Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh Irrigation And Public Health Department - HPIPH Tender
Water Storage And Supply
Eprocure
Opening Date31 Dec 2024
Closing Date10 Jan 2025
Tender Amount₹ 17,43,97,051
Costs
EMD
₹ 17,43,971Document Cost
₹ 2,500Tender Fee
Refer Documents
Summary
Augmentation Of Water Supply Scheme Bhuntar Town In Tehsil Bhuntar Distt Kullu
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPIPH_97257_1Tender No
10105-10154Tender Authority
Himachal Pradesh Irrigation And Public Health Department ViewPurchaser Address
-Website
http://http://hpiph.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
VOLUMEIIIPART4MECHENICALSPECIFICATION5
VOLUMEIIIPART2GENERALCIVILSPECIFICATION3
VOLUMEIIIPARTITECHNICALSPECIFICATION8
VOLUMEIIIPART5ELECTRICSPECIFICATION6
VOLUMEIIIPART3WTPSPECIFICATION4
VOLUMEIIIPART6AUTOMATIONSPECIFICATION7
BOQ Items
... More
Cutting in excavation by manual means over areas ( exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) including getting out and disposal of wxcavated earth lead up to 50 mrs and lift up to 1.5 mtr in all kind of soils as directed by Engineer-in-charge.
22
-
-
... More
Earth work in excavation by manual means over areas ( exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) including getting out and disposal of wxcavated earth lead up to 50 mrs and lift up to 1.5 mtr in all kind of soils as directed by Engineer-in-charge.
100.07
-
-
... More
Providing & laying in position cement concrete 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in all works upto plinth level all complete as specified & directed by the engineer-in-charge.
18.87
-
-
... More
Centring & shuttering including strutting, propping etc. & removal of form for foundations, footings, bases of columns etc. for mass concrete complete in all respect within all leads & lifts as per the direction & to the entire satisfaction of the engineer-in-charge.
92.4
-
-
... More
Centring & shuttering including strutting, propping etc. & removal of form for walls (any thickness) including attached pilasters, buttresses, plinth & string courses etc. complete in all respect within all leads & lifts as per the direction & to the entire satisfaction of the engineer-in-charge.
231.36
-
-
... More
Providing and laying CC 1:3:6 ( 1: cement : 3 sand : 6 graded stone aggregate with 40 % stone in foundation & walls
44.68
-
-
... More
Providing and laying RCC 1:1.5:3( 1: cement : 1.5 sand : 3 graded stone aggregate 20 mm nominal size in foundation & walls
26.94
-
-
... More
Providing and laying tor steel reinforcement for RCC work including straightening ,cutting, bending, placing in position & binding all complete up to or above plinth level in all leads and lift as per the direction of Engineer-in-charge.
808.07
-
-
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer usingstructural steel etc. as required.
1157.63
-
-
... More
Providing laying jointing of pipes of various diameters for intake and connectivity of various units including scour pipe arrangments,as per the direction of Engineer-in-charge.
-
-
-
... More
250 mm MSERW Pipe Class-A wall thickness 4.80mm
67
-
-
... More
Laying , jointing and testing GMS tubes , tube fittings complete. (excluding earth work ) in all leads and lifts and as per entire satisfaction of Engineer - in - charge , including cost of all fitings and joint material. 150 mm GI pipe wall thickness 4.80 mm
28
-
-
... More
Providing & fixing CI Sluice valve (with hand wheel) as per IS : 780-1984 class-I upto 300 mm dia.(i/c brass spindle & as per 2906-1984 class-II for dia. 250 mm) complete with bolts nuts,rubber insertion etc.,(the tail piece if required shall be measured & paid for separatly).
5
-
-
... More
Turbidity censor, actuators with automated mechanical lifting arrangments as directed by Engineer-in-charge.
1
-
-
... More
Wire crates of G.I wire filled with bolders with square cut faces against the wire (Bolder filling to be measured and paid for separately) G.I wire 5mm thick corresponding to SWG-6.15cm*15cm mesh.
93.75
-
-
... More
Wire crates of G.I wire filled with bolders with square cut faces against the wire (wire crates to be measured and paid for separately)
375
-
-
... More
Gravity Mains (Refer Vol.-II Data Sheet No 3 and Vol.-III Technical specification Part-II)
-
-
-
... More
Excavation in foundation, trenches ( for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge.
6996
-
-
... More
Providing, laying, jointing (by way of circumfrential butt welded joints by electrical arc welding and testing of MSERW pipe of 200 mm dia meters confirming to ISO 3183-2007, Steel garde-A or L 210 (latest with upto date amendments) having wall thickness of 4.80 mm with bevelled ends and capable of withstanding required test pressure in a random length of 4 to 7 meters, including manufacturing reduders/tapers, all short pieces, bends etc. as per site requirement made from parent tube. The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees, etc. including loweringand laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfation of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per relevant IS standards and the damaged portion of the pipes and specials made from the parent tube shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfation & Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately)
6000
-
-
... More
Laying, jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of Galvanised mild steel tubes (GI Pipes) of 150 mm dia GI Medium 4.80 mm thick, confirming to BIS 1239-2001 (latest with upto date amendments) having wall thickness as per code with bevelled / plain ends in a random length of 4 to 7 meters, including manufacturing reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The damaged portion of the pipes and specials made form the parent tube during welding or otherwise shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately).
5510
-
-
... More
Laying, jointing and testing in trenches to be levelled to grades, GI flanged pipes of 150 mm diameter, GI Medium with wall thickness 4.80 mm, confirming to IS:1239-1990( Part-II) having minimum wall thickness as per IS code and class of pipes specified provided and jointed with flanges conforming to Flange Table-5, specified as per BIS 6392-1971 welded at both ends according to relevant BIS standards and detailed specifications and provided with nut & bolts of required sizes, 3mm thick compressed asbestos fiber jointing gasket / synthetic rubber gasket confirming to relevant BIS codes including all kinds of flanged short pieces, bends, tees & other specials etc made from parent tubes & welded with flanges of tables as applicable for the particular reach as per site conditions including flushing, cleaning & hydraulic testing as per directions of Engineer-in-charge.
290
-
-
... More
Water Treatment Plant 2.0 MLD (Refer Vol-II, Data Sheet No 4 and Vol.-III Technical specification Part-III)
-
-
-
... More
Providing, installation, testing and commissioning of 1 No water treatment plant ( 2.0 MLD) in Rapid sand filters including cost of construction of civil works, hoisting and errection of all steel works, providing and installation of all mechanical, Electrical equipments/accessories, laying of all interconnecting GI/MSERW pipes and scouring arrangements from all units with disposal of the same to the boundary of structures, all types of valves, fittings and all contingent works capable of taking input and giving output as laid down in chapter-I of CPHEEO manual under all climatic conditions specified therein. The treatment plant shall include but not limited to Raw Water Tank ,inlet strcuture/ channels/Pipe,Inlet Chamber, Parshall flumes C/O pre-Sedimentation tank,wash lime solution tanks, Alum solution tanks with Dozer Flash mixing ,Mechnical Clariflocculator,Rapid sand filters, filter house, pannel rooms pipe gallery, and clear water tank, chemical house, chemical handling and feeding arrangements,with safety measure, back wash units with pumping sets and rising main for back wash tank and Air compressors including arrangements for disposal of waste of water treatment plant process, Plant building comprising of Lab with equipments, office furniture, Providing and fixing of lightening arrangements complete in all respect (LED 8 NOs minimum, 100W each ) in the boundary unit of WTP , Providing and fixing all electrical/Mechanical equipments, proper walk way for Inspection/ operation of various units, interconnecting paths within WTP. Providing and setting up of all laboratory equipments etc as per CPHEEO manuals appendix 15.90 (category-II) of 1999 addition shall be provided . Sizes of various units shall be based on manual of water supply and treatment published by CPHEEO, Ministry of Urban development (GOI) New Delhi. The design of various units shall conform to relevant Codes and specifications. All the hydraulic stuctuctures shall be designed and constructed in RCC as per latest IS codes. The cost shall include site development works, i.e. cutting,filling, constrcution of retaining walls,breast wall & boundary walls. Trial run period for one year after commissioning including O&M during trial run period i.e one year after commissioning . The cost also include strcutural & hydraulic design of WTP in Rapid sand filter ,vetting of design and drawing from IITs/ NITs and supplying 5 number hard copies .All ancilliary works and accessories required to make the system fully functional shall be included in cost of work.Nothing extra shall be paid on this account. Work includes construction of civil works of WTP, Plant building and rates of these itemes shall only be quoted here. Electromechanical equipments and other accessories for WTP is part of item No. 10.01 and rates of electromechanical equipments shall be quoted against that item.
1
-
-
... More
Pump House & pumping machinary (Refer Volume-II- Data sheet 5, Data sheet 6, Data sheet 7 and Vol.-III Technical specification Part-IV & V)
-
-
-
... More
Designing, Constrcuting,Testing & commissioning of aesthetically designed ( to be approved by competent authority) pump house & Chowkidhar room including wash room at WTP including all allied Civil works,Electrical works,Sanitary installations,Site development works including cutting / excavation in all kinds of soils,retaing & breast walls , connectivity to sewer network,internal and external LED lightning works,Fire fighting arrangments, doors,windows, foundation & base plates for pumping machnaries etc. complete in all manner as directed by Engineer-in -charge. All anciallary items and works required to make the system fully functional shall be included in cost. The cost of priming painting of all surface shall be included nothing shall be paid extra on this account.
1
-
-
... More
Providing & installation at site of submersible pumping set of (KSB /Kalama/Kirloskar/Johnston/Cromption/BS) or any approved make conforming to BIS; 8034-1976 latest suitable for lifting clear water (latest with uptodate ammendments) fitted with bronze impellers/suitable alloy directly coupled to squirrell case electric induction motor of same make as (manufacurer standard) conforming to BIS; 9283-1979 (latest with uptodate ammendments) with minimum IE2 specifications and totally water proof for submersible duty, isolated from the pump by intermediate casing with double mechanical seal in oil chamber, grease packed lubricated bearings & provided with stainless steel thrust bearing plate to with stand vertical loads with minimum wear & tear. It should also be fitted with a device to take up expansion of water with the heating of motor including water level guard,errection clamps,cable clips & depth gauge etc. including all accessories (2 Nos set, 1 No working and 1 no standby). The pump shall be suitable for operation on data given below:- Booster -1st Discharge- 3.65 LPS Total head= 50.33 mtr
Suction lift- 0.034 M
Turbidity 50PPM
Pumping hours 23
Temperature 20 degree c
LWL in sump well = 1061.76 mtr
shaft level = 1061.76 mtr
Level at discharge point = 1103.08 mtr
Length of rising main = 395 mtr Booster 2nd
Discharge- 3.65 LPS Total head= 52.99 mtr
Suction lift- 0.034 M
Turbidity 50PPM
Pumping hours 23
Temperature 20 degree c
LWL in sump well = 1062.08 mtr Shaft level = 1062.08 mtr Level at discharge point = 1103.08 mtr Length of rising main = 595 mtr
1
-
-
... More
Providing & installation of horizontal spindle,horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stage centrifugal pump or combination of pumps, In series/parallel of recommended make such as Mather and Platt/KSB/ Beacon Weir/Kirlosker/BE/Jyoti Grandfos and approved make as per BIS 1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characterestics with bronze,impellers/priming funnels,casing ring and shaft sleeves of bronze,shaft of steel grade 4508 FN8 with cast iron casing coupled directly through a flexible coupling on a common MS/Cast steel base plate (base plate to be from the manufacturer of the pumping unit only) to slip ring/ squirrel cage screen protected drip proof induction motor /motors of standard make such as Kirlosker/BHEL /Crompton /NGEF /GEC/Siemens/Jyoti /ABB and suitable for operation on 400(+/-)10% volts,50 cycles /second.3 phase AC electric supply with minimum IE2 specification. The power of electric motor/motors should be at +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15% of the duty point head. The motor/motors as per ISI:325:1978 with upto date ammendments read with IS 900:1972. It should include cost of bearing nuts , bolts and painting etc. (4 Nos sets= 2 Nos working and 2 Nos standby) and should meet the following requirements: Main Stage
Discharge- 15.76 LPS
Suction lift- 0.507 M
Turbidity 50PPM
Pumping hours 23
Temperature 20 degree c
Total head= 177.02 mtr
LWL in sump well = 1103.08 mtr Shaft level = 1103.58 mtr
Level at discharge point = 1269.10 mtr
Length of rising main = 2520.00 mtr
1
-
-
... More
Rising Main (Refer Vol-II, Data Sheet No 8 and Vol.-III Technical specification Part-II)
-
-
-
... More
Excavation in foundation, trenches ( for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge
2316
-
-
... More
Rising Main-Providing, laying, jointing (by way of circumfrential butt welded joints by electrical arc welding and testing of MSERW pipe of250 mm dia with wall thickness of 4.80 mm confirming to ISO 3183-2007, Grade of pipe X 42 or L290 (latest with upto date amendments) having wall thickness as specified below with bevelled ends and capable of withstanding required test pressure in a random length of 4 to 7 meters, including manufacturing reduders/tapers, all short pieces, bends etc. as per site requirement made from parent tube. The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees, etc. including loweringand laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfation of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per relevant IS standards and the damaged portion of the pipes and specials made from the parent tube shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfation & Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately)
2520
-
-
... More
Tube well to CWT-Laying, jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of Galvanised mild steel tubes (GI Pipes) of 80mm diameter with wall thickness 4.80 mm confirming to BIS 1239-2001 (latest with upto date amendments) having wall thickness as per code with bevelled / plain ends in a random length of 4 to 7 meters, including manufacturing reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The damaged portion of the pipes and specials made form the parent tube during welding or otherwise shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately). (Heavy class)
792
-
-
... More
Tube well to CWT-Laying, jointing and testing in trenches to be levelled to grades, GI flanged pipes of 80mm diameter with wall thickness 4.00 mm,confirming to IS:1239-1990( Part-II) having minimum wall thickness as per IS code and class of pipes specified below, provided and jointed with flanges conforming to tables-5 as specified under BIS 6392-1971 welded at both ends according to relevant BIS standards and detailed specifications and provided with nut & bolts of required sizes, 3mm thick compressed asbestos fiber jointing gasket / synthetic rubber gasket confirming to relevant BIS codes including all kinds of flanged short pieces, bends, tees & other specials etc made from parent tubes & welded with flanges of tables as applicable for the particular reach as per site conditions including flushing, cleaning & hydraulic testing as per directions of Engineer-in-charge. (Heavy class) ( Flanges at 3 meter interval)
198
-
-
... More
Main Reservoir & Sector reservoirs (Refer Vol-II- Data sheet Number 9 and Vol.-III Technical specification Part-II)
-
-
-
... More
Designing, Constructing, Testing & Commissioning RCC Circular under ground/partial under ground storage reservoirs as per capacity given below at various stages/sites including excavation & cutting in all kinds/ types of strata, soil strata including dewatering if required.The design mix of M30 shall be used in foundation, walls, bottom slab , roof slab/dome with smooth finishing including all alied Civil Works, Site development, cutting/excavation in all kinds of soils, refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe with bye pass arrangement consisting of GI / MS pipes and valves of required classes and dia and all other accessories required such as MS ladders inside and outside CI cowl type ventilator, SFRC manhole covers including frames and covers (medium duty) with proper locking arrangement water level, indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code. The cost of valves shall be included in the rates of tanks. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work.The cost shall also include providing strcutral design & drawing duly vetted from IITs/ NITs in 5 number hard copies. The rates quoted by the contractor shall be for the complete work nothing extra shall be paid on this account.
-
-
-
... More
Main storage tank 1180000 ltr capacity at Node No-4.
1
-
-
... More
Sector storage tank 270000 ltr capacity at Node No-5
1
-
-
... More
Sector storage tank 590000 ltr capacity at Node No-6
1
-
-
... More
Sector storage tank 300000 ltr capacity at Node No-2 ward No-7
1
-
-
... More
Designing, Constructing, Testing & Commissioning RCC Circular overhead storage reservoirs of 230000 Litre capacity including excavation & cutting in all kinds/ types of strata, soil strata including dewatering if required.The design mix of M30 shall be used in foundation, columns, walls, stagging, bottom slab , roof slab/dome with smooth finishing including all alied Civil Works, Site development, cutting/excavation in all kinds of soils, refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe with bye pass arrangement consisting of GI / MS pipes and valves of required classes and dia and all other accessories required such as MS ladders inside and outside CI cowl type ventilator, SFRC manhole covers including frames and covers (medium duty) with proper locking arrangement water level, indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The scope shall also cover the cost of stairs in M-30 for various levels and cost of bracings, MS railings etc. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code. The cost of valves shall be included in the rates of tanks. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work.The cost shall also include providing strcutral design & drawing duly vetted from IITs/ NITs in 5 number hard copies. The rates quoted by the contractor shall be for the complete work nothing extra shall be paid on this account.
1
-
-
... More
Distribution Network ( Refer- Volume-II Data Sheet No 10 and Vol.-III Technical specification Part-II)
-
-
-
... More
Excavation in foundation, trenches ( for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge.
4600.09
-
-
... More
Laying, jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of Galvanised mild steel tubes (GI Pipes) of 100mm dia, with wall thicknes 4.80 mm confirming to BIS 1239-2001 (latest with upto date amendments) having wall thickness as per code with bevelled / plain ends in a random length of 4 to 7 meters, including manufacturing reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The damaged portion of the pipes and specials made form the parent tube during welding or otherwise shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately).(Ward No 1 to 6)
4539
-
-
... More
Laying , jointing and testing GMS tubes , tube fittings complete. (excluding earth work ) in all leads and lifts and as per entire satisfaction of Engineer - in - charge , including cost of all fitings and joint material.
-
-
-
... More
80mm dia
1987
-
-
... More
100mm dia
584
-
-
... More
125mm dia
238
-
-
... More
150mm dia
108
-
-
... More
Fire fighting Works ( Refer- Volume-II Data Sheet No 11 and Vol.-III Technical specification Part-II)
-
-
-
... More
Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost to the entire staisfaction of Engineer-in-charge with in all leads and lifts
7260
-
-
... More
Laying, jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of Galvanised mild steel tubes (GI Pipes) of 100 mm dia GI Medium, wall thickness 4.80 mm, confirming to BIS 1239-2001 (latest with upto date amendments) having wall thickness as per code with bevelled / plain ends in a random length of 4 to 7 meters, including manufacturing reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The damaged portion of the pipes and specials made form the parent tube during welding or otherwise shall be provided anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The rates also includes entire carriage of material, flushing, cleaning & hydraulic testing complete to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (Earth work in trenches will be measured and paid for separately).
4750
-
-
... More
Laying, jointing and testing in trenches to be levelled to grades, GI flanged pipes of 100 mm diameter confirming to IS:1239-1990( Part-II) having wall thickness of 4.80 mm as per IS code and class of pipes specified , provided and jointed with flanges conforming to tables as specified below of BIS 6392-1971 welded at both ends according to relevant BIS standards and detailed specifications and provided with nut & bolts of required sizes, 3mm thick compressed asbestos fiber jointing gasket / synthetic rubber gasket confirming to relevant BIS codes including all kinds of flanged short pieces, bends, tees & other specials etc made from parent tubes & welded with flanges of tables as applicable for the particular reach as per site conditions including flushing, cleaning & hydraulic testing as per directions of Engineer-in-charge.
250
-
-
... More
Providing and fixing of Brass Spindle Fire Hydrants with 63mm outlet as per moderate fire safety measures for Hilly areas, complete hydrant with all fittings as required for proper functioning of Fire Hydrant within all lead and lift as per entire satisfaction of Engineer in Charge.
16
-
-
... More
SCADA based Automation ( Refer Vol-II, Data Sheet No 12 and Vol.-III Technical specification Part-VI)
-
-
-
... More
Engineering, design,Installation, Testing and Commissioning of SCADA based automation of WTP (2.0 MLD ),Pumphouse , Tanks ,Rising Main, Tank to tank Pipe mains, tube wells 2 nos etc including Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure compelte in all respect. The work also includes supply and installation of electromehcanical equipments for WTP.
1
-
-
... More
Flow meters & DG Set ( Refer Vol-II Data Sheet No 13 and Vol.-III Technical specification Part-VI)
-
-
-
... More
Providing and fixing of electromagnetic/multi jet flow meter of Krohne /Marshal I/Siemens/ ABB/SBEM/ George Fishers/E &H. Itron Make at consumer end fixed in heavy duty Pvc box for meter including all fittings i.e Diert Box, NRV, Union, Elbow and Peet Valve as required at site complete in all respect for proper functioning in accordance to relevant BIS and specification with in all lead and lift as per entire satisfaction of Engineer in Charge.
790
-
-
... More
Providing and fixing of Flow meter of Krohne /Marshal I/Siemens/ ABB/SBEM/George Fishers/E &H. Itron Make at outlet point fixed in heavy duty Pvc box for meter including all fittings i.e Diert Box, NRV, Union, Elbow and Peet Valve as required at site complete in all respect for proper functioning in accordance to relevant BIS and specification with in all lead and lift as per entire satisfaction of Engineer in Charge.
10
-
-
... More
Providing and fixing of Flow Reducing Valve of Krohne /Marshal I/Siemens/ ABB/ SBEM/George Fishers/E &H. Itron Make at consumer end fixed in heavy duty Pvc box for meter including all fittings i.e Diert Box, NRV, Union, Elbow and Peet Valve as required at site complete in all respect for proper functioning in accordance to relevant BIS and specification with in all lead and lift as per entire satisfaction of Engineer in Charge
4
-
-
... More
Supply, installation and errection of 40 KVA Three phase silent DG Set of approved make for required load complete job as per JSV specifications including all taxes, transportations, freightcharges, loading unloading, conveyance to departmental store / site, stacking etc. including specials and wastages etc. complete with in all lead and lift as per entire satisfaction of Engineer in Charge.
1
-
-
... More
Supply, installation and errection of 100 KVA Three phase silent DG Set of approved make for required load complete job as per JSV specifications including all taxes, transportations, freightcharges, loading unloading, conveyance to departmental store / site, stacking etc. including specials and wastages etc. complete with in all lead and lift as per entire satisfaction of Engineer in Charge.
1
-
-
... More
GIS BASED MAPPING OF CONSUMER HOUSE HOLD ( Refer Vol-II Data Sheet No 14)
-
-
-
... More
GIS mapping of each house connection in ward No-7 to make complete ward no-7 competent with AMRUT-2.0 guidlines complete in all respect within all leads and lifts and to the entire satisfaction of Engineer in charge.
1
-
-
... More
Operation & Maintenance ( Refer Vol-II Data Sheet No 15 and Vol.-IV Technical specification )
-
-
-
... More
Operation and maintenancce of scheme from source to WTP ( 2 Nos-1 Existing 1.56 MLD,1 New-2.0 MLD), Gravity main,pumphouse,rising main,distribution network including fire hydrants and fire network ,all storage tanks (Proposed as well as existing sector storage tanks) of the scheme including operating SCADA based automation in proper working condition. O & M includes the regular i.e., daily supply of designed/required quantity of potable water having water quality as per of water supply standard/protocol to the beneficiaries of the scheme from source to WTP and up to main storage tanks & delivery tanks at different locations as per plan and repair and maintenance of Rising mains, Gravity mains. Regular maintenance of all the facilities covered under the instant scheme including cleaning, washing, oil and greasing repair, replacement of worn out/damaged part of pumping machinery. pipe line, valves and electrical, Mechanical requirements, regular cleaning of all structures like storage tanks, sumpwells, intakes, channels, collection/distribution channels/pump house etc. and the disposal of the same as per the direction of the Engineer-incharge. It includes fixing /repairing/leakage in structure, channel, pipe line, pumping machinery etc. & proper distribution of treated water and regular testing of water samples from departmental laboratory and required stages of treatment. Keeping regular and proper record of water quantity and quality, repair and maintenance work, chemical dosing and time and hours of run of pumping machinery, removal of all kind of slips, slush, uprooting of unwanted grass, shrubs, weeds etc growing near the structure and keeping the area neat and clean to the entire satisfaction of Engineer-in-charge. Planting and maintaining plants of the flowers/trees around the Pump Houses/ WTP/Storage tanks/Sump wells etc. to the entire satisfaction of Engineer-in-charge. It includes the cost of procurement of adequate and proper tools and plants, skilled & unskilled manpower, spare-parts, oil, grease, lubricants, chemicals and all kinds of regents required for water sample testing, refilling of gaseous cylinders including mechanical and head load carriage etc. and making standby arrangement all times, instruments, equipments, stationary and any other material etc. required for O& M excluding the cost of energy charges. All the operations shall be carried out as per the CPHEEO Manual of the water supply and treatment( with latest addition(, HPPWD/HPIPH specifications, HPIPH Department norms and directions issued by the Engineer-in-Charge from time to time and sound Engineering practices.O& M shall start after succesful trial and run period of six months after commisioning of scheme in all respect.
( Refer to data sheet No-15)
-
-
-
... More
Ist year after trial run period of Six Months
1
-
-
... More
2nd Year
1
-
-
... More
3rd Year
1
-
-
... More
4th Year
1
-
-
... More
5th Year
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements