Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Eprocure
Opening Date26 Dec 2023
Closing Date8 Jan 2024
Tender Amount₹ 9,45,547
Costs
EMD
₹ 9,500Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HPSEB_83168_1Bid Award Id
ViewTender No
HPSEBL/JMK/2023-24/14Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
RCC Muff 2000mm Long with concrete filling
2
3538
-
... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Incomer Line.
2
4084
-
... More
MS Angle Iron (50X50x6 mm), Length: 2800 mm x (1 Nos for LA's ).
1
1024
-
... More
MS Channel Iron X-Arm:[Size (75x40x6)mm, Length : 2800 mm x 4 Nos] supporting DO fuse unit & GO switch.
4
6232
-
... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Transformer Bed.
2
4084
-
... More
MS Channel Iron X-Arm:[Size (100x50x6 mm), Length : 460 mm x 2 Nos] for supporting Main Channel of Transformer].
2
672
-
... More
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos. for Belting of Transformer
2
2048
-
... More
MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos for supporting Belt X Arms.
2
230
-
... More
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracings.
2
694
-
... More
MS Angle Iron (50X50x6 mm), Length: 2800 mm x ( 2 No. for LT Distribution Panel Box).
2
2048
-
... More
MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 Nos
1
165
-
... More
MS Chanel Iron (75x40x6 mm), Length: 0.460 mm x ( 2 No. for GO Switch Handle mounting).
1
256
-
... More
GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type
1
6739
-
... More
GO AB Switch Guide Clamp / Full Clamp (M.S. Flat 50X6 mm)
5
1365
-
... More
D.O Fuse Unit
1
2173
-
... More
Surge Arrester, 9 kV Station Class (Porcelain Type)
3
3501
-
... More
Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)
3
4392
-
... More
HT Stay Set Complete i/c Guy Assembly and Helically fittings)
4
4280
-
... More
Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
28
2184
-
... More
Stay Clamp / Full Clamp (M.S. Flat 50X6 mm)
4
1092
-
... More
Sub-Station Pipe Earthing Set (Complete in all respect)
3
10170
-
... More
LT distribution Panel Box with MCCBWith MCCB(100A, 35KA, 4P, 1No) & SFU(32A, 4No, rewirable) for 63 KVA transformer complete in all respect as per relevant technical specification. (for 11/0.4KV 63 kVA Sub-Station.)
1
14068
-
... More
Half Clamp made of MS Flat 50x6mm
17
2686
-
... More
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
27
3186
-
... More
Aluminium Thimble of various sizes
16
672
-
... More
Aluminium Thimble suitable for main LT cable
4
1348
-
... More
Danger Plate (250X200X1.6 mm)
1
101
-
... More
Barbed Wire
15
1170
-
... More
LT Cable (3.5 Core) 95 mm² , PVC (1.1KV,3½Core, Aluminium, Unarmoured) (for 6 Nos. Outgoing).
40
11840
-
... More
3-ɸ, 4 wire CT operated Static Tri-Vector meter (CT-100/5 A).with Accuracy Class 0.5. (for 11/0.4KV 63 kVA Sub-Station.)
1
14250
-
... More
Aluminium Paint.
4
1380
-
... More
Red Oxide
3
453
-
... More
LT Switched Capacitor (27KVAr for 63 KVA Transformer (for 11/0.4KV Sub-Station.)
1
21451
-
... More
meggar 2500 V,/ 5000 ohm hand operated(measuring instrument)
1
17038
-
... More
Supply Part 11 kV HT line
-
-
-
... More
11KV HT LINE : AAAC 7/3.81mm (80mm²) conductor {Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage} (as per IS satandard and specification attached)
1.5
72429
-
... More
9 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-56.
7
88200
-
... More
RCC Muff 2000mm Long with concrete filling material
7
12383
-
... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2340 mm X 2 Nos/ Structure] for Dead /Double Pole Structure.
2
3414
-
... More
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) (1Nos. / Structure]
3
2778
-
... More
MS Angle Iron Knee Bracing Set size (50x50x6 mm), Length (750mm. (2 Nos./ Structure)
6
1644
-
... More
Pole Top Bracket made of (M.S. C.I. 100x50X6mm)100mm
3
891
-
... More
MSAI.Belt Set for X-Bracing set of Size (1800x50x50x6 mm) for Double Pole str. (2Nos per Set) .
4
2632
-
... More
MSAI Bracing Set for X-Bracing set for double pole str of Size 2125x50X50x6mm each ( 2 Nos per set ).
4
3108
-
... More
Half clamps made of MS Flat size 50x6mm for X-Bracing Set (4Nos per Set) .
18
2844
-
... More
Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)
12
17400
-
... More
11 kV Pin Insulators (Porcelain 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure)
15
2310
-
... More
H.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc.
11
11770
-
... More
Stay wire 7/3.15 mm@ 10.00 kG per stay set
110
8580
-
... More
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
18
4914
-
... More
HT Pipe Earthing Set complete in all respect.
5
5665
-
... More
GI Wire 8SWG : for Continous Earth wire {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)} including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 Mtr spacing] at road crossings {0.102 kg/m}
105
7980
-
... More
Eye Hook for for Earth wire
5
250
-
... More
Earth Wire Clamp made of M.S. Flat of size (50 x 6mm).
5
1365
-
... More
MSAI.X-Arm of Size (2800x50x50x6 mm) for Guarding angle on single Pole
1
1024
-
... More
Danger Plate (250X200X1.6 mm)
3
303
-
... More
M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)]
10
1180
-
... More
Barbed Wire
15
1170
-
... More
Red Oxide
7
1057
-
... More
Aluminium Paint
7
2415
-
... More
Supply PartLT line
-
-
-
... More
8 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-56.
9
79380
-
... More
RCC Muff 2000mm Long with concrete filling
9
15921
-
... More
AAAC 7/3.15 mm² (as per IS satandard and specification attached)
2
68698
-
... More
Shackle Insulator(16 kN)
36
1512
-
... More
D-iron(U -knob)
36
3096
-
... More
Earth Knob
9
450
-
... More
LT stay Set
9
7920
-
... More
Stay wire(7/3.15 mm)
54
4212
-
... More
Full Clamp made of MS Flat 50x6mm
27
7371
-
... More
Earth wire( GI , 8 SWG)
50
3800
-
... More
Nuts and Bolts of various sizes (Galvanized/ coated)
21
2478
-
... More
Aluminium Paint
9
3105
-
... More
Angle Iron (75x75x6 (1.5 mtr+0.2 mtr)
9
8568
-
... More
Erection 63 kVA DTR
-
-
-
... More
ERECTION PART : 1. ERECTION OF 11/0.4KV, 63 KV SUB_STATION: Erection of 11/0.4KV, 100KVA Sub-Station Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing of GO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all respect including providing Char Coal, Salt etc., Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets (2 Nos.), Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect.
1
46448
-
... More
Transporatation Charges and manual carriage of 11/0.4 kv 63 kVA DTR along with all allied material from Road Side to Site of work.
0.25
6265
-
... More
Erection 11 kv HT line
-
-
-
... More
4. ERECTION OF 11KV HT LINE : Erection of Single Pole Run through Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
3
10304
-
... More
Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
2
15587
-
... More
Transporatation Charges of matrial including manual carriage of material from Road Side to Site of work.
0.3
16898
-
... More
Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
11
17341
-
... More
Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection complete in all respect.
5
4159
-
... More
Laying of Conductor, Stringing, Sagging of AAAC, 80mm² /7/3.81mm² and binding with Insulators (3 wires) and fixing of jumper.
1.5
23818
-
... More
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators.
1
3329
-
... More
Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Nos.).
6
1012
-
... More
Erection Part LT line
-
-
-
... More
4. ERECTION OF ST Pole : Erection of ST pole 8 mtr long i.e digging of pit, drilling of hole in pole X-arm, erection of pole , Erection of x-arm Shackle insulator Filling of pit and ramming complete in all respect.
9
19678
-
... More
Transportation charges of LT line including manual carriage from Raod side to site of work
0.15
5107
-
... More
Erection of Conductor :- Laying of Conductor, Stringing, Sagging of AAAC, 50mm² /7/3.15mm² and binding with Insulators complete in all respect
2
21591
-
... More
Erection of LT stay set:-Digging of pit, Fixing of stay rod Nozzelling and Tightening
9
11246
-
... More
Erection of GI wire:- laying of wire, stringging and sagging and binding with insulator.
0.5
1664
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements