Himachal Pradesh State Electricity Board Limited Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Eprocure
Opening Date8 Oct 2024
Closing Date23 Oct 2024
Tender Amount₹ 2,83,879
Costs
EMD
₹ 7,100Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Estimate For Providing Sop To Fire Station Gohar At Jasan Tehsil Chachiot Distt Mandi H.p. In E Section Gohar Under Electrical Sub Division Hpsebl Gohar.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_93991_1Bid Award Id
ViewTender No
NIT-11-24-25Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing of M. S. Nut and bolts with washers off sizes etc. These items should be free from any defects and cracks.
2
200
100
... More
Erection/Labour Part HT Line
-
-
-
... More
Erection of X-Arm & G O switch,complete in all respect.
1
1500
1500
... More
Supply Part 63 KVA DTR
-
-
-
... More
Prov. Steel tubular poles 9mtr Long.
2
20260
10130
... More
Prov. of RCC Muff.
2
2640
1320
... More
Prov. M S C I X-arm(100x50x6)mm Length 2800mm for transformer base main channel.
2
3420
1710
... More
Prov. M S A I X arms 50x50x6mm Length 2800mm (1 Nos LA +2Nos for distribution panel box).
1
810
810
... More
Prov. M S C I X-arm(2800x75x40x6)mm for DO fuse & GO switch switch unit.
4
5160
1290
... More
Prov. M S C I X-arm(100x50x6)mm Length 2800mm for transformer Bed.
2
3420
1710
... More
Prov. C I X arms 460x100x50x6mm for transformer belting .
2
520
260
... More
Prov. M S A I X arms 50x50x6mm Length 2800mm 2 No
2
1620
810
... More
Prov. M S A I X arms 460x35x35x6 mm.
2
180
90
... More
Prov. M S A I X arms 50x50x6mm Length 950 mm
2
540
270
... More
Prov. M S A I X arms 50x50x6mm Length 2800mm x 2nos
2
1620
810
... More
Prov. A I X arms 50x50x6mm Length 450mm
1
130
130
... More
Prov. M S C I X-arm(75x40x6) 460mm for GO switch Handle.
1
205
205
... More
Prov. 22 KV GO Switch complete in all respect.
1
7960
7960
... More
Prov. 22 KV D O Fuse.
1
3470
3470
... More
Prov. 22 KV Disc. Insulator with fitting complete in all respect.
3
4560
1520
... More
Prov. Stay set complete in all respect.
4
3440
860
... More
Prov. of stay wire 7/3.15mm (@ 6 Kg per stay set).
24
1488
62
... More
Prov. Pipe Earthing set complete in all respect.
3
8430
2810
... More
Prov. LT Distribution panel box with MCCB (100A).
1
11410
11410
... More
Prov. Half Clamp.
17
2210
130
... More
Prov. Full Clamp.
9
1980
220
... More
Providing of M. S. Nut and bolts with washers off sizes etc. These items should be free from any defects and cracks.
27
2700
100
... More
Providing Aluminium Thimble.
16
560
35
... More
Providing Aluminium Thimble.
4
1100
275
... More
Prov. Danger Notice Plate.
1
80
80
... More
Prov. Barbed wire.
15
975
65
... More
Prov. LT cable 3.5 core 120 mm².
0.02
2387
159120
... More
Prov. Energy meter 3-Phase, 4 wire DLSM complaint 100/5 Amp CT type.
1
11590
11590
... More
Prov. Aluminium paint.
2
560
280
... More
Erection/Labour Part 63 KVA DTR
-
-
-
... More
Erection of 63 KV, 22/0.4 KV Sub Station i.e. earthing ( 3 Nos. for earthing), drilling of holes in X Arms, Preparation of plate form structure (members C I , A I i. e. X-Arm & Knee bracing set, erection of plate form, erection of X-Arms, drop out, Lightening arrestor, MCCB, switch LT Box, energy meter, erection of transformer, providing earthing connection to G O switch, Transformer, Lightening arrestoretc. erection of 2 Nos. stay sets, erection of jumper, erection of 3 Nos. pipe earthing, Erection of L T Cable and barbed wire & prov. & Painting ect. to complete in all respect. Note: 63 KVA S/Stn. & L A will be provided by the Board separatly.
1
35400
35400
... More
Add extra mannual carriage of Transformer from road side to site of work for average distance of 0.050 KM lead. (Except 2 Nos. Steel poles & Muffs).
1
962
9620
... More
Supply Part LT Line
-
-
-
... More
Prov. Steel tubular poles 9 mtr Long.
4
40520
10130
... More
Prov. of RCC Muff
4
5280
1320
... More
Providing ACSR Condt. 6/1/2.59(30mm²).
0.76
17427
22870
... More
Providing GI wire 8 SWG earth wire.
20
1240
62
... More
Providing Shakle Insulator and D Iron.
16
1440
90
... More
Providing Earth/Eye hook bolt.
4
160
40
... More
Prov. Stay set complete in all respect.
4
2840
710
... More
Prov. of stay wire 7/3.15mm (@ 6 Kg per stay set).
24
1488
62
... More
Providing of M. S. Nut and bolts with washers off sizes etc. These items should be free from any defects and cracks.
8
800
100
... More
Providing Aluminium Paint
4
1120
280
... More
Erection/Labour Part LT Line
-
-
-
... More
Errection of Steel Tubular Pole 9 Mtr. long comprising following :- Digging of Pit, Errection of pole, Drilling of hole in Pole, X-arms,Shackle Insulators, filling of Pits & ramming, etc. complete in all respect.
4
7320
1830
... More
Erection of L.T. Stay Set comprising following :- Digging of Pit, fixing of Stay Rod, Nozzeling & Tightening complete in all respect.
4
4120
1030
... More
Erection of 3Ø Line with ACSR Conductor 6/1/2.59 (30mm²) such as Stringing , tensioning, Sagging, jointing & fasting etc.
0.19
3312
17900
... More
Erection of G I wire such as Stringing , tensioning, Sagging, jointing & fasting etc.
0.19
501
2710
... More
Add extra mannual carriage on 3phase LT line from road head to site of work considering av. Lead 0.100 km
0.19
340
18400
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements