Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh Agriculture Development Society Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date9 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 56,02,240
Costs
EMD
₹ 88,530Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Flow Irrigation Scheme Bhaloon
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPCDP_92881_1Tender No
No.AGR. DPMU. KGR. F (7) Tender/13/2022-1938Tender Authority
Himachal Pradesh Agriculture Development Society ViewPurchaser Address
-Website
http://http://hpcdp.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
267.82
-
-
Suspended floors, roofs, landings, balconies abd platform complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
24
-
-
Extra Allowance for formwork in concrete lining in:
-
-
-
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
133.55
-
-
In Sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
162.18
-
-
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
184.33
-
-
Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete
-
-
-
All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
48.98
-
-
Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in :
-
-
-
All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge
134.8
-
-
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
201.24
-
-
In beams, suspended floors, roofs having slope landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
14.4
-
-
Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
18482.8
-
-
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
1232.18
-
-
Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
19.35
-
-
Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
2091.6
-
-
Providing, laying, jointing, testing & commissioning at site in trenches bevelled ended BIS marked MSERW pipes 250 mm dia of various grade conforming to IS/ISO-3183-2012 L260 or X42 or its equivalent specifications latest with upto date amendments of following dia with upto date amendments having wall thickness and per Rmt weight as mentioned below & capable of withstanding required test pressure as prescribed in BIS code in random lengths of 6 to 7 mtr. The pipes ends shall be bevelled suitable for butt welding including the cost of jointing with butt welding conforming to IS 816-1969 or latest as applicable ends with upto date amendments (leak proof) in three layers at site of work with welding rods of standard make and all allied accessories whatever required for welding at site, tail pieces, tees, bends and other specials manufactured from parent pipes as applicable to the particular reach & of approved specification as per site conditions and cutting of pipes wherever required as per site requirement including carriage in all leads and lifts and as directed by Engineer-in-charge. The pipe shall haves zinc coating inside & out side conforming to IS/ISO-4736-1986 or latest with upto date amendments & shall be engraved with code IS/ISO-3183-2012 or its equivalent. The laying shall conform to BIS 5822-1970 or latest with upto date amendments with provision of scour pipe after every km by providing Tee & Sluice valve etc. complete to the entire satisfaction of Engineer-in-charge (Earth work shall be measured and paid for separately).
12
-
-
Providing & laying HDPE pipes of 250 mm diameters and classes as perIS 4984, PE-100 and fixing in existing chambers at site including dismantling the requisite pipe opening area of chamber, complete in all respects i/c testing at site upto entire satisfaction of engineer incharge. Providing HDPE pipe 2m length each, both side of the O/L chambers.as per approved manufactures as per the list attached in Bidding Document page no:- .CF 10
28
-
-
Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. 125mm complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge
3
-
-
Restoration charges for road crossing as per HPPWD Norms for metalled and tarred road with bituminous macadam complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
12
-
-