RITES Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

RITES Limited - RITES Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date28 Apr 2023
Closing Date8 May 2023
Tender Amount₹ 38,40,450 
Notes
Download

Costs

Summary

Survey Work Using Drone For Fls Work Of Chitra Joramow New Bg Line 31km And Sita Rampur Jhajha 3rd Line 143.40 Km

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Bill of Quantity for the tender Document
Tender Documents of Survey Work for Chitra Joromow and Sitaram Jhajha FLS Work .
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Conducting control Points survey using DGPS/Total Station and Auto level for the complete alignment by marking it on the permanent structures or any temporary location depending upon the site condition. Primary control Points to be marked at every 2 Km and Secondary control points at every 500m . Transferring of elevation using Auto level. GCP at every 2 KM

86

20640

240

... More
Conducting control Points survey using DGPS/Total Station and Auto level for the complete alignment by marking it on the permanent structures or any temporary location depending upon the site condition. Primary control Points to be marked at every 2 Km and Secondary control points at every 500m . Transferring of elevation using Auto level. TBM at every 0.5 KM

264

63360

240

... More
Providing and fixing cast-in-situ or precast M-20 RCC concrete pillars pillars of size 15cm x 15cm x 90cm in 1:2:4 cement concrete proportion at every 100m interval as per Para 427E at any location as directed by Engineer - in-charge of the work with contractor's materials, labour, tools and plants including taxes and royalities. and Planting of concrete pillars of size 30cm x 30cm x 90 cm in 1:2:4 cement concrete proportion at every 500m interval and at the tangent point of curves as per para 428E and as per Scope of Work & Technical Specifications with Contractors' own materials, tools and plants; including all leads and lifts and crossing of track etc.; including all taxes and royalties complete; including painting, marking the pillars at site; including setting out of curves at site indicating transition portion, apex point and crown of curve, beginning and end. RCC Pillar size 150 x 150 x 900 mm

1400

770000

550

... More
Providing and fixing cast-in-situ or precast M-20 RCC concrete pillars pillars of size 15cm x 15cm x 90cm in 1:2:4 cement concrete proportion at every 100m interval as per Para 427E at any location as directed by Engineer - in-charge of the work with contractor's materials, labour, tools and plants including taxes and royalities. and Planting of concrete pillars of size 30cm x 30cm x 90 cm in 1:2:4 cement concrete proportion at every 500m interval and at the tangent point of curves as per para 428E and as per Scope of Work & Technical Specifications with Contractors' own materials, tools and plants; including all leads and lifts and crossing of track etc.; including all taxes and royalties complete; including painting, marking the pillars at site; including setting out of curves at site indicating transition portion, apex point and crown of curve, beginning and end. RCC Pillar size 300 x 300 x 900 mm

350

315000

900

... More
Carrying out Hydrographic survey for a stretch of 5 km. i.e. 3 km upstream and 2 km downstream of the proposed major bridge location by observing river cross-sections at an interval of every 500m along with three additional cross sections at the proposed bridge centre line and the other two at 50m intervals with all spill channels upstream being shown on the plan. These distances of 3km and 2km are to be taken as measured at right angles to the centre line of the Railway and not along the course of the river. The position of cross section of the riverbed should be marked on the survey plan. The level of the highest known flood and ordinary low water should be noted on each cross section. (ii) Investigation and collection of the following data (for major bridges): (a) Topographical details, catchment area with its shape (Oblong, fan etc.) and characteristics from the Survey of India maps. (b) Details of the course of the main stream and its tributaries. (c) Longitudinal slope of the main stream and average land slope of the catchment from the contours (d) Nature of soil in the catchment (rocky, sandy, loamy or clay etc.) (e) Extent of vegetation (forest, pasture, cultivated, barren etc.) (f) Probable changes that may occur in the catchment characteristics assessed by enquiries from the right sources. (g) Changes in the course of the channel. (h) The nature of the material through which the channel flows. (Whether it consists of boulder, gravel, sand, clay or alluvium.) The description should be based also on actual borehole particulars. (i) Bank erosion and bed scour observed at the bridge site in the case of alluvial rivers and the nature of material transported. (j) The maximum observed scour depth in the vicinity of the proposed bridge crossing. (k) Full description of bridges (as given below) existing both upstream and down stream from proposed crossing including relief and overflow structures: (i) Type of bridge including span lengths and pier orientation. (ii) Cross section near the structure, including the vertical clearance from water level to soffit of superstructures and direction of the current during floods. (iii) All available flood history-high water marks with dates of occurrence, afflux observed, damages caused with sources of information.(iv) Photographs of existing bridges, past floods, main channels and flood plains and information as to nature of drift, stream bed and stability of banks. (l) Factors affecting water stage at the proposed bridge site such as: (i) High flood levels of stream joining, (ii) Particulars of reservoirs and tanks existing or proposed to be constructed and approximate date of construction. (iii) Flood control projects on the stream or other structures which affect the flow in the stream. (iv) Character of floods-Whether steady, flashy or eddy forming etc. (m) Hydrological particulars & data such as low water level, high flood level, discharge data, flood velocity, rainfall records from local or nearby gauging stations of irrigation and flood control departments and local enquiries.

18

421200

23400



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.