Public Health Engineering Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date13 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 2,08,71,530 
Notes
Download

Costs

  • EMD

    ₹ 4,17,431
  • Document Cost

    ₹ 15,000
  • Tender Fee

    ₹ 1,180

Summary

Construction Of Pump House At Jln Raw Water Pumping Machinery Dg Set Independent Feeder Di Pipe Raw Water Rising Main Line

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NS Item:- Supplying, erection, testing and commissioning of Horizontal split casing pumping set for Raw water having head 40.0 mtrs as per the indicated requirements of discharge in LPM and power capacity in BHP Make:- KSB,Kirloskar,Crompton Greeve,lubi) 5600LPM x40m Head 85.0BHP

2

-

-

... More
NS Item - PANEL BOARDS FOR MOTOR:- Supply Erection,Testing and Commissioning of wall mounted electrical LT Panel board , fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping) START DELTA STARTER :- 1.Main MCCB(ABB/LandT/SCHNEIDER - 01nos 2. Controlling MCB - 01nos 3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos 4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos 5.START/STOP PUSH BUTTON(SCHNEIDER/SALZAR/SEIMENS) 6.EMERGENCY SWITCH(SCHNEIDER/SALZAR/SEIMENS) - 01 nos 7.DIGITAL VAF METER(SECURE/SELEC/TECHNO/ABB) - 01 nos 8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos 9. CAPACITOR BANK AS PER LOAD REQUIREMENT 10. CHANGE OVER SWITCH AS PER LOAD(SCHNEIDER/SALZAR/SEIMENS) - 01 nos 11.SELECTOR SWITCH(SECURE/SELEC/TECHNO/ABB) - 01 nos 12. SINGLE PHASE PREVENTER(SECURE/SELEC/TECHNO/ABB) -01 nos 13.ELCB BREAKER(ABB/LandT/SCHNEIDER) 1300LPM x35m Head

2

-

-

... More
PANEL BOARDS FOR MOTOR:- Supply Erection,Testing and Commissioning of wall mounted electrical LT Panel board , fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping) START DELTA STARTER :- 1.Main MCCB(ABB/LandT/SCHNEIDER - 01nos 2. Controlling MCB - 01nos 3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos 4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos 5.START/STOP PUSH BUTTON(SCHNEIDER/SALZAR/SEIMENS) 6.EMERGENCY SWITCH(SCHNEIDER/SALZAR/SEIMENS) - 01 nos 7.DIGITAL VAF METER(SECURE/SELEC/TECHNO/ABB) - 01 nos 8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos 9. CAPACITOR BANK AS PER LOAD REQUIREMENT 10. CHANGE OVER SWITCH AS PER LOAD(SCHNEIDER/SALZAR/SEIMENS) - 01 nos 11.SELECTOR SWITCH(SECURE/SELEC/TECHNO/ABB) - 01 nos 12. SINGLE PHASE PREVENTER(SECURE/SELEC/TECHNO/ABB) -01 nos 13.ELCB BREAKER(ABB/LandT/SCHNEIDER) 1400LPM x35m Head

2

-

-

... More
Supplying, erection, testing and commissioning of Horizontal split casing pumping set for Raw water having head 40.0 mtrs as per the indicated requirements of discharge in LPM and power capacity in BHP Make:- KSB,Kirloskar,Crompton Greeve,lubi) 1300LPM x35m Head with 20.00BHP

2

-

-

... More
Supplying, erection, testing and commissioning of Horizontal split casing pumping set for Raw water having head 40.0 mtrs as per the indicated requirements of discharge in LPM and power capacity in BHP Make:- KSB,Kirloskar,Crompton Greeve,lubi) 1400LPM x35m Head 30BHP

2

-

-

... More
LT COPPER CABLE FOR LT PANEL TO PUMP 0- 50sqmm * 1C * 6 Run, 1100 V Grade Multi Strand flexible annealed copper conductor, PVC Insulated and sheathed Multi - core flexible cables. Plain annealed high conductivity flexible copper conductor as per Class 5 of IS 8130/2013, latest, PVC TYPE D as per IS 5831/1984, Latest, Extruded PVC Type ST3 as per IS 5831/1984, Latest, IS 8130/2013, IS 5831/1984, IS 694/2010, etc. with latest up to date updates, As per IEC 60332-1-2. 10 Sqmm2 Single Core

120

-

-

... More
Operation and Maintenance for complete scope of work mentioned in the DNIT as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/mtc estimate complete in all respect as per approved NIT (i) Operation and Maintenance during defect liability period (Operation only) after 3 month trial run.

1

-

-

... More
(ii)Operation and Maintenance during 1st year after defect liability period.

1

-

-

... More
(iii)Operation and Maintenance during 2nd year.

1

-

-

... More
(iv)Operation and Maintenance during 3rd year.

1

-

-

... More
(v)Operation and Maintenance during 4th year.

1

-

-

... More
(vi)Operation and Maintenance during 5th year.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.