Government Of Haryana Tender

... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Government Of Haryana Tender

Works
Civil Works Roads
Eprocure
Opening Date15 Jun 2020
Closing Date6 Jul 2020
Tender Amount₹ 8,00,927 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 17,160
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:1-1/2:3 with stone aggregate 20mm Nominal size for reinforced concrete work in footing, strips, foundations, beams, rafts, pedestals and approach slabs of bridges etc. excluding steel reinforcement but including centring and shuttering ,laid in position ,complete in all respects (For work upto 1.5 metres below ground level).(HSR 10.90+10.95,a)

1.77

-

-

... More
First class brick work laid in cement sand mortar1:4 in foundation and plinth. (HSR.11.4)

5.17

-

-

... More
First class brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level(HSR.11.9)

4.36

-

-

... More
12 mm thick cement plaster 1:4 on walls (HSR 15.5)

30.78

-

-

... More
15 mm thick cement plaster 1:4 on the rough side of single or half brick wall (HSR 15.10)

30.78

-

-

... More
Applying pink primer or aluminium priming coat on wood work including preparation of surface, knotting and stopping etc. (HSR 16.2) 1st quality

624.29

-

-

... More
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. (HSR 16.3) 1st quality

625.38

-

-

... More
Applying priming coat with metal primer on new steel or iron work including preparation of surface. (HSR 16.9) 1st quality

1.09

-

-

... More
Applying priming coat with cement primer in all shades on newly plastered or concrete exterior surfaces. (HSR 16.25) 1st quality

61.56

-

-

... More
Providing two coats of exterior acrylic emulsion paint. ( HSR 16.79)

-

-

-

... More
(b) 1st quality

61.56

-

-

... More
Providing and applying two coats white cement based putty over plastered surface and grinding the surface smooth with sand paper to get an even and smooth finish including cost and carriage of all material labour charges scaffolding sundries etc. complete (J.K/Birla make)(HSR 16.81)

61.56

-

-

... More
Wrought iron and mild steel (using angles, flats, square bars, tee and channels) ladders, grills, gratting frames, window guards, iron doors openable or fixed staircase or parapet or any other type of railing, gates and tree guard etc., including cost of screws and welding rods or bolts and nuts complete fixed in position. (HSR 18.12)

28.16

-

-

... More
Steel reinforcement TMT bars FE-500 EQR / FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basements etc. (HSR 18.22). Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS:1732.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.

4.12

-

-

... More
N.S ITEMS CIVIL WORK

-

-

-

... More
Providing and fixing of round barbed wire fencing and five nos. straight wire i/c providing and fixing 35x35x5mm MS angles @ 9 feet centre to centre complete in all respect.(N.S)

12.19

-

-

... More
Providing & fixing 8mm thick ultra deziner cement bonded particle ply termite proof, fire resistant, moisture resistant (ISI 4276-1995) and (62%, cement, 28% wood, 10% chemicals) including all accessories and labour complete in all respect.(N.S)

2000

-

-

... More
Providing & fixing 12mm thick ultra cement bonded particle ply termite proof, fire resistant, moisture resistant (ISI 4276-1995) and (62%, cement, 28% wood, 10% chemicals) including all accessories and labour complete in all respect.(N.S)

2960

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.