Public Health Engineering Department Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 38,75,903Document Cost
₹ 20,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_HRY_226821_1Bid Award Id
ViewTender No
W/s Sew Bora 1937 EE Sohna 6093-6343 2nd 22 juneTender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, erection and commissioning Electric operated 3 HP vacuum pumping set of Kirloskar make cap. 0.4 m3 per hour @ 300 mm WG complete for priming with wiring 32 A FSU & DOL starters switches etc. also the GI piping (B class) valves & sight glass etc complete including all additional civil work like digging trenches making khudas in wall and repair ther of still supporting suction and delivery line and thrust block at T/Junctions. 1 For each BS
4
-
-
... More
Supply Erection, testing & commissioning of equipment on HT metering panel 11KV consisting of one No. Electronic Tri vector Meter 3 Phase, 4 wire 0.5 class of accuracy on KW hour point basis complete with HT CTs of 20/5 Amp. 15 VA, burden and class of 0.5 accuracy & HT PT 11000/ 110 V, 15 VA, burden & class of 0.5 accuracy including metering cubical complete in all respect as described in Sch. No. II.
4
-
-
... More
Automatic Power Factor correction factor panel 45 KVAR (as per schedule No. II) With automatic power factor correction device in various steps with incoming 200 Amp MCCB with complete metering.
a) 3 x 4 x 5 KVAR
4
-
-
... More
Boaring/excavation including making receiving pit to the precise dimensions and making surface clean for launch of the fibre optic underground horizontal Drilling machine in any soil condition including rock/boulders/ any underground utility like foundation water supply line coming in alignment ot other underground obstruction under roads suitable for DI pipe through it of following sizes including caution & sign board complete in all respects. For 300 mm i/d
30
-
-
... More
Boaring/excavation including making receiving pit to the precise dimensions and making surface clean for launch of the fibre optic underground horizontal Drilling machine in any soil condition including rock/boulders/ any underground utility like foundation water supply line coming in alignment ot other underground obstruction under roads suitable for DI pipe through it of following sizes including caution & sign board complete in all respects. For 350 mm i/d
30
-
-
... More
Providing and erection of RCC ventilating column minimum 200 mm i/d and height of 12.5 m according to drawing and specification, concrete pipe to be used for construction of vent shaft shall be 1:1.5:3 with bottom inner dia 400mm & outer dia 600 mm and top inner dia 200 mm & outer dia 300 mm including fixing of MS Cowl as per relivent IS Specification.
2
-
-
... More
Boaring/ Excavation including making thrust pit and receiving pit to the precise dimensions for the launch of the specialized Auger boaring machine in the normal soil condition but not in rock/ Boulders/ any underground utility like, foundation water supply line coming in aligment or other under ground obstruction undder Bilaspur- Pataudi Road with trenchless technology suitable for inserting MS casing pipe of following sizes including caution & sign board complete in all respect as per approved DNIT For 1036 mm o/d MS pipe 18 mm thick casing pipe
20
-
-
... More
Providing & inserting of MS casing pipe (Fe - 330 grade) fabricated as per IS 3589 of 1991 from steel plates conforming to IS - 2062 of following size including cutting, beveling grinding and radio graphically welding of pipes as per IS - 1182 complete in all respects including cartage to site of work and testing complete including cleaning of surface of MS pipe (Casing pipe) inner and outer surface by stand blasting at site to make the surface ready for PU coating/ high built epoxy paint/polythene tape system complete & coating of outer surface of casing pipe with PU coating to dry film thickness 1500 micron for protection against corrosion complete & coating of inner surface of casing pipe with high built epoxy paint to RD SO specification No. M & C/ PCN/111/88 to a dry film thickness of 250 micron complete in all respects as per approved DNIT For 1036 mm o/d MS pipe 18 mm thick casing pipe
20
-
-
... More
Operation and Maintenance for the complete scope of work mention in the DNIT(Disinfection material supplied by the PHED) as per schedule for a period of 5 year after 12 months during Defect Libility Period after 3 Months Trial run (will be charged to the A/mtc.estimate.
(Water Supply and Sewerage Network)
Operation and Maintenance During the defect libility period
1
-
-
... More
i) Operation & meintenance during 1st year after defect libility period.
1
-
-
... More
ii) Operation & meintenance 2nd year
1
-
-
... More
iii) Operation & meintenance 3rd year
1
-
-
... More
iv) Operation & meintenance 4rth year
1
-
-
... More
v) Operation & meintenance 5th year
1
-
-
... More
MAIN PUMPING STATIONS
Design, construction, erection, testing & commissioning of MPS and following components including O&M for 5 years after 1 year defect liability period after 3 months trial run period.
Panel room of 30 sqm. covered area and PLC room including toilet block of 20 Sq mtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, Powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, The toilet block shell be with one half staff urinal & One European W/C, one wash hand basin as per approved drawings.
RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 4 MLD average flow with peak factor of 3.00 land scaping of the campus complete in all respect.
K9 DI pipe of suitable dia at MPS Including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect.
3 nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design.
Supply installation of 2 nos. mechanical course screens of minimum length 6 mtrs. for 4 MLD average flow with peak factor of 3.0
1. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in scope of work. 2. All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job.
3. All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC & SCADA and shall be synchronized with PLC panels at MPS & STP site through broadband internet facility.
4. The size and quantities of all the above components will be as per approved structural /Hydraulic /Mechanical /Electric design to be approved by Department before actual execution of work including O&M of 5 Years after 12 months defect liability period after 3 months trail run period.
1
-
-
... More
SEWAGE TREATMENT PLANT
Design, construction, erection, testing & commissioning of 4 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room & all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device, Real Time Water Quality Monitoring with Data Collection System(Online analyzer), Piping & Instrumentation works. With PLC & SCADA Arrangement for STP & MPS along with Synchronizing it with each other including furniture & laboratory equipments as per detail given in the bid document and including following components including O&M of 5 Years after 12 months defect liability period after 3 months trail run period.
2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 mtr high including all accessories along the road and path complete in all respect.
Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg) at STP site. as per satisfaction of Engineer-in-charge
Providing and installing 2 No. centrifuges (1Working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect of the NIT, including packing dry sludge in 20Kg Bag and supplying the same Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clauge 4.4.5 of NIT including operation and maintenance of 5 Years after 12 months defect liability period after 3 months trail run period.
Providing and installation of 2 nos. pumping sets of suitable size (1 working and 1 standby) with head 15 mtrs. in chlorination tank to disposed off the treated effluent including all fittings, instrumentations, electric panel board etc. as per design complete in all respect including operation and maintenance of 5 Years after 12 months defect liability period after 3 months trail run period. Supply, Installation, Testing, Commissioning, operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 4 MLD STP at Village Bhora Kalan for Online (Continuous) measuring of PH, total Suspended Solids (TSS) Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cable, local data acquisition and display the data of continuous basis for up linking the data of CPCB, HSPCB & PHED, TUV Board approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender:
Multi-parameter measuring converter, for connecting up to 18 intelligent seniors Scope including 8 analog inputs/Outputs(4 Inputs & 4 outputs) (o/4-20Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement plant of 4 MLD STP at Village Bhora Kalan with integrated with automatic cleaning.
Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier & temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum).
Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (Minimum)
Data Transfer to CPCB, HSPCB & PHED Servers during 1 year of O&M after commissioning after 3 months trail period (after 1 year of defect liability period)
Providing GSM 3G, 4G Modem with mobile network connectivity including network charges for 5 year of O&M after commissioning after 3 Months trail run (after 1 year defect liability period)
1
-
-
... More
CCTV CAMERAS
Providing and Installing 6 CCTV Cameras 4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer-in-Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site.
Cameras:
i) At STP & MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12mm lens size, 1 Nos. 3.6mm lens size.
Make: - CP Plus Internet Protocol minimum 5MP WDR, Night vision colour mode 2.4.2 12mm very focal with extra IR, CCTV Cameras should be installed and commissioned before starting execution of work including operation & Maintenance of 5 Years. after 12 months defect liability period after 3 months trail run period.
1
-
-
... More
Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS & STP site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area 400 sqm. O&M of 5 Years after 12 months defect liability period after 3 months trail run period.
400
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements