North Western Railway Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 41,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Trd Modification Work In C/w Construction Of Rubs (9 Nos.) In Hisar-sadulpur, Rewari-sadulpur & Hisar-bathinda-suratgarh Sections Of Bikaner Division.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
24-TRD-BKN-ETender-24-25-BIKANER DIVISION-ELECTRICAL/NORTH WESTERN RLYTender No
24-TRD-BKN-ETender-24-25Tender Authority
North Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply of fabricated & galvanized steel work (SPS) other than masts with necessary components.
0.1
-
13927.85
... More
Erection of fabricated & galvanized steel work (SPS) other than masts with necessary components. 06
0.1
-
1083.95
... More
Supply of single cantilever assembly for conventional OHE (without insulator).
1
26358
26358
... More
Supply of Stay and bracket tube Porcelain type insulators (CD 1050mm) for single bracket assembly. 08
1
11941
11941.2
... More
Erection of single cantilever assembly complete with insulator for conventional OHE.
1
2672
2672.7
... More
Supply of material for single earth electrode with earth pit complete as per RDSO Drg. No. ETI/OHE/P/7020 or latest. Price also covers supply of 40 x 6 mm MS flat as well as all nut bolts necessary for earthing connection.
9
4233
38103.3
... More
Erection of single earth electrode with pit as per RDSO Drg. No. ETI/OHE/P/7020 or latest. The price include digging / excavation of earth, treatment of earth electrode by charcoal & 12 salt, bonding with supply, fabrication (shaping) and providing 40 x 6 mm MS flat for earthing connection with making holes and bolting (Galvanized fasteners / bolts) for earth connections between earthing station & structure / equipment and from earth pit to rail. The connecting MS flats are to be painted with two coat of red oxide and two coat of black bituminous paint. The price also includes erection of earth pit duly white wash & painting of earth value on the same. 13
9
1763
15875.1
... More
Supply of structure bonds. 14
39
870
33945.6
... More
Erection of structure bonds. 15
39
146
5721.3
... More
Supply of transverse (cross rail, inter track) & special bonds. 16
36
1223
44056.8
... More
Erection of transverse (cross rail, inter track) special bonds. 17
36
110
3992.4
... More
Supply of longitudinal bonds. 18
36
782
28184.4
... More
Erection of longitudinal bonds.
36
118
4251.6
... More
Supply & erection of various types of enamel caution boards (approx. area in range of 500-1000 sq.cm. per board).
90
302
27261
... More
Supply of enamel/retro reflective structure plate/boards for traction use (approx. area in range of 1000-1200 sq.cm. per board).
45
1078
48532.5
... More
Erection of enamel/retro reflective structure plate/boards for traction use (approx. area in range of 1000-1200 sq.cm.).
45
112
5076
... More
Supply of enamel/retro reflective danger/caution, unwired turnout, engine stop, sigma boards and other similar type of boards (approx. area in range of 1200-6000 sq.cm. per board).
44
2240
98568.8
... More
Erection of enamel/retro reflective danger/caution, unwired turnout, engine stop, sigma boards and other similar type of boards (approx. area in range of 1200-6000 sq.cm.). 24
44
554
24384.8
... More
Supply of material for 5/7 MM dropper wire for re-droppering of spans. 25
20
1063
21264
... More
Breaking of concrete foundation of mast, portal, TTC etc. 26
3
1776
5328.3
... More
Dismantling of cantilever assembly. 27
1
1759
1759
... More
Dismantling & removal of mast, portal, TTC & other small part steel. 28
0.1
-
1019.61
... More
Dismantling of mast/upright by cutting. 29 30.00 Per Track
3
2228
6684
... More
Preparation of as erected LOP. 30
-
157941
157941
... More
Checking and preparation of SED.
1
737
737.1
... More
Adjustment of insulated / un-insulated overlap.
2
1289
2579.2
... More
Dismantling of Auxiliary Transformer with complete accessories and mounting arrangement and handing over to concerned TRD staff.
2
9394
18789
... More
OHE slewing, re-slewing work for 3 spans and ATD locking, unlocking work for 2 ATDs for single line OHE (Rates are incl. of work under power block). Work includes securing / holding OHE till completion of work (RUB/Girder launching etc.). 34
20
57785
1155712
... More
Transportation charges for OHE material.
150
14
2175
... More
100% extra on erection rates for work done under power block for items mentioned below:
-
-
76805.81
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%