North Western Railway Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 4,84,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Water Proofing Treatment Of 05 No. Rubs (5b, 9b, 11a1, 17a & 37a) In Rewari- hisar Section And Provision Of Covering Shed On 02 No. Rubs (24 A & 24b) On rewari-sadulpur Section.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
236-24-25-BIKANER DIVISION-ENGINEERING/NORTH WESTERN RLYTender No
236-24-25Tender Authority
North Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
All items of all other chapters except S.No. 1 to 3 mentioned above of CPWD DSR ( Amended up to date )
-
-
3410526.18
... More
All items of Bridge Works Substructure appearing in chapter 02 of IRUSSOR Items( Amended up to date )
-
-
19670607.97
... More
All items of Bridge Works -Misc. appearing in chapter 05 of IRUSSOR Items( Amended up to date ) 3
-
-
3676219.63
... More
All other chapters excluding above shown
-
-
546211.52
... More
Chipping of unsound weak concrete, removing all spalled concrete, cleaning of rust 1 from affected reinforcement bars wherever required with wire brush. Providing and applying modified anti-crossing coating on already cleaned bars / Dosage:- Min 1.6/ sqm/layer or eq. material as per direction of engineer in charge. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days.
2000
261
523660
... More
Providing and applying epoxy resin bonding agent like SIKADUR 32 LP or eq. on the 2 entire chipped surface Flexural strength: 30-35 N/mm2 Tensile Strength: 16-20 N/mm2 or eq. material of reputed brands as per direction of engineer in charge.2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days.
320
415
133072
... More
Providing and applying micro concrete for repair of small damaged patched in RCC structure. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
2250
103
233910
... More
Providing and applying a pre-batches one component polymer modified cementitious mortar as top cover over the chipped surface product requirement yield approx. 0.84ltr./ kg system 4 requirement: Compressive strength >=50 n.mm2 (28days) according to ASTM C 109 Flexural strength: 3N/MM2 (7 days) according to ASTM C293- 79. All Works shall be done as per engineer in charge. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
1440
231
332683.2
... More
Injection Grouting with Conbextra EP-10 or eq, through the fixed NRV as per the direction of the Engin-charge. Conbextra EP-10 two component High strength epoxy grout cost 5 including of all material labour, at all heights including providing and fixing of nipple / NRV of required size and remocing / repairing of nipple complete. Density : Approx 1050 kg/m3 Tensile Strength : 20N / mm2 @ 7 days Flexural Strength : 40N. mm2 @ 7 days Compressive Strength : 45 N/mm2 @ 1 Day, 60 N/mm2 @ 3Days, 80 N/mm2 @ 7 Days. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
135
3202
432280.8
... More
Supply and apply 2 component, elastic, low viscous, solvent free polyurethane injection resin based system for permanent sealing that does not need the presence of water for hardening reaction rapid reaction. Project requirement, viscosity of mixture< 100m Pas(at + 20 X). 6 Capable of penetrating cracks > 0.2 mm wide a CE conformity conformance lable that product is approved to the essential requirement and under market surveillance product Make SIKA, NORMET, CAC, BASK or Equivalent. 100% PAYMENT shall be released only after satisfactory completion of work 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
3500
1655
5795020
... More
Providing and injection microfine injection grout pagel ZL 10 or equivalent in the RCC 7 plianth of tract under high pressure upto 30 bar or as per site requirement during non traffic hours. Rates inclusive of providing, fixing cutting of non-return packers of required size and repairing the surface with polymer mortar complete at all heights.2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
2000
554
1108940
... More
Cleaning of surface to remove existing plaster (if any), dust and loosly adhering particles completely and repairing all Cracks & joints with polymer modified high strength mortar. Providing and laying waterproofing treatment by applying IZONIL Hard - 100% waterproof, breathable and drying, fiber reinforced ready to use plaster in two layer at an average thickness of 15 mm (7.5 + 8 7.5mm), sandwiched with 110 GSM glass fiber mesh as per manufacturers specification, in line and level and finished smooth. Prior to application of Izonil Hard, entire surface should be water cured and bring to SSD condition. For increased adhesion , it is recommended to apply a cement slurry coat on brick wall before izonil application. The IZONIL waterproofing system shall be cured for 5 to 7 days and curing should start within 5-6 hours of application. 2.100% PAYMENT shall be released only after satisfactory completion of work (in all respect) plus 60 days
2000
998
1996100
... More
Supplying and fixing Galvanized steel/Galvalume self supporting sheet in roofing made from mild steel having thickness minimum 0.80 BMT having coating of zinc/Aluminium + Zinc including cutting to size and shape including fixing. The rates shall includes all cost of materials, taxes, labour, tools, plants, fixture etc. complete and fixing as per direction of Engineer in charge at site. Note:-Contractor will have to be submit the design of the roofing for approval of the Railway. Roof shall be provided only after getting it approved from the Railway.
-
-
9
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%