Himachal Pradesh Irrigation And Public Health Department Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh Irrigation And Public Health Department - HPIPH Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date8 Jan 2025
Closing Soon20 Jan 2025
Tender Amount₹ 1,87,18,944 
Notes
Download

Costs

Summary

Flood Protection Work/channelization Of Kotangtee As A Remedial Measure To Safeguard Settling/sliding In Tehsil Kalpa Distt Kinnaur Hp

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying 15cm thick composite lining of stone with CC 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) for irrigation channel and curing complete exculding the cost of form work with all leads and lifts.

-

-

-

... More
Bed 33% Stone 67% Cement Concrete 1:3:6

648

-

-

... More
Sides 30% Stone 70% Cement Concrete 1:3:6

1152

-

-

... More
Cutting in earth work in all classification of earth work such as pick work, jumper work, saturated soil, blasting soft/ hard rock or chiselling soft/ hard rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering where ever required, stacking the serviceable/ unserviceable materials/soil separately complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge.

20.63

-

-

... More
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm.layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge.

10.83

-

-

... More
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregates 40 mm nominal size).

42.08

-

-

... More
Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4.00 metres and removal of the same for insitu reinforced concrete & plain concrete work in.

-

-

-

... More
Vertical surface such as wall (any thickness) Partition and the like i./c attached pillaster buttresses plinth and string courses and the like.

110.52

-

-

... More
Stone soling under flooring in all leads and lifts as per entire satisfaction of Engineer-in-charge.

33.75

-

-

... More
Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in. Foundation & Plinth.

22.5

-

-

... More
Plantation of Vetiever grass (including sapling, plantation, Manure & Fertilizer and watering Etc.) Complete in all respect as per entire satisfaction of Engineer in Charge.

90

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.