Himachal Pradesh Agriculture Development Society Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh Agriculture Development Society Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date3 Feb 2024
Closing Date12 Feb 2024
Tender Amount₹ 51,05,100
Costs
EMD
₹ 83,600Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
C/o Flow Irrigation Scheme Nannayia
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPCDP_85082_1Tender No
No.AGR. DPMU. KGR. F (7) Tender/13/2022-4204Tender Authority
Himachal Pradesh Agriculture Development Society ViewPurchaser Address
-Website
http://http://hpcdp.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
Foundations, footings, bases of columns,etc. for mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
488.76
-
-
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
115.13
-
-
Suspended floors, roofs, landings, balconies and access platform complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
12.26
-
-
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
0.96
-
-
Edges of slabs and breaks in floors and walls under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
19.4
-
-
Extra Allowance for formwork in concrete lining in:
-
-
-
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
156.65
-
-
In Sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
159.97
-
-
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
190.66
-
-
Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
28.88
-
-
Providing cement concrete lining 15 cm thick or less for irrigation channels, using cement concrete 1:2:4 (1 cement2 sand :4 stone aggregate 20 mm nominal size) in:
-
-
-
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
89.3
-
-
Side Slopes complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
93.61
-
-
Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete
-
-
-
All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
0.18
-
-
Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in :
-
-
-
All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge
132.36
-
-
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
67.55
-
-
In beams, suspended floors, roofs having slope landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
0.31
-
-
Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
9132.35
-
-
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
1036.23
-
-
Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
3.45
-
-
Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
2116.95
-
-
Providing, laying, jointing, commissioning & testing in trenches HDPE pipes of following diameters & classes as per IS 4984 (1995) and jointing the pipes with push type compression joints by hydraulically operated machines, butt fussion welding & electro fusion welding machines i/c necessary fittings, bends, tees, unions, flanges, collars & reducers etc. confirming to IS 8360 & IS 8008 with latest ammendments & shall be provided as per site conditions. Flanging of the pipes shall be made as & where required. Jointing shall be confirming to IS code 8008 & IS 7634, stub ends will be welded on pipes & MS flange shall be provided with slip on covered by epoxy coating/plastic powder. The flange should be confirm to ANSI B 16.5 with necessary nuts & bolts. All manufacturing maerial used shall be in accordance to IS 4427-2007 (latest revision) with 100 % virigin pre-compounded or natural PE resin. Jointing shall be complete in all respects i/c testing at site upto entire satisfaction of the Engineer-in-Charge.
-
-
-
90 mm dia HDPE pipe (PN 4.0, PE 80)
16.59
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements