Public Works Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date13 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 4,54,959 
Notes
Download

Costs

  • EMD

    ₹ 9,100
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 1,180

Summary

Shifting The 11kv Lines, Lt Lines And T/fs Due To Construction Of Widening And Strengthening Of Road From Urnaicha To Nankpura (road Id 7824) In Distt. Kurukshetra (cm Announcement No. 26029 Dated 06.04.2022 Under S/u Sub-division Pehowa) (recall)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SITC of T/F Plateform Set with J-Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

2

-

-

... More
SITC of Stay set 6` /8` long with Elow and Nuts complete required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

9

-

-

... More
SITC of X-Plate for Stay required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

9

-

-

... More
SITC of Stay wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

90

-

-

... More
SITC of GSL No. 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

202

-

-

... More
SITC of 11KV pin insulator with pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

30

-

-

... More
SITC of 11KV Disc insulator with fittings required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

12

-

-

... More
SITC of V-Shape X- Arm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

9

-

-

... More
SITC of Top Hamper required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

9

-

-

... More
SITC of Earthing Rod 8` Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

4

-

-

... More
SITC of MS Channel 75 x 40mm / 100 x 50mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

135

-

-

... More
SITC of MS Angle 65x65x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

200

-

-

... More
SITC of MS Flat 50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

190

-

-

... More
SITC of MS Nut and Bolts All Size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

80

-

-

... More
SITC of LT 4 Core Cable 50mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

20

-

-

... More
SITC of 11KV GO Switch Comp. 9 /11 Mtr. Pole required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

2

-

-

... More
SITC of 11KV Lighting Arrester required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

2

-

-

... More
SITC of 11KV Disc insulator for Stay required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

9

-

-

... More
SITC of LT Fuse Unit Board required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

2

-

-

... More
SITC of Aluminium Thimble 185 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

50

-

-

... More
SITC of LT AB 50 plus 35 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

150

-

-

... More
SITC of 2 Core PVC Un Armoured 10mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

100

-

-

... More
SITC of 2 Core PVC Armoured 10mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

50

-

-

... More
SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

13

-

-

... More
SITC of D - Strip required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

13

-

-

... More
SITC of Number Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

19

-

-

... More
SITC of Phase Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

3

-

-

... More
SITC of Danger Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. `

19

-

-

... More
Erection and Dismantle of 100/200KVA T/F with PM Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

2

-

-

... More
Erection of ACSR 50mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

630

-

-

... More
Erection and Dismantle of 2 Core PVC Armourd upto 25 mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

10

-

-

... More
Erection and Dismantle of LT AB Cable 35 plus 70 mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

150

-

-

... More
Erection and Dismantle of 4 Core Cable upto 20Mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

2

-

-

... More
Dismantle of ACSR 30 / 50 mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

600

-

-

... More
Fabrication charges of Steet items including Painting and Transportation upto site of work complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `

525

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.