Himachal Pradesh Agriculture Development Society Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh Agriculture Development Society Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date23 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 94,93,700
Costs
EMD
₹ 1,28,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPCDP_90910_1Bid Award Id
ViewTender No
F(5)-102/2024-609dt23.08.2024Tender Authority
Himachal Pradesh Agriculture Development Society ViewPurchaser Address
-Website
http://http://hpcdp.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation work by mechanical means / manual means in foundation trenches or drains , including dressing of sides and ramming of bottoms , lift up to 1.5 mtr. Including getting out the exvcavbated soil and disposal of surplus excavated soil as directed , within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
42.12
-
-
Dismantling of old plaster or skirting raing out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
687
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
Foundations, footings, bases for columns, mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
168.67
-
-
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
173.82
-
-
Suspended floor , roofs , landing , balconies and access plateform etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
88.9
-
-
Edges of slab and break in floor and walls complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
836.2
-
-
Extra Allowance for formwork in concrete lining in:
-
-
-
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
342.19
-
-
In sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
394.83
-
-
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
202.37
-
-
Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in retaining walls, return walls , walls (any thickness including attached plasters , columns, piers, abutments, pillars, post , struts buttresses, string aur or lacing courses, parapets, coping , bed blocks , anchor block plain windows sills , fillets sunken floors etc.up to five level , excluding the cost of centering , shuttering and finishing complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
51.32
-
-
Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of centering and shuttering for all work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
-
-
-
All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
1.38
-
-
In retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed, bkocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering & finishing cpmplete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
1.39
-
-
Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in :
-
-
-
All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
48.56
-
-
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
11.27
-
-
In beams, suspended floors, roofs having slope upto 15 degree landing , balconies, shelves, chajjas, lintel , bands, plain window sills, staircase and spiral stair cases above plinth level up to floor five level , excluding the cost of centeringb , shuttering , finishing and reinforcemen with 1:1.5:3 ( 1 cement : 1.5 coarse sand:3 graded stone aggregates 20 mm nominal size) complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
21.98
-
-
Providing cement concrete lining 15 cm thick or less for irrigation channels, using cement concrete 1:2:4 (1 cement2 sand :4 stone aggregate 20 mm nominal size) in:
-
-
-
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
342.79
-
-
Side slopes complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
394.83
-
-
Providing and Laying Stone/ Boulder filling behind the Retaining wall , also under floor and upstream of i/ gallery/ under floor etc.complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
1.5
-
-
Cement concrete flooring 1:2:4(1 cement :2 coarse sand :4 graded stone aggregates) finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
719.55
-
-
20 mm cement plaster 1:4 (1 Cement :4 Sand ) of mix, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
989.46
-
-
Chiesling / wedging out of rock (where blasting is prohibited) chesling work in hard rock complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
1
-
-
Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
3779.39
-
-
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
828.82
-
-
Providing and fixing CI Sluice Valve of following dia & class of Leader / Kartar / Kirloskar make with MS Flange of Table 5 as per IS 6392-1971 & welding of MS Flanges in two layers on both faces complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
-
-
-
150 mm dia, PN-1.0 (10.2 Kg/cm²)
2
-
-
Clearance of silt / malwa including getting out the excavated soil and disposal of surplus excavated soil as directed within lead complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
29.58
-
-
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS:16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter 2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
6
-
-
Providing, laying, jointing , commissioning and testing in trenches (to level or grade) GMS tubes confirming to IS : 1239: 2004 of 150 mm dia, medium class with all necessary fittings conforming to IS specification capable to withstand the required hydraulic test pressure as per IS code in random length of 6.00 mtrs. including flushing , cleaning and hydraulic testing of pipe complete in all respect within all leads and lifts and to the entire satisfaction of Engineer-in-Charge.
18
-
-
Providing, laying, jointing, commissioning & testing in trenches HDPE pipes of following diameters & classes as per IS 4984 (1995) and jointing the pipes with push type compression joints by hydraulically operated machines, butt fussion welding & electro fusion welding machines i/c necessary fittings, bends, tees, unions, flanges, collars & reducers etc. confirming to IS 8360 & IS 8008 with latest ammendments & shall be provided as per site conditions. Flanging of the pipes shall be made as & where required. Jointing shall be confirming to IS code 8008 & IS 7634, stub ends will be welded on pipes & MS flange shall be provided with slip on covered by epoxy coating/plastic powder. The flange should be confirm to ANSI B 16.5 with necessary nuts & bolts. All manufacturing maerial used shall be in accordance to IS 4427-2007 (latest revision) with 100 % virigin pre-compounded or natural PE resin. Jointing shall be complete in all respects i/c testing at site upto entire satisfaction of the Engineer-in-Charge. For Approved makes as per the list Enclosed in bidding Document Page No. CF-8.
-
-
-
90mm Dia (PN-6,PE-100) (for weep holes)
16.94
-
-
Cutting of MS Plate permanent engraving marked scale/calibration on the plate and fixed at the site of work.
1
-
-
Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
2132.5
-
-
Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
3.45
-
-