If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Haryana Police Housing Corporation - HPHC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 2,57,45,725 
Notes
Download

Costs

  • EMD

    ₹ 5,14,000
  • Document Cost

    ₹ 15,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]

5298.21

83

439751

... More
[17.8.1]Compaction 1. Extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling [Through Rate]

318.17

48

15272

... More
[17.8.2]Compaction 2. Extra for watering the earth/fly ash laid in 20 cm layers as per specifications [Through Rate]

318.17

27

8591

... More
[17.8.3]Compaction 3. Extra for rolling to specifications [Through Rate]

318.17

27

8591

... More
[23.22.1.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA [Through Rate]

1

4635

4635

... More
[23.22.4.9]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 4.9. Supply and erection of double door sheet steel enclosure distribution board suitable for MCBS and ELCBS etc. recessed in wall including bonding to earth with all labour and material required to complete the job in all respect up to the entire satisfaction of the Engineer-in-Charge of the work. Vertical TPN DB Double Door 4 way ( 8 incoming and 3phase*4 outgoing) [Through Rate]

1

6088

6088

... More
[23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate]

70

145

10150

... More
[23.27.3]Supply and erection of Godrej Almirah typeM.S. pedestal made of 50 mm x 50 mm x 6 mm angle iron frame with 3.00 mm thick M.S. sheet covering including shutters with suitable hinges and locking arrangement with Godrej type handle including round bars . The top covering should have downward overhang of 75 mm on all sides of pedestal , having two sets of water proof ventilation holes of suitable size on the sides , at top and bottom , each set containing four Nos. holes to discharge the heat produced by the current . The shutters fixed with rubber gasket of superior quality and of suitable size to make it water proof . The pedestal duly painted both inside and outside with two coats of approved paint and primary coat and its legs are embeded upto the entire depth in 1:2:4 cement concrete block , projected 75 mm all around the pedestal and and 200 mm above the ground level including the cost of all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-charge of the work:- 3. M.S. pedestal of size 750 mm wide , 1200 mm high ,300 mm deep and bottom totally open , duly embeded in cement concrete block of size 900 mm x 450 mm x 200 mm above ground level , having a base of size 1050 mm x 600 mm x 250 mm below ground level . 0 0 [Through Rate]

1

7768

7768

... More
[23.7.6.2]PVC CONDUIT PIPE ONLY (SURFACE OR RECESSED) FOR ELECTRICAL POINTS 6.2. Supply and erection of PVC CONDUIT ISI marked (Medium) recessed in wall/ceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work. PVC pipe of 25 mm dia. [Through Rate]

250

32

8000

... More
[24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate]

13

2721

35373

... More
[24.1.13]EARTHING AND LIGHTENING ARRESTOR 13. Providing and fixing 4.00 mm dia G1. Wire on surface or in recess for loop earthing as required. [Through Rate]

400

21

8400

... More
[24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate]

13

652

8476

... More
[24.1.8]EARTHING AND LIGHTENING ARRESTOR 8. Providing and fixing 25 mm x 3mm G.I. strip on surface or in recess for connections etc. as required with all labour and material. [Through Rate]

130

96

12480

... More
[24.4.5]STREET LIGHT 5. Supply and erection of Single Phase weather proof M.S. box of size 20 cm x 15 cm x 10 cm with hinged cover made of 2 mm thick MS sheet, locking arrangements, housed in wall/fixed on pole , including the cost of 1 no 4 way 16 A Bakelite connector, 1 no. 6 amp SP MCB and 1 Nos. 16 amp. neutral links fixed on Bakelite sheet in the M.S. box including painting and necessary connections. [Through Rate]

50

572

28600

... More
[24.4.8.5]STREET LIGHT 8.5. Supply and erection of Hot Dip Galvanized octagonal pole of 3mm thickness, with base plate including cost of nut and bolts , earthing studs, Integral Cable termination arrangement 5 mm thick Bakelite base plate on suitable welded MS/GI bracket 32 A four way connector 2 no 10 A SP MCB , end cover and all accessories as supplied by the manufacture including Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @80 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge 7 Metre Long pole with top dia 75 0mm and bottom dia 150 mm with base plate of size 300 x 300 x 20 mm [Through Rate]

6

15685

94110

... More
[24.5.2.3]MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia [Through Rate]

1540

124

190960

... More
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km]

318.17

83

26408

... More
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [Beyond 5km up to 10km per KM]

1590.86

6

9545

... More
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]

469.25

83

38948

... More
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]

811.34

585

474634

... More
[5.8.3]Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 3. From brick work in cement mortar [Through Rate]

175.24

1657

290373

... More
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]

23.75

3975

94406

... More
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]

598.62

2442

1461830

... More
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]

839.39

4374

3671492

... More
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]

274.69

5969

1639625

... More
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]

228.02

6113

1393886

... More
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]

1686.86

156

263150

... More
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]

4223.86

296

1250263

... More
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate]

3157.97

262

827388

... More
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, weldedjoints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect for all heights/depths/storeys/basements etc. Note-Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. [Through Rate]

115812.52

66

7643626

... More
[7.51]Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor IV level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for separately). [Through Rate]

1092.39

3613

3946805

... More
Analysis for Recovery of brick Bats

365.08

600

-219048

... More
Supply and erection of LED flood light 200 watt white colour, pressure diecast, working hour minimum 35000 hours, operation on single phase AC supply complete in all respect upto the entire satisfaction of Engineer- in -charge of the work including making necessary connections etc.

4

9443

37772

... More
Supply and erection of LT aluminium under ground cable ,loose in existing pipe or trenches complete with necessary connections. 35 Sqmm 4 Core Cable(armoured)

250

290

72500

... More
recovery of bricks from dismantled brickwork

175.24

3500

-613347

... More
S/E of 2.5 mm sqmm x 3 core PVC insulated multi core copper conductor cable (armoured) 1100 volts grade (round) in existing pole/ pipe, complete in all respect including making necessary connections.`

408

137

55896

... More
Supply and erection of under ground cable ,loose in existing pipe or trenches complete with necessary connections. (1) L.T Armoured cable 10 sqmm 4 core. (NEW NS)

1440

153

220320

... More
Supply and erection of 1.0 mtr 48mm dia G.I pipe bracket with SS Top ball for fixing on the existing HOT DIP Galvanised octagonal pole complete with all labour and material required to complete the job in all respect upto the entire satisfaction Engineer in charge of the work.(i) Single Arm

6

1417

8502

... More
S/E of 45W LED Street light luminaire with powder coated pressure die-cast aluminium housing,high efficiency LED, toughened glass with IP66 protection, , working hour minimum 50000 hours, operation on single phase AC supply complete in all respect upto the entire satisfaction of Engineer- in -charge of the work including making necessary connections etc.

12

3135

37620

... More
Supply and Erection of Coral LED Post Top Light 25 watt make havells model CORALPT25WLED757PSYMTOPC OR Equivalent in all respect. as per Brand list of HPHC.

50

6654

332700

... More
Supply and erection of 1.0 mtr 48mm dia G.I pipe bracket with SS Top ball for fixing on the existing HOT DIP Galvanised octagonal pole complete with all labour and material required to complete the job in all respect upto the entire setisfection Engineer in charge of the work. Double Arm

6

2317

13902

... More
Supply and erection of automatic three phase street light controller with time switch operation ON and OFF, setting upto 24 hours, complete with timelite 65 amp. 3 pole 230 V analog time switch contractor and MS power coated enclosure of suitable size. The work will be complete in all respect including making necessary connection, earthing nuts and bolts and other petty material to complete the job. (3 QT)

1

9675

9675



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.