Public Works Department Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 4,000Document Cost
₹ 500Tender Fee
₹ 1,180
Summary
Pwd/bwn/rs.1.99 Lacs/renovation Of Old Malaria Building 2nd Floor In Ch. Bansi Lal General Hospital At Bhiwani In Bhiwani Distt.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_HRY_144982_1Bid Award Id
ViewTender No
Bhiwani_Renovation Old Malaria Building Rs.1.99 laTender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://haryanapwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cupboard
7
-
-
... More
Windows
7
-
-
... More
Clear Storey window
15
-
-
... More
Dismantling cement conglemerate / terrazzo floors 25 mm to 50 mm thick without concrete base (HSR 8.26)
53.55
-
-
... More
Scraping of White wash and colour wash (8.32(a)
149.71
-
-
... More
Scraping of cement Plaster (8.32) ©
36.24
-
-
... More
Scraping brick dismantling from brick work in lime or cement (HSR 8.32€
2966
-
-
... More
Tile terracing with one layer of tiles, 22.86 cm X 11.43 cm X 3.81 cm laid dry over a layer of mud mortar including grouting with cementsand mortar 1: 3 and top surface to be left clean.(HSR 13.14)
113.32
-
-
... More
Providing & Fixing PVC Rainwater Pipe 6 kg. pressure of ISI mark in cement mortar during masonry work. (Note:- Reputed make PVC Pipe such as Supreme, Finolex, Prince will be used as approved by Engineer-in-charge. [HSR 13.89].
Note:- The Agency to whom the work is alloted will have to produce original bill/voucher for all quantity in token of proof of purchase of material.
(a) 100 mm dia PVC pipe 6 kg. pressure.
21.27
-
-
... More
Providing & fixing vitrified tiles of size 600mm x 600mm of approved make in flooring, laid in any pattern as specified over base of 20 mm thickcement coarse sandmortar 1:3 and jointed with white cement slurry mixed with pigment to match the shade of tiles. Note : Tile shall be of premium quality (first quality) of reputed manufacturer like:- NITCO, KAJARIA, SOMANI, JOHNSONS & JOHNSONS, ORIENT (HSR 14.89).
53.54
-
-
... More
12 mm thick cement plaster 1:5 (HSR 15.6)
36.24
-
-
... More
Cement Pointing 1:2 flush on flat brick flooring (HSR 15.71)
113.32
-
-
... More
Providing and Applying priming coat with cement primer in all shades on newly plastered or concrete exterior surface. (Note:- First quality paint of reputed make firm such as Goodlass-Nerolac, Berger, Garware, Jenson, Nicholson, Asian & Shalimar Shall be used as approved by Engineer-in-charge in writing, Drum of paint shall be opened in presence of Engineer-in-charge). (HSR 16.25).
185.95
-
-
... More
Painting two coats with plastic emulsion paint on walls on new work to give an even shade (HSR 16.30)
185.95
-
-
... More
Providing and applying two coats white cement based putty over plastered surface and grindling the surface smooth with sand paper to get an even and smooth finish including cost and carriage of all material, labour charges, scaffolding, sundries etc. complete. (Note:- reputed make Putty such as J.K./ Birla shall be used as approved by Engineer-in-charge). (HSR 16.81).
185.95
-
-
... More
Providing and fixing aluminium gauge work for doors, window with glass panes, aluminium jali + Board in fixed position (NS)
375.09
-
-
... More
Providing and fixing aluminium gauge work for doors & window vertical with glass panes aluminium sheets door closer, door fitting etc. (NS)
83.16
-
-
... More
Providing and fixing in position best indian make viterous chinaware sinks with complete fittings as fully described in Item No.30.51 above 600mm x 450mm x 200mm (HSR 30.51+30.52(a)
3
-
-
... More
Providing and fixing GI/ PVC and special (NS)
71.43
-
-
... More
Providing and fixing in position 15mm i/d C.P. brass bib cocks of best quality (as required by the Engineer-in-charge). [HSR 30.75].
(a) Bib cock long body.
3
-
-
... More
Providing and fixing in position CP brass stop cocks (as approved by the Engineer-in-Charge) 15mm stop cock (HSR 30.76(a)
3
-
-
... More
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :-Note: All quantities of the below materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Bricks 4944 Nos @ 4.00/- Each
4944
-
-
... More
Doors 12 Nos. @ 800/- Each
12
-
-
... More
Windows 7 Nos. @ 500/- Each
7
-
-
... More
Clear Storey window Ventilator 15 Nos. @ 500/-
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements