Public Health Engineering Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date1 Jul 2024
Closing Date8 Jul 2024
Tender Amount₹ 4,12,77,017 
Notes
Download

Costs

  • EMD

    ₹ 8,25,540
  • Document Cost

    ₹ 15,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
`CLEAR WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set forClear water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 1000 LPM x 60.00 M x 25 BHP

2

-

-

... More
NS Item -Panel Boards for Motors Supply, erection, testing and commissioning of wall mounted electrical L.T panel Board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200x900mm having following items complete in all respect as per approved NIT. For raw water pump sets for 1600 LPM x 15 Mtr. Head = 2 No. a) Main switch 100 Amp 1 No. (LandT, Siemens, ABB) b) Volt Mtr. 100x100mm range 0 to 500 volt 1 No. (AE/KAPPA?LandT) c) Amp.mtr. 100x100mm range 0 to 100 Amp. 1 No. (AE/KAPPA/LandT) d) CT 100/1 No. (AE/KAPPA/LandT) e) VSS 1 No. and ASS 1 No. each of approved make f) SPP 1 No. approved make g) Motor starter , star delta 1 No. for 1600 LPM x 15 Mtr. head motor (LandT, Siemens, ABB) h) Capacity of suitable capacity i) Indicating Lamp- j) Change over switch Amp

2

-

-

... More
NS Item -Panel Boards for Motors Supply, erection, testing and commissioning of wall mounted electrical L.T panel Board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200x900mm having following items complete in all respect as per approved NIT. For clear water pump sets for 1000 LPM x 60 Mtr. Head = 2 No. a) Main switch 100 Amp 1 No. (LandT, Siemens, ABB) b) Volt Mtr. 100x100mm range 0 to 500 volt 1 No. (AE/KAPPA?LandT) c) Amp.mtr. 100x100mm range 0 to 100 Amp. 1 No. (AE/KAPPA/LandT) d) CT 100/1 No. (AE/KAPPA/LandT) e) VSS 1 No. and ASS 1 No. each of approved make f) SPP 1 No. approved make g) Motor starter , star delta 1 No. for 1000 LPM x 60 Mtr. head motor (LandT, Siemens, ABB) h) Capacity of suitable capacity i) Indicating Lamp- j) Change over switch Amp

2

-

-

... More
COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make: Indian Cables Ltd./ Finolex / Havells / Polycab / RR Cables / CAPP / Gloster / Universal / Fort Gloster Industries Ltd./ Asian Cables Corporation Ltd. 16mm2 3core

60

-

-

... More
Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 0.50 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG)

1

-

-

... More
Operation and Maintenance for complete scope of work mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/Mtc. estimate complete in all respect as per approved NIT. (i) Operation and Maintenance during defect liability period (Operation only) after 3 month trial run period.

1

-

-

... More
(ii) Operation and Maintenance during 1st year after defect liability period.

1

-

-

... More
(iii) Operation and Maintenance during 2nd year.

1

-

-

... More
(iv) Operation and Maintenance during 3rd year.

1

-

-

... More
(v) Operation and Maintenance during 4th year.

1

-

-

... More
(vi) Operation and Maintenance during 5th year.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.