Cement Corporation Of India Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Cement Corporation Of India Limited - CCI Tender

Works
Machinery and Tools
Eprocure
Opening Date25 Jul 2024
Closing Date13 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling & Erection of cooler tube for cold zone area along with discharge chute

1

-

-

... More
Structural & plate work like ducts, chutes, bends and transition pieces.

-

-

-

... More
1.fabriction and finishing work

5

-

-

... More
2. Dismantling and shifting work

5

-

-

... More
3. Erection welding and finishing work

5

-

-

... More
Dismantling & Erection of Lining Plates of Raw Mill, Cement Mill and Coal Mill

-

-

-

... More
(i) Dismantling**

15

-

-

... More
(ii) Erection and retightening*

25

-

-

... More
* retightening after operation of 8-12 hrs.

-

-

-

... More
Dismantling Weight will be 60 % of new plates

-

-

-

... More
Dismantling & erection of transport pipe upto 6” dia in the plant including shifting of material from store to site

50

-

-

... More
Dismantling & erection of transport pipe of above 6” dia in the plant including shifting of material from store to site

50

-

-

... More
Replacement of various sizes of Gear boxes/fans/motors/ any machineries items etc any (size) with alignment at any elevation during shutdown/ break down.

-

-

-

... More
i) Dismantling and shifting

8

-

-

... More
ii) Installation and alignment and finishing work

8

-

-

... More
Note:- All allied works like dismantling/fitting of couplings, gearbox internals, etc as and when required are included in above jobs.

-

-

-

... More
Dismantling and fitting of counter shaft/membrane coupling of raw mill, coal mill, cement mill and kiln.

2

-

-

... More
Dismantling & Replacement of drag chain links, Enmass conveyor, ESP & GCT drag chain links

50

-

-

... More
Dismantling & Replacement of drag chain bottom supporting plate

5

-

-

... More
Replacement of belt conveyor from 500 MM to 1200 MM size.

100

-

-

... More
Welding and patch work at various elevations

-

-

-

... More
i.      Upto 25 meters

100

-

-

... More
ii.    Above 25 meters

100

-

-

... More
Dismantling, erection & replacement of head & tail drums of clinker drag chains, bucket elevators, Enmass conveyors installed in different sections.

-

-

-

... More
i) Dismantling of head & tail drums complete in all respect

2

-

-

... More
ii) Erection of head & tail drums complete in all respect

2

-

-

... More
Dismantling, Fabrication, erection of Retainer Ring ranging from 25mm to 50mm thickness and 100 to 150 wide at kiln (Kiln shell to be ground after cutting of old retainer ring)

-

-

-

... More
i) Dismantling

15

-

-

... More
ii) Fabrication

15

-

-

... More
iii) Erection

15

-

-

... More
Dismantling & erection of seal steel spring plates at kiln inlet.

100

-

-

... More
Fabrication, dismantling and erection of mother plate at kiln inlet seal.

10

-

-

... More
Dismantling & erection of conical segments, lip plates, spouts etc. at kiln inlet and outlet (HRCS Item).

-

-

-

... More
Dismantling*

1

-

-

... More
Erection

2

-

-

... More
*Dismantling weight will be 60% of new plates

-

-

-

... More
Complete Checking of Bucket Elevators, replacement of damaged chain links, buckets and U-Bolts.

-

-

-

... More
i) Complete checking of bucket elevators & tightening of U-Bolts, chain links & buckets

3

-

-

... More
ii) U-Link replacement

50

-

-

... More
iii) Chain link set replacement

50

-

-

... More
iv) Bucket dismantling & erection

25

-

-

... More
Replacement of weigh feeder endless belts of kiln feed, clinker, fly ash, limestone, shale, packing plant etc.

-

-

-

... More
i) 650 mm wide

1

-

-

... More
ii) 800 mm wide

4

-

-

... More
iii) 1200mm wide

1

-

-

... More
i) Removal/replacement of new dust collector bags

100

-

-

... More
ii) Cleaning of old dust collector bags

100

-

-

... More
Replacement of Hammers in hammer crushers of mines and plant.

-

-

-

... More
b) Single hammer weight 16 kg (24 nos/set)

1

-

-

... More
c) Single hammer weight 9 kg (57 nos./set)

2

-

-

... More
i) EOT crane rope replacement

200

-

-

... More
ii)) EOT crane bucket pin replacement

4

-

-

... More
iii) EOT crane bucket pin &bush assembly replacement

2

-

-

... More
iv) EOT crane wheel replacement

4

-

-

... More
Note:

-

-

-

... More
1) Please do not quote your rates in this format.

-

-

-

... More
2) Quantity of dismantling of lining plates at S. No. 8 (i) shall be considered 60% of the weight of new lining plate.

-

-

-

... More
3) Shifting of dismantled transport pipe and erection of the pipe at height is to be transported by the contractor.

-

-

-

... More
4) All the activities in the scope of work are not necessarily is utilized during the contract. The work can be done based on actual requirement at site. The contractor shall not claim for the less work given to him

-

-

-

... More
5) All gas cutting sets should be fitted with flash back arrestors at both the ends

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.