Bus Stands Management And Development Authority Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Bus Stands Management And Development Authority Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Aug 2022
Closing Date13 Sep 2022
Tender Amount₹ 21,50,469
Costs
EMD
₹ 39,800Document Cost
₹ 1,500Tender Fee
Refer Documents
Summary
Special Repair To Hrtc Bus Stand At Sarhan Distt- Sirmour Hp
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_BSMDA_64237_5Bid Award Id
ViewTender No
HPBSMDA/EE/(2)/2021 Tenders Vol-IIITender Authority
Bus Stands Management And Development Authority ViewPurchaser Address
-Website
http://http://hpctbsmda.com/page/History
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Centering and shuttering including strutting, propping etc. and removal of form for :- (i) Foundations, footings, bases of columns, etc. for mass concrete is all leads and lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer-in-charge.
34.95
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for:- (ii) Column, pillars posts, cement concrete struts square rectangular or polygonal in plain, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
252
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for:- (iii) Beams, cantilevers, girders and lintels. Sides and soffits of beams, beam hunching cantilevers, bressumers and lintels in all depths and in all heights from floor, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of work shall be absolute responsibility of the contractor the Engineer in charge.
155.52
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for:-(iv) Flat surfaces such as soffits of suspended floors, roofs, landings and the like, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
145.08
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for:-(v) Edges of slabs and breaks in floors and walls, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
87.6
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in super structure above plinth and upto floor V level is all shape and size in:- Cement Mortor 1:4 (1 Cement :4 Sand ) in all leads lift i/c carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
27.73
-
-
... More
12 mm ( Twelve milimeter) millimetres thick cement plaster in single coat on the fair side of brick/concrete/stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80(Eighty) millimetres in girth and finished even and smooth in cement mortar 1:6 (One isto six ) (One cement isto Six sand), as per HP.PWD. Specification, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
157.82
-
-
... More
15mm millimetres thick cement plaster in single coat on the rough side of brick/concrete/stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80(Eighty) millimetres in girth and finished even and smooth in cement mortar 1:6 (One cement isto Six sand), as per HP.PWD. Specification, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
111.6
-
-
... More
Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position including cost of binding wire complete as per structural drawing in all floors up to all heights and levels, direction of Engineer-in-Charge and as per HP.PWD. Specification, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
10719
-
-
... More
25 mm ( Twenty five milimeter) thick kota stone slab flooring 20mm ( Twenty milimeter) ( Average) thick base of cement mortar 1:4 (One isto four) laid over and jointing with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete. as per HP.PWD specification 1990 volume-I, including carriage of all labour equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
54
-
-
... More
Kota stone slab flooring 25 mm ( Twenty five milimeter) thick in rises of steps, skirting,or dado and pillers laid on 12 mm ( Twelve milimeter) (average) thick cement mortar 1:3 ( One cement isto Three sand) laid over and jointing with grey cement slurry mixed with pigment to match the shade of the slabs including rubbing and polishing complete. as per HP.PWD. Specification, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
4.8
-
-
... More
Supplying and fixing rolling shutters of approved make made of 80 mm X 1.25mm (Eighty milimeter into One point twenty five ) M.S laths interlocked together through their entire length and joined together at the end by end locks mounted onspecially designed pipe shaft,with brackets side guides and arrangements for inside and outsidelocking with push pull operation complete but including the cost of top cover and spring Shutters having width below 3.5metres. sq.m. including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
55.8
-
-
... More
P/F ball bearing for rolling shutters, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
12
-
-
... More
6mm millimetres thick cement plaster in ceilling brick in cement mortar 1:6 (One cement isto Six sand), as per HP.PWD. Specification, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
72
-
-
... More
Providing and applying white cement based putty of average thickness 1 mm,( One milimeter) of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
341.42
-
-
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shadeNew work (two or more coats) over and including water thinnable priming coat with cement primerincluding carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
229.82
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm (Ten Square meter) over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (Ten square meter) including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
111.6
-
-
... More
Providing wood/work in frames of doors,windows,clerestory,windows and other frames wrought,framed and fixed in position:-sal wood, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
0.11
-
-
... More
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings /wooden frames with rawl plugs screws etc, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
33.98
-
-
... More
Applying priming coat over new wood and wood basedl surfacees after and including prepairing the surface by brushing to remove all dirt dust and other foregion matter. With ready mixed priming paint pink. as per HP.PWD specification, including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
2.52
-
-
... More
Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm (Ten square meter) of approved brand and manufacture.including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges., including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
2.52
-
-
... More
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm ( Ten square meter) over an under coat of primer applied @ 0.80 ltr/ 10 sqm (Ten square meter) of approved brand and manufactureincluding carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
2.16
-
-
Evaluation Notes How It Works ?
Potential Partner