Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Civil And Construction
Eprocure
Opening Date18 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 14,48,426 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch

4

-

6480

... More
Transformer Bed, Belting & Knee Bracing X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed

2

-

4338

... More
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer]

2

-

712

... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

-

2008

... More
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos

2

-

224

... More
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing

2

-

682

... More
Transformer LT Distribution Box and GO Switch fixing Assembly MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

-

2008

... More
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos

1

-

159

... More
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm

1

-

249

... More
Prov. GO switch

1

-

8177

... More
D.O Fuse Unit

1

-

2114

... More
Surge Arrester, 9 kV Station Class (Porcelain Type)

3

-

3558

... More
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)

3

-

4920

... More
Stay set complete

4

-

4520

... More
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)

28

-

2576

... More
Prov. Pipe Earthing Set

3

-

9897

... More
LT Distribution panel box with MCCB. For 63 KVA

1

-

14856

... More
Prov. Half Clamp (M.S. Flat 50X6 mm)

17

-

2771

... More
Prov. Full Clamps (M.S. Flat 50X6 mm)

9

-

2934

... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

60

-

7500

... More
Prov. Aluminium Thimble

16

-

224

... More
Prov. Copper Thimble 200 Amp

4

-

1812

... More
Prov. Danger Plate

1

-

127

... More
Prov. Barbed Wire

15

-

1155

... More
Prov. LT Cable 3.5 X 35 mm²

50

-

5450

... More
Prov. LT Energy Meter (3-ɸ, 4 wire CToperated Static Tri-Vector meter ) (CT-200/5 A) for 63 KVA T/F

1

-

14731

... More
a) Prov. Aluminium Paint.

4

-

1404

... More
b) Prov. Red oxide

3

-

720

... More
LT Switched Capacitors 9- KVAr for 63 KVA (rate per 27KVAr)

1

-

21834

... More
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing

1

-

59043

... More
HT LINE Prov. RCC Muff with concrete filling

26

-

39884

... More
Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type

2

-

16354

... More
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm

2

-

498

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch

2

-

3240

... More
X-Arms: [MS Channel Iron C Type (100x50x5 mm), Length: 2340 mm

26

-

47112

... More
Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)

78

-

127920

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm)

24

-

38880

... More
X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.

26

-

19812

... More
Belt Set - MS Angle Iron: 50x50x6, Length: 1800 mm x 2 No.

26

-

16770

... More
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): for double pole st

39

-

6084

... More
Prov. HT stay set

19

-

21470

... More
Prov. Stay wire 7/3.15mm (@10.0 Kg per stay set)

130

-

11960

... More
Prov. Egg Insulator

19

-

627

... More
Prov. Half clamps (M.S Flat 50x6mm)

104

-

16952

... More
Prov. Full clamps (M.S Flat 50x6mm)

78

-

25428

... More
Prov. Danger plate

13

-

1651

... More
Prov. Barbed wire

52

-

4784

... More
Prov. Nuts & Bolts Off Size

130

-

16250

... More
Pro. Aluminium paint

26

-

9126

... More
LT Line Prov. RCC Muff with concrete filling

9

-

13779

... More
Prov. LT stay set

22

-

20482

... More
Prov. Stay wire 7/3.15mm (@6.0 Kg per stay set)

132

-

12144

... More
Prov. X-Arm (Horizontal) MS Channel Iron: 100X50x6, Length [750 mm]

10

-

5750

... More
Prov. Full/Stay Clamp

22

-

7172

... More
Eye Hook Bolt

22

-

1100

... More
Prov. Half Clamp

10

-

1630

... More
Prov.Egg insulator

22

-

462

... More
Prov. LT Shackle insulator

40

-

1000

... More
Prov. D-iron

40

-

3320

... More
Prov. Nuts & Bolts Off Size

40

-

5000

... More
Pro. Aluminium paint

9

-

3159

... More
Erection of S/Stn.Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing of GO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc., Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets, Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect.

1

-

84310

... More
HT Line ERECTION PART Erection of Single Pole Run through Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.

2

-

11362

... More
Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.

24

-

285264

... More
Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.

19

-

41515

... More
Laying of Conductor, Stringing, Sagging of ACSR, 80/100mm² /6/1/4.72mm² and binding with Insulators (3 wires) and fixing of jumper.

6.09

-

141401

... More
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators.

3.86

-

18291

... More
Erection of LT Line Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.

9

-

31815

... More
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.

22

-

41074

... More
Laying of Conductor, Stringing, Sagging of AAAC, 80/100mm² and binding with Insulators (3 wires) and fixing of jumper.

3.05

-

70828

... More
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators.

0.73

-

3433

... More
Add loding unloding charges for material from store to site of work for complete job.

1

-

8500

... More
Add Testing & Commissioning Charges DTR HT

1

-

900

... More
Labour cess @1% on (Material Cost +Erection + Transportation+ GST + Testing & Commisioning Charges) etc.

1

-

14340



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.