Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Telecommunication Services
Eprocure
Opening Date3 Dec 2024
Closing Date18 Dec 2024
Tender Amount₹ 7,26,903 
Notes
Download

Costs

Summary

Tender For Supply Of Equipment / Material , Design, Erection, Testing And Commissioning For Sop To 4g Bsnl Tower Authority By Prov. Single Phase Lt Linefrom Existing 11/.4kv S/stns. At 3 Locations Under Esdchowari,dalhousie And Salooni, Ed Dalhousie

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Muff for steel tubular pole (1800mm long) with concrete filling

7

1708

11957.82

... More
Shackle Insulator with D-Iron

22

119

2634.06

... More
Stay set complete in all respect

7

940

6585.04

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

56

102

5746.72

... More
Prov. G.I. wire 8SWG

51

102

5233.62

... More
Prov. Egg insulator

7

21

149.66

... More
Prov. Eye Hook

7

29

209.51

... More
Nut & Bolts off size

10

126

1261.4

... More
Coil earthing

4

820

3283.96

... More
Aluminium Paint

5

367

1838.7

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.500KM) vill. Parsiyara from existing 25 KVA S/Stn. Parsiyara section Raipur ESD Chowari T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

1.03

12098

12461.86

... More
Prov. Steel tubular poles. 8mtrs

7

3873

27114.92

... More
Muff for steel tubular pole (1800mm long) with concrete filling

7

613

4296.46

... More
Shackle Insulator with D-Iron

22

43

946.44

... More
Stay set complete in all respect

7

338

2366

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

56

36

2064.72

... More
Prov. G.I. wire 8SWG

51

36

1880.37

... More
Prov. Egg insulator

7

7

53.76

... More
Prov. Eye Hook

7

10

75.25

... More
Nut & Bolts off size

10

45

453.2

... More
Coil earthing

4

294

1179.92

... More
Aluminium Paint

5

132

660.65

... More
Supply of Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.500KM) vill. Parsiyara from existing 25 KVA S/Stn. Parsiyara section Raipur ESD Chowari T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.58

33673

19395.94

... More
Prov. Steel tubular poles. 8mtrs

4

10780

43123.48

... More
Muff for steel tubular pole (1800mm long) with concrete filling

4

1708

6833.04

... More
Shackle Insulator with D-Iron

12

119

1436.76

... More
Stay set complete in all respect

4

940

3762.88

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

32

102

3283.84

... More
Prov. G.I. wire 8SWG

29

102

2975.98

... More
Prov. Egg insulator

4

21

85.52

... More
Prov. Eye Hook

4

29

119.72

... More
Nut & Bolts off size

7

126

882.98

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

3

367

1103.22

... More
Erection of Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.500KM) vill. Parsiyara from existing 25 KVA S/Stn. Parsiyara section Raipur ESD Chowari T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.58

12045

6937.93

... More
Prov. Steel tubular poles. 8mtrs

4

3856

15425.28

... More
Muff for steel tubular pole (1800mm long) with concrete filling

4

611

2444.2

... More
Shackle Insulator with D-Iron

12

42

513.96

... More
Stay set complete in all respect

4

336

1346

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

32

36

1174.72

... More
Prov. G.I. wire 8SWG

29

36

1064.59

... More
Prov. Egg insulator

4

7

30.6

... More
Prov. Eye Hook

4

10

42.84

... More
Nut & Bolts off size

7

45

315.84

... More
Coil earthing

1

293

293.67

... More
Aluminium Paint

3

131

394.62

... More
Supply of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.430KM) vill. Ghudie from existing 25 KVA S/Stn. Aryas section Bhandal ESD Salooni T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.9

33673

30306.15

... More
Prov. Steel tubular poles.8mtrs

7

10780

75466.09

... More
Muff for steel tubular pole (1800mm long) with concrete filling

7

1708

11957.82

... More
Shackle Insulator with D-Iron

18

119

2155.14

... More
Stay set complete in all respect

7

940

6585.04

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

56

102

5746.72

... More
Prov. G.I. wire 8SWG

43

102

4412.66

... More
Prov. Egg insulator

7

21

149.66

... More
Prov. Eye Hook

7

29

209.51

... More
Nut & Bolts off size

10

126

1261.4

... More
Coil earthing

2

820

1641.98

... More
Aluminium Paint

5

367

1838.7

... More
Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.430KM) vill. Ghudie from existing 25 KVA S/Stn. Aryas section Bhandal ESD Salooni T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.9

10940

9846.47

... More
Prov. Steel tubular poles.8mtrs

7

3502

24518.9

... More
Muff for steel tubular pole (1800mm long) with concrete filling

7

555

3885.07

... More
Shackle Insulator with D-Iron

18

38

700.2

... More
Stay set complete in all respect

7

305

2139.48

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

56

33

1867.04

... More
Prov. G.I. wire 8SWG

43

33

1433.62

... More
Prov. Egg insulator

7

6

48.65

... More
Prov. Eye Hook

7

9

68.04

... More
Nut & Bolts off size

10

40

409.8

... More
Coil earthing

2

266

533.48

... More
Aluminium Paint

5

119

597.4

... More
Supply of Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.430KM) vill. Ghudie from existing 25 KVA S/Stn. Aryas section Bhandal ESD Salooni T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.24

33673

8081.64

... More
Prov. Steel tubular poles.8mtrs

2

10780

21561.74

... More
Muff for steel tubular pole (1800mm long) with concrete filling

2

1708

3416.52

... More
Shackle Insulator with D-Iron

6

119

718.38

... More
Stay set complete in all respect

3

940

2822.16

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

102

2462.88

... More
Prov. G.I. wire 8SWG

12

102

1231.44

... More
Prov. Egg insulator

3

21

64.14

... More
Prov. Eye Hook

3

29

89.79

... More
Nut & Bolts off size

5

126

630.7

... More
Coil earthing

1

820

820.99

... More
Aluminium Paint

1.5

367

551.61

... More
Erection of Erection of LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES (0.430KM) vill. Ghudie from existing 25 KVA S/Stn. Aryas section Bhandal ESD Salooni T.S.No. /24-25)

-

-

-

... More
ACSR 6/1/2.59 (30mm²) {Includes 2 conductor lengths for 1Φ and Additional 1% (Sag, Jumpering and wastage}

0.24

10192

2446.31

... More
Prov. Steel tubular poles.8mtrs

2

3263

6526.74

... More
Muff for steel tubular pole (1800mm long) with concrete filling

2

517

1034.18

... More
Shackle Insulator with D-Iron

6

36

217.44

... More
Stay set complete in all respect

3

284

854.28

... More
Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set)

24

31

745.44

... More
Prov. G.I. wire 8SWG

12

31

372.72

... More
Prov. Egg insulator

3

6

19.41

... More
Prov. Eye Hook

3

9

27.18

... More
Nut & Bolts off size

5

38

190.9

... More
Coil earthing

1

248

248.51

... More
Aluminium Paint

1.5

111

166.97

... More
Sypply of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Bani

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

123148

123148.8

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

15038

15038.69

... More
LT Cable 3-1/2 core-70mm sq.

20

203

4062.2

... More
G.O. switch unit O/D type

1

9086

9086.5

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) back to store

1

-

-

... More
Erection of Aug. of 11/.4 KV 25 KVA to 63 KVS s/stn. Bani

-

-

-

... More
Prov. 11/.4 KV, 63 KVA S/Stn.

1

11625

11625.25

... More
Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 63KVA Trf. as per specification

1

1419

1419.65

... More
LT Cable 3-1/2 core-70mm sq.

20

19

383.4

... More
G.O. switch unit O/D type

1

857

857.77

... More
mannual Carriage of existing & new Transf.(25 & 63 KVA) back to store

1

1787

1787



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.