 25 KV )

1

8518

8518

... More
D.O fuse Unit.

1

2202

2202

... More
Surge Arrester 9 KV Station class (Porcelain)

3

1390

4170

... More
Prov. Disc insulator sets

3

1708

5124

... More
Stay set comp.

4

1070

4280

... More
Stay wire (7/3.15mm) (7 Kg per stay set).

28

96

2688

... More
Pipe Earthing set .

3

3436

10308

... More
GI wire 6 SWG for earthing

3

96

288

... More
Half clamp (M.S. Flat 50x6mm)

17

170

2890

... More
Full clamp (M.S. Flat 50x6mm)

9

340

3060

... More
M.S. Nuts & Bolts of various sizes (Galvanised/Coated) [Preferably 16 mm phase or more (with flat and spring washers)]

25

130

3250

... More
Aluminium Thimble

16

42

672

... More
Aluminium Thimble

4

341

1364

... More
Danger plate

1

132

132

... More
Barbed Wire

15

83

1245

... More
Red Oxide

4

250

1000

... More
Aluminium Paint

4

366

1464

... More
Material Part of HT

-

-

-

... More
Prov. RCC Muff with concerete filling

3

1598

4794

... More
11 KV pin insulator with pin helically formed fitting

9

163

1467

... More
Dead end clamp

6

710

4260

... More
supporting clamp

6

300

1800

... More
Prov. Stay set H.T. comp.

6

1177

7062

... More
Prov. X arm [ Channel iron (100x50x6mm), Length:1500 mm

1.5

738

1107

... More
Prov. X arm [ Channel iron (100x50x6mm), Length:2800 mm

5.6

738

4133

... More
Prov. AI X arm [ Channel iron (50x50x6mm), Length:1800 mm

1.8

370

666

... More
Prov. AI X arm [ Channel iron (50x50x6mm), Length:2700 mm

2.7

370

999

... More
Prov. AI knee bracing set 2(50x50x6mm) length 750mm

3

370

1110

... More
Prov. AI knee bracing set (50x50x6mm) length 450mm for supproting the GO switch handle

0.45

370

167

... More
Prov. MS Angle Iron: 50x50x6,(1500*2)

3

370

1110

... More
Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(2700*2)

5.4

370

1998

... More
Earth hook bolt

3

52

156

... More
Prov. Earthing set complete

3

1307

3921

... More
Prov. HT stay clamp

6

300

1800

... More
Prov.HT egg insulator

6

34

204

... More
Prov. Half Clamps

12

170

2040

... More
Prov.Full Clamps

12

340

4080

... More
Prov.Top Clamps

1

327

327

... More
Prov. Half clamp for holding the top clamp

1

170

170

... More
Prov. Barbed wire

9

96

864

... More
Prov. Danger plate

2

132

264

... More
Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )]

10

130

1300

... More
Red oxide

6

280

1680

... More
Prov. Aluminium paint

6

366

2196

... More
Erection Part of 100 KVA, 11/0.4 KV S/Stn.

-

-

-

... More
Erection of Sub-Station structure, muff with C.C. muffing 1:2:4 ratio, C.I. X-arms 4 Nos size 2800*100*50mm for top fitting and Trans base main channel, 2 Nos CI-X-arm 460*100*50mm for supporting and GO switch handle, 4 Nos AI-X-arm 2800*75*40mm for GO switch and DO Fuse unit, A.I.-X-arms 2800*50*50mm 2 Nos for Trans belting and 2 Nos for LT panel box etc, AI 460*35*35mm for bracing of Trans bed, Strain Insulators,Pin Insulator,bend stepple, ball cleave eye socket, , D.O. fuse unit, full and half clamps, MS nuts and bolts off sizes, barbed wire Erection of 100 KVA, 11/0.4 KV transformer, Poles, MCCB for 250 KVA s/Stn, LT cable 3.5 core 50 mm, stay set ,stay wire,G.O Switch,discs Insulator,LA's, S/stn earthing, danger plate,energy meter and Allu paint to all metal parts, jumpering etc.complete in all respect.

1

85000

85000

... More
Erection Part of CT/PT UNIT

-

-

-

... More
Erection of Sub-Station type CT structure, C.C. muffing with 1:2:4 ratio, C.I. X-arms 4 Nos size 2800*100*50mm for top fitting & Trans base main channel, 3 Nos CI-X-arm 460*100*50mm for supporting & GO switch handle, 4 Nos AI-X-arm 2800*75*40mm for GO switch & DO Fuse unit,pin insulator, A.I.-X-arms 2800*50*50mm 2Nos for Trans belting & 2 Nos for LT panel box etc, AI 900*50*50mm for bracing of Trans bed, LAs, Strain Insulators,Pin insulators,bend stepple, ball cleave eye socket, G.O. switch, D.O. fuse unit, erection of 100 KVA, 11/0.4 KV transformer, LT panel box with MCCB 50/5 A, LT cable 3.5 core 35mm, HT stay set, S/stn earthing, full & half clamps, MS nuts & bolts off sizes, danger plate, barbed wire & Allu paint to all metal parts, jumpering etc.complete in all respect.

1

63000

63000

... More
Erection Part of 11KV HT Line

-

-

-

... More
Erection of ST pole 11/9 mtr ,muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 2400*100*50mm /1500*100*50mm for double pole structure , drilling of holes in pole and -X-arm etc, disc insulators with complete fitting, pin insulator with pin, AI -X- bracing set, barbed wire, danger plate, MS Full and half clamps, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect.

1

12000

12000

... More
Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for Single pole structure , drilling of holes in pole , pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect.

1

5800

5800

... More
Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect.

3

1700

5100

... More
Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect.

6

2200

13200

... More
Laying of ACSR/AAAC 6/1/4.09mm (80mm2) i/c stringing, sagging, binding with insulators and jumpering etc. complete in all respect.

0.45

23900

10755

... More
Erection of GO Switch complete in all respect.

1

1600

1600

... More
Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continious earth wire complete in all respect.

0.33

4900

1617



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.