Himachal Pradesh State Electricity Board Limited Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date27 Mar 2025
Closing Date4 Apr 2025
Tender Amount₹ 3,01,729
Costs
EMD
₹ 3,017Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HPSEB_103042_1Bid Award Id
ViewTender No
SED-49/2024-25Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://www.hpseb.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Prov. 33KV Pin Insulators with Pin
6
-
3708
... More
Prov. HT Stay Set Complete
5
-
6985
... More
Prov. Stay wire 7/4.00mm
50
-
4800
... More
Prov. 33KV Danger plate
2
-
264
... More
Prov. MS half Clamp
6
-
1020
... More
Prov. STP 13m long with base plate
2
-
73168
... More
Prov. ASCR 30/7/2.59 mm (80mm) i/c sagging, earthing, jumpering
50
-
9250
... More
Prov. MSCI X-arm3250x100x50x6mm
2
-
5242
... More
Prov. MSCI X-arm 3300x75x40x6mm
1
-
1988
... More
Prov. Eye hook
2
-
104
... More
Prov. MSAI (1800x65x65x6)
2
-
1774
... More
Prov. MSAI (2700x50x50x6)
2
-
2018
... More
Prov. HT Earthing set
1
-
7446
... More
Prov. Aluminium Paint
2
-
732
... More
Prov. Barbed Wire
5
-
415
... More
Prov. MS Nut & Bolt off Size
10
-
1300
... More
Prov. GI wire 6SWG
20
-
1820
... More
Erection Part
-
-
-
... More
Add Erection Charges for DP Pole structure
1
-
12172
... More
Add Erection Charges for Conductor
0.57
-
13559.16
... More
Add Erection Charges for 33kV stay set
5
-
11190
... More
Add Erection Charges for earthing set
1
-
1703
... More
Dismantled charges material
1
-
11600
... More
Transportation Charges
1
-
11863
... More
Civil Part
-
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
6.3
-
1098.28
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size)
0.35
-
1883.85
... More
Centering and shuttering including strutting, propping etc. and removal of form for:
-
-
-
... More
Foundations, footings, bases of columns, etc. for mass concrete.
0.72
-
158.51
... More
Columns, Pillars, Piers, Abutments, Posts and Struts
17.6
-
9214.48
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size)
4.08
-
33023.76
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
2.4
-
22667.42
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
330.46
-
30921.14
... More
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.
Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements