Public Health Engineering Department Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 45,55,119Document Cost
₹ 20,000Tender Fee
₹ 1,180
Summary
Dnit Providing Sewerage Facilites And Sewage Treatment Plant At Village Ghasera Block, Tehsil Nuh District Nuh (mewat) Phed Division No. 2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRY_374575_1Bid Award Id
ViewTender No
202449E4A6CA 8B53 47C9 B3E7 5A01A83A2C93559PUHTender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of HT/LT Panel room, PLC Room, Centrifuge House, blower room and Lab cum office building including doors, windows and fitting with toilet block including all sanitary fitting etc. at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100 mmx 45 mm of 10 gauge for chokhat, 75 mm x 45 mm of 10 gauge for door frame, 45 mmx 45 mm of 10 gauge for window frame with 5 mm thick glass. Covered Area (250 sqm) ,,
250
-
-
Extra Provision for Minor Crossing for Laying of 600 mm Sewer By Trenchless Technology all work....
30
-
-
SEWAGE TREATMENT PLANT Design construction, erection, testing and commissioning of STP 4.00MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping and all other contingent Electrical, Mechanical Electromagnetic Flow Measurement Device on inlet and outlet. Real Time Water Quality Monitoring with Data Collection System (Online analyzer), Piping and instrumentation works. With PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipment’s as per detail given in the bid document and including following components. 1.Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4ft. wide wicket gate (total weight not less than 500 kg at STP site. As per satisfaction of Engineer-in-Charge. 2.Landscaping,MCC Panel room and all other contingent ,Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet. Real Time Water Quality Monitoring with Data Collection System (Online analyzer), Piping and instrumentation works. With PLC and SCADA Arrangement along with Synchronizing it with each other, Furniture and laboratory equipment’s as per detail. 3.Providing and installing 2 No. Centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect. 4.Packing dry sludge in 20Kg Bag and supplying the same in Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT, 5.On line outlet effluent water quality monitoring system for BOD, COD, TSS, PH etc, Supply, erection, testing of effluent quality monitoring system at 4.0 MLD STP for online (Continuous) measurement of PH, Total Suspended Solids (TSS). Chemical Oxygen Demand (COD). Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV- VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB and PHED TUV approved complete in all respect as per Central Pollution Control Board (CPCB) Guidelines for online continuous monitoring system for effluent and as contained in scope of work.Multi-parameter measuring converter, for connecting upto 18 intelligent sensors Scope including 8 analog inputs /Outputs (inputs and 4 outputs) (0/4-20 Ma). wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet effluent of plant of 4.00 MLD STP with integrated with automatic cleaning Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) Cable length 100 Meter (minimum)Sensor adapter cable for all intelligent sensors, with IP68 water price connection to intelligent sensors net system cable length 100 Meter (minimum)Data Transfer to CPCB, HSPCB and PHED Servers. 6.Providing GSM 5G, 4G Modem with mobile network connectivity including network charges complete in all respect . `..
1
-
-
MAIN PUMPING STATIONS Design, construction erection, testing commissioning of MPS and following components including RCC Inlet, chamber screen chamber, collecting rectangular tank suitable for 4.00 MLD average flow with peak factor of 3.00
landscaping of the campus providing and installing of 5 no. Pumping Set of i.e. 1 no. 8500 LPM, 2 no. 2800 LPM and 2 no. 1400 LPM
each having 15 mtr head, suitable size LT panel equipped with all safety devices, suitable automatic capacitor bank and submersible
cable form LT panel to pump sets complete in all respect. K9 DI pipe of suitable dia at MPS Including welding and screwing of flanges,
ISI marked D.L. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect 3
Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting
tank)as per design Supply and installation of 2 Nos, mechanical course screens of suitable size for 4.00 MLD average flow with peak
factor of 3.0. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to
newly constructed structures is included in the scope of work. All the infrastructure except construction of staff quarter, and path
ways/roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sum job. All the
pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels
at MPS and STP site through broadband internet facility The size and quantities of all the above components will be as per approved
structural /Hydraulic /Mechanical/Electrical
1
-
-
Providing and fixing Clamps and M.S stays including bolts and nuts for 100mm pipe
520
-
-
Operation and Maintenance of Sewerage works for complete scope of work mentioned in the DNIT and of whole existing Sewerage scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period (operation only)
1
-
-
1st year Operation and maintenance after
defect liability period
1
-
-
2nd year Operation and maintenance
1
-
-
3rd year Operation and maintenance
1
-
-
4th year Operation and maintenance
1
-
-
5th year Operation and maintenance
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements