Public Health Engineering Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date8 Jun 2024
Closing Date28 Jun 2024
Tender Amount₹ 14,64,15,971 
Notes
Download

Costs

  • EMD

    ₹ 29,28,319
  • Document Cost

    ₹ 20,000
  • Tender Fee

    ₹ 1,180

Summary

Dnit Of Providing Sewerage Facilities And Sewerage Treatment Plant At Village Malab, Distt. Nuh

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
`Construction of HT/LT Panel room, PLC Room, Centrifuge House, blower room and Lab cum office building including doors, windows and fitting with toilet block including all sanitary fitting etc. at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100 mmx 45 mm of 10 gauge for chokhat, 75 mm x 45 mm of 10 gauge for door frame, 45 mmx 45 mm of 10 gauge for window frame with 5 mm thick glass. Covered Area (400 sqm)

250

-

-

... More
Providing and installing for HD Camera High quality image with 12 MP, 1/2.7`CMOS sensor 12 MP (2880*1620)@25fps: 4MP (2560*1440)@25fps: 3MP (2304*1296) @25fps: 2MP (1920*1080) @30/25fps: Ultra 265, H.265, H.264, MJPEG LightHunter technology ensures ultra-high image quality in low illumination environment 120 dB true WDR technology enables clear image in strong light scene Support 9:16 Corridor Mode Built-in Mic Smart IR, up to 40m (131ft) IR distance Supports 256 G Micro SD card P67

6

-

-

... More
MS Grating Cover of 450 x 450 mm size

595

-

-

... More
Supplying of LT Armoured Cable of size 50 sqm 3.5 core 1100 volt complete with making necessary connection of cable on both ends including loading unloading and carriage with all labour and petty material required to complete the job upto the entire satisfaction of Engineer-in-charge of the work.(From meter to LT Pannel Double Circeeit) Hevells

50

-

-

... More
SEWAGE TREATMENT PLANT :-Design, construction, erection, testing and commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device, Real Time Water Quality Monitoring with Data Collection System(Online analyzer), Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including following components i) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 mtr high including all accessories along the road and path complete in all respect. ii) Supply and installation of 1 No. Main Gate of (SS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg) at STP site. as per satisfaction of Engineer-in-charge. iii) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect of the NIT, including packing dry sludge in 20Kg Bag and supplying the same Market KisanSewa Kendra or as directed by Engineer-in-charge within lead as pointed at clause 4.4.5 of NIT . iv) Providing and installation of 2 nos. pumping sets of suitable size (1 working and 1 standby) with head 15 mtrs. in chlorination tank to disposed off the treated effluent including all fittings, instrumentations, electric panel board etc. as per design complete in all respect. v) Supply, Installation, Testing, Commissioning, operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 3.00 MLD STP at Village for Online (Continuous) measuring of PH, total Suspended Solids (TSS) Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cable, local data acquisition and display the data of continuous basis for up linking the data of CPCB, HSPCB and PHED, TUV Board approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender:Multi-parameter measuring converter, for connecting up to 18 intelligent seniors Scope including 8 analog inputs/Outputs(4 Inputs and 4 outputs) (o/4-20Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement plant of 3.00 MLDSTP at with integrated with automatic cleaning.Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum).Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (Minimum) Data Transfer to CPCB, HSPCB and PHED Servers . Providing GSM 3G, 4G Modem with mobilenetwork connectivity

1

-

-

... More
Design, construction, erection, testing and commissioning of MPS and following components. i) Panel room of 30 sqm. covered area and PLC room including toilet block of 20 Sqmtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, Powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin / Modi Float, The toilet block shall be with one half staff urinal and One European W/C, one wash hand basin as per approved drawings. ii) RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 3.00 MLD average flow with peak factor of 3.00, land scaping of the campus complete in all respect. Providing and installing 1 No motor of 3DWF,2 Nos of 1DWF and 2 Nos 0.50 DWF with 15 Mtr Head i.e 1 no of 6300 LPM, 2 no of 2100 LPM,2 no of 1050 LPM each with suitable LT Panel equipped with all safety devices, automative capacitor bank and submersible cable from LT panel to pump set complete in all respect. iii) K9 DI pipe of suitable Dia at MPS Including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect. iv)3 nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. v)Supply and installation of 2 nos. mechanical course screens of minimum length 6 mtrs. for 3.00 MLD average flow with peak factor of 3.0. 1. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in scope of work. 2. All the infrastructure except construction of Staff quarter ,Boundary wall (except Main Gate) and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. 3. All the pumping machinery, panel board, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. 4. The size and quantities of all the above components will be as per approved structural /Hydraulic /Mechanical /Electric design to be approved by Department before actual execution of work.

1

-

-

... More
Provision and fixing of Zero Velocity vale IVC/VAG/Kirloskar make of PN 1.6 rating, including, carriage, loading and unloading and fixing, complete in sll respect for the satisfaction of the Engineer in Charge 400 MM i/d

3

-

-

... More
Operation and Maintenance of Sewerage works for complete scope of work mentioned in the DNIT and of whole existing Sewerage scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period (operation only)

1

-

-

... More
1st year Operation and maintenance after defect liability period

1

-

-

... More
2nd year Operation and maintenance

1

-

-

... More
3rd year Operation and maintenance

1

-

-

... More
4th year Operation and maintenance

1

-

-

... More
5th year Operation and maintenance

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.