Government Of Haryana Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 1,76,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HRY_79281_1Bid Award Id
ViewTender No
004Tender Authority
Government Of Haryana ViewPurchaser Address
-Website
http://https://haryana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Pre-cast cement concrete 1:2:4 with stone aggregate 20 mm nominal size in Kerbs and the like items, finished smooth with 6 mm thick cement plaster 1:3 on exposed surface including from work, placing and fixing in position, complete at the ground level or in first storey. (HSR 10.77)
50.83
-
-
... More
Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work for walls exceeding 20 cm thickness (Straight and curved) beams, girders, stairs, columns, (square or rectangular) battens and lintels etc. excluding steel reinforcement but including centering and shuttering, laid in position complete in all respects. [HSR. 10.86 + 10.95 (a)
20.85
-
-
... More
Cement concrete 1:1½:3 with stone aggregate 20mm nominal size for reinforced concrete work in footing, strips, foundation, rafts, pedestal and approach slabs of bridges etc. but excluding steel reinforcement and including centering and shuttering, laid in position, complete in all respects. (for work upto 1.5 Mtrs. below ground level). [HSR. 10.90 + 10.95 (a)].
44.1
-
-
... More
Providing & laying 80mm thick ISI marked interlocking paver blocks (conforming to IS 15658 2006)/ IRC SP 63-2004 of all shapes and colours in design mix cement M-40 over a bed on 30mm thick fine sand complete in all respect. (HSR 10.159)
3507.43
-
-
... More
First Class brick work laid in cement sand mortar 1:6 in foundation and plinth. (HSR 11.2)
46.69
-
-
... More
First class brick work laid in cement sand mortar 1:6 in first storey upto 4 meters above plinth level (HSR 11.7)
48.27
-
-
... More
Conglomerate floor 50mm thick cement concrete topping 1:2:4 (HSR 14.10)
27.45
-
-
... More
12mm thick cement plaster 1:6 plastering on wall (HSR 15.7)
237.66
-
-
... More
15 mm thick cement plaster 1:6 on the rough side of single or half brick wall (HSR 15.12)
240.8
-
-
... More
Providing two coat of exterior acrylic emulsion paint(HSR 16.79b)
478.46
-
-
... More
Providing and applying two coats white cement based putty over plastered surface and grinding the surface smooth with sand paper to get an even and smooth finish including cost and carriage of all material labour charges, scaffolding, sundries etc complete (J.K./ Birla make.(HSR 16.81)
478.46
-
-
... More
Wrought iron and mild steel (using angles, flats, square bars, tees and channels) ladders, grills, gratting frames, window guards, iron doors openable or fixed stair case or parapet or any other type of railing, gates and tree guards etc., including cost of screws and welding rods or bolts and nuts complete fixed in position.(HSR 18.12)
3.36
-
-
... More
Fe -500 EQR TMT steel bars for RCC works where not included in the complete rate of RCC including bending, binding and placing in position complete. (HSR 18.22)
22.93
-
-
... More
Earth work (Tibba sand) in the campus involving excavation of earth in all type of soil or rocks where earth is brought from out side from 10 Km and above lead & lift to the site of work including laying in 25cm layers for compaction including cost of watering and rolling and compensation of earth taken from private land, dressing of banks and side slopes to given site levels and templates after breaking of clods. The complete rate quoted by the contractor shall take in to account all allowances for labour, hardness, witness and all kinds of carriage, loading, unloading, total lead and lift of soil involved to the entire satisfaction of Engineer-in-Charge confirming fully to Haryana PWD specification 1990 1st addition including subsequent agenda and corrigenda issued from time to time till the date of final payment (N.S.)
801.35
-
-
... More
Supply and fitting of 4 mm DND fibre glass UV Sabilized material sheet for parking shed (NS)
7020
-
-
... More
Providing and fixing 1.5"x1.5" AMD 4"x4" M.S. pipe frame (NS)
14500
-
-
... More
Provision for Machine Bending Charges (NS)
4000
-
-
... More
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under:- Steel scrap @ Rs. 2000/- per Qtl.
2.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements