Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Eprocure
Opening Date19 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 2,57,290
Costs
EMD
₹ 3,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_86483_1Bid Award Id
ViewTender No
HPSEBL/EDHMR/2023-24/152Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Half Clamp made of M.S. Flat of size (50 x 6mm).
14
2114
-
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
17
4641
-
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)].
15
1470
-
Aluminium Paint
14
4816
-
X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm]
10
4380
-
Conductor AAAC, 30 mm²,
900
18900
-
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 8/9Mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
14
30618
-
Erection of Single Continous Earth wire (GI, 8 SWG)
0.99
2362
-
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
17
21250
-
Laying of Conductor, Stringing, Sagging of AAAC, 30mm² mm² and binding with Insulators (4 wires) and fixing of jumper.
2.5
14263
-
2 Prov 1-ph & 3-phase LT extension to LOH at vill ropri in ES Kot UESD Tauni Devi. (T.S. No: 202/2022-23) (W.B.S 32100257-001-HMR-LT-072)) 1) Prov. RCC Muff 2000 mm long with concrete filling material
12
21228
-
Shackle Insulator (16 kN) D iron
42
5376
-
LT Stay Set Complete i/c Guy Assembly and Helically fittings)
5
4400
-
Half Clamp made of M.S. Flat of size (50 x 6mm).
12
1812
-
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)].
12
1176
-
Aluminium Paint
12
4128
-
X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm]
12
5256
-
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 8/9Mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
12
26244
-
Erection of Single Continous Earth wire (GI, 8 SWG)
0.76
1801
-
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
16
20000
-
Laying of Conductor, Stringing, Sagging of AAAC, 30mm² mm² and binding with Insulators (4 wires) and fixing of jumper.
2.18
12437
-
Add Transportation charges from Sectional store to various sites with manual carriage of 19 nos poles/AAAC conductor a/w other allied materials
1
9000
-
Labour Cess (@ 1% of the total amount of the supply, erection, testing & commissioning (for comlete Job).
1
2547
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements