National Fertilizers Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

National Fertilizers Limited - NFL Tender

Works
Eprocure
Opening Date9 Jul 2024
Closing Date30 Jul 2024
Tender Amount₹ 3,57,00,109 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1-Upto & Including Sch 40

5185

-

-

... More
2-Above Sch 40 & upto Sch 80

550

-

-

... More
3-Above Sch 80 & upto Sch 160

50

-

-

... More
B-Fabrication including cutting, edge preparation, welding, providing reinforcement pads at branch connection, if required, transportation of SS pipe & pipe fittings to work site. Rates of fabrication should be per inch dia. The fabrication of Mitre bends of various sizes and type will be included in the job.transportation of SS pipe & pipe fittings to work site. Rates of fabrication should be per inch dia. The fabrication of Mitre bends of various sizes and type will be included in the job.

-

-

-

... More
Rate per inch nominal dia of pipe per welding joint

-

-

-

... More
1-Upto & Including Sch 40

910

-

-

... More
2-Above Sch 40 & upto Sch 80

11

-

-

... More
3-Root run by TIG welding only

90

-

-

... More
C-Fabrication including cutting, edge preparation, welding (By IBR qualified Welder), providing reinforcement pads at branch connection, if required, transportation and assistance for X-Ray & Stress Relieving of Alloy Steel and Carbon Steel pipes (IBR) and pipe fittings to Work Site. Rates of fabrication should be per inch dia.

-

-

-

... More
Rate per inch nominal dia of pipe per welding joint

-

-

-

... More
1-Above Sch 40 & upto Sch 80

100

-

-

... More
2-Above Sch-80 and upto Sch-160

6

-

-

... More
D-Gas cutting of old pipes, flanges & other fittings &shifting to sites as per instruction of Engineer in charge:

-

-

-

... More
Rate per inch nominal dia of Pipe

-

-

-

... More
1-Upto & Including Sch 40

2210

-

-

... More
2-Above Sch 40 & upto Sch 80

200

-

-

... More
3-Above Sch 80 & upto Sch 160

3

-

-

... More
E-Fabrication of Pipe/Tube by heating/cold bending.

-

-

-

... More
Rate per inch nominal dia per Meter

-

-

-

... More
1-Upto & Including 6 mm thickness

10

-

-

... More
F-Cutting of CS plate.

-

-

-

... More
Rate per running inch

-

-

-

... More
1-Upto & including 6 mm thickness

21110

-

-

... More
2-Above 6 mm upto 12 mm thickness

35735

-

-

... More
3-Above 12 mm upo 20 mm thickness

2645

-

-

... More
4-Above 20 mm thickness

400

-

-

... More
G-Cutting of SS Plate.

-

-

-

... More
Rate per running inch

-

-

-

... More
1-Upto & including 3 mm thickness

3160

-

-

... More
2-Above 3 mm upto 6 mm thickness

2050

-

-

... More
3-Above 6 mm upto 10 mm thickness

1710

-

-

... More
H-Cutting of SS pipes, flanges & other fittings &shifting to sites as per instruction of Engineer in charge

-

-

-

... More
Rate per running inch

-

-

-

... More
1-Upto & Including Sch 40

230

-

-

... More
2-Above Sch 40 & upto Sch 80

20

-

-

... More
3-Above Sch 80 & upto Sch 160

1

-

-

... More
I-Erection of pipe including lifting, placing on sleeper/racks at all elevation, levelling, alignment, jointing of flanges including insertion of gaskets and bolting and supply of manpower for testing and flushing, if required. For steam jacketed piping, erection shall be measured for both core and jacket pipe.

-

-

-

... More
Rate per inch nominal dia per Meter length of Pipe

-

-

-

... More
1-Upto & including Sch 40

5565

-

-

... More
2-Above Sch 40 & upto Sch 80

395

-

-

... More
3-Above Sch-80 and upto Sch-160

20

-

-

... More
J-Fabrication of eccentric reducer and other fabrication out of plate fabrication.

-

-

-

... More
Rate per inch welding length

-

-

-

... More
1-Upto 6 MM Thickness

11110

-

-

... More
2-7 MM to 10 MM thickness

20550

-

-

... More
3-11 MM to 15 MM thickness

15750

-

-

... More
4-16 MM to 25 MM thickness

660

-

-

... More
K-Running welding with joint preparation etc. Running welding of longitudinal joints of the jacket of steam jacketed piping shall also come under the scope of this item.

-

-

-

... More
1-Upto 6 MM Thickness

16630

-

-

... More
2-7 MM to 10 MM thickness

7600

-

-

... More
3-11 MM to 15 MM thickness

780

-

-

... More
4-16 MM to 25 MM thickness

430

-

-

... More
L-Rate per MT

-

-

-

... More
1-Fabrication & Erection of Steel Structure like Staircase, Ladder Platform, Walkways, Railings ,Pipe Support etc.

25

-

-

... More
2-Fabrication&Erection of Rectangular Vesels, Chutes, Hopper & Ducts etc.from CS Plate by Cutting, Grinding Welding etc from 5 mm to 25 mm thickness Plate.

1

-

-

... More
M-Replacement of stair case grating and floor grating.

-

-

-

... More
1-Replacement of damaged pre-fabricated Staircase/Floor Grating by fabrication.

115

-

-

... More
2-Dismantling of various type of Structure, Vessels,Pumps, Gear boxes, pipes and Miscellaneous equipments by Gas cutting of bolts etc. Opening the bolts at various Elevation including opening of flanges, bolts, nuts welding alignment and allied jobs

40

-

-

... More
3-Erection of various types of Structures,Vessels,Pumps, Gear boxes, pipes and miscellaneous Equipment at various elevation including boxing up of flanges bolts & nuts, welding, alignment and allied jobs.

25

-

-

... More
N-Fabrication of clamp and fixing of feed plate(patch wor)/clamp as per requirement( Attending leakages as per the Scope of work)

-

-

-

... More
1-Clamp size 2’ to 4”

25

-

-

... More
2-Clamp size 5” to 8”

15

-

-

... More
3-Clamp size 10” to 14”

5

-

-

... More
4-Clamp size 15” to 20”

5

-

-

... More
Annexure-II

-

-

-

... More
A-Fixing of Gate Valve, Globe Valve, Diaphragm Valve, Check Valve, Plug Valve, Ball Valve, Butterfly Valve, Relief and Safety Valve of all sizes.

-

-

-

... More
Rate per Inch Nominal dia of Valve

-

-

-

... More
1-Valve upto 300 psi rating

8

-

-

... More
2-Valve from 600 to 900 psi #

3

-

-

... More
3-Valve 1500 psi and above.

1

-

-

... More
B-Opening & Fixing of Gate Valve, Globe Valve, Diaphragm Valve, Check Valve, Plug Valve, Ball Valve, Butterfly Valve of all sizes.

-

-

-

... More
Rates when Valves are not to be Transported to Workshop (Mech)

-

-

-

... More
Rate per Inch Nominal dia of valve

-

-

-

... More
1-Valve upto 300 psi rating

390

-

-

... More
2-Valvefrom 600 to 900 psi #

5

-

-

... More
3-Valve 1500 psi and above.

1

-

-

... More
C-Rates when Valves are to be Transported to Workshop (Mech)

-

-

-

... More
Rate per Inch Nominal dia of valve

-

-

-

... More
1-Valve upto 300 psi rating

1

-

-

... More
2-Valve from 600 to 900 psi #

1

-

-

... More
3-Valve 1500 psi and above.

1

-

-

... More
D-Opening & Fixing of bonnet of valve in Raw water plant filter beds including replacement of spindle Gate Valve, Globe Valve, Diaphragm Valve, Check Valve, Plug Valve, Ball Valve, Butterfly Valve of all sizes.

-

-

-

... More
Rate per Inch Nominal dia of valve

-

-

-

... More
1-Valve upto 300 psi rating

265

-

-

... More
E-Opening & boxing of Safety Valves including transportation of Valves to Workshop and back to Site.

-

-

-

... More
Rate per Inch Nominal dia of inlet flange of Safety Valve

-

-

-

... More
1-Valve upto 300 psi rating

45

-

-

... More
2-Valve from 600 to 900 psi #

2

-

-

... More
F-Opening & boxing up of flanges and manhole covers:

-

-

-

... More
1-Upto 300 psi rating

2525

-

-

... More
2-From 600 to 900 psi #

45

-

-

... More
3-1500 psi and Above

10

-

-

... More
4-Opening, normalizing ( cleaning of flange seat , replacement of flanges if required, replacement of gasket and boxup of the fermanited flanges of various Sizes). Cutting of bolts if required.

-

-

-

... More
a-Flanges of rating 150#

50

-

-

... More
b-Flanges of rating 300#

50

-

-

... More
c-Flanges of Rating 600#

50

-

-

... More
Note:1-Any flange rating falls in between two flange rating, payment will be made on the basis of higher rating flange.

-

-

-

... More
2-For Safety Valve, the size will be taken of inlet flange rating.

-

-

-

... More
G-Opening & boxing up of bolts and nuts for flanges, Manhole covers and equipments. Rate should be quoted per bolt basis.

-

-

-

... More
1-Bolt Size 1/2 inch & Below for rating upto 300 lbs.

25

-

-

... More
2-Bolt Size upto 5/8 inch for rating upto 300 lbs.

70

-

-

... More
3-Bolt Size upto 3/4 inch for rating upto 300 lbs.

12

-

-

... More
4-Bolt Size upto 1 Inch for rating upto 300 lbs.

7

-

-

... More
5-Bolt size upto 1&1/4 inch for rating upto 300 lbs.

1

-

-

... More
6-Bolt size upto 1&1/2 inch for rating upto 300 lbs.

1

-

-

... More
7-Bolt Size upto 2 Inch for rating upto 300 lbs.

1

-

-

... More
Annexure-III

-

-

-

... More
A-Replacement of Gate Valve, Globe Valve, Diaphragm Valve, Non-return valve, Check Valve, Plug Valve, Ball Valve, Butterfly Valve, Relief and Safety Valve of all sizes.

-

-

-

... More
Rate per inch diameter

-

-

-

... More
1-Upto 300 lbs rating valve

7

-

-

... More
2-600 lbs to 900 lbs rating Valve

65

-

-

... More
3-1500 lbs rating Valve & above

7

-

-

... More
B-Replacment of welded valve by IBR welder

-

-

-

... More
1-Upto 1500 lbs rating Valve

30

-

-

... More
Annexure-IV

-

-

-

... More
A-Opening, Removal & boxing up of Dish End of Heat Exchanger.

-

-

-

... More
Reate per Inch dia of Dish End.

-

-

-

... More
1-Upto 300 lbs rating

970

-

-

... More
2-600 lbs to 900 lbs rating

1

-

-

... More
3-1500 lbs rating & above

1

-

-

... More
Note: 1-Diameter will correspondence to the outer diameter of dish end flange.

-

-

-

... More
2-Any dish end rating falls in between two rating, the payment will be made on the basis of higher rating dish end.

-

-

-

... More
B-Opening, Removal & boxing up of Shell of Heat Exchanger.

-

-

-

... More
1-Removal of Shell of U tube bundle of Heat Exchanger

2

-

-

... More
2-Boxing-up of Shell of U-tube bundle of Heat Exchanger

2

-

-

... More
Note-1: For removal & boxing up of Shell, the weight of the Shell only shall be taken into account.

-

-

-

... More
C-Replacement of Tube bundle of Heat Exchanger.

-

-

-

... More
1-Removal of Old Exchanger from position up-to 5 MT weight

1

-

-

... More
2-Re-fixing of New Exchanger in position upto 5 MT weight

1

-

-

... More
3-Removal of Tube bundle of Heat Exchanger

2

-

-

... More
4-Re-fixing of Tube bundle of Heat Exchanger

2

-

-

... More
Note: 1-For removal of Exchanger from position the weight of complete Exchanger shall be taken into account.

-

-

-

... More
2-For removal of Tube Bundle of Heat Exchanger the weight of Tube Bundle shall be taken into account.

-

-

-

... More
Annexure - V

-

-

-

... More
A-Handling of equipments, vessels and other miscellaneous Items.

-

-

-

... More
1-Handling of Equipment, Vessel Equipment Parts and other Misc items within Plant/Work-shop.

1

-

-

... More
2-Shifting of Equipment Vessel Equipment Parts and other Misc items from One Plant to other Plant and from Plant to Workshop and vice-versa.

25

-

-

... More
Annexure - VI

-

-

-

... More
A-Job in Dust Chamber:

-

-

-

... More
1-Replacement of dust chamber Filter

105

-

-

... More
2-Opening & Boxing-up of 2" Nozzle

26

-

-

... More
Annexure - VII

-

-

-

... More
A-Repair of CFD Bed:

-

-

-

... More
1-Removal & re-fixing of SS Strip.

100

-

-

... More
2-Removal & re-fixing of 12 MM Skirt bolts.

40

-

-

... More
3-Cutting & Straightening of Skirt plate

1

-

-

... More
4-Removal & re-fixing of Complete SS Wire Mesh

1

-

-

... More
5-Removal of SS perforated plate straightening and re - fixing of plates.

1

-

-

... More
6-Fixing of Rubber Skirt

3

-

-

... More
Annexure - VIII

-

-

-

... More
A-Opening/box-up and tube plugging/welding job of exchanger

-

-

-

... More
1-Synthesis economizer EA 601 AB opening/box-up and tube plugging/welding job

1

-

-

... More
2-EA 603 opening/box-up and tube plugging/welding job

1

-

-

... More
Annexure-IX

-

-

-

... More
A-Jobs pertaining to SGP/CPP.

-

-

-

... More
Ash Handling system of SG Plant

-

-

-

... More
1-Opening & Boxing up of B - B/B-C Adopter Sleeve Coupling from Size 150 mm to 300 mm dia.

50

-

-

... More
2-Replacement of CI Fly Ash Pipe Line Size from 150 mm to 300mm (Max. length 5.5 MR)

6

-

-

... More
3-Replacement of CI Elbow Short/long Radius, Size from 150 mm to 200mm dia 90/45 Degree.

5

-

-

... More
4-Replacement of CI Lateral/Y Piece Size from 175 mm to 300mm dia 45 Degree.

1

-

-

... More
5-Repair & Replacement of Ash Extraction Valve (Ash Intake Valve) Size 150 mm to 175mm dia

1

-

-

... More
6-Replacement of Valve Body along with Disc of Ash Extraction Valve Size 150 mm dia

1

-

-

... More
7-Repair & Replacement of Totally Enclosed Rotary Slide Gate (TERSG Valve, Size 200 mm dia in Fly Ash line which includes Removal of TERSG Vale boxing up of TERSG Valve & Repair of Old TERSG Valve

1

-

-

... More
8-Repair & Replacement of Vacuum Breaker Ass'y Size 150 mm dia

1

-

-

... More
9-Exhauster Hydroveyor Assembly Size 200 mm dia (Approx. wt. 400 Kg)

1

-

-

... More
10-Replacement of CI Tube Combining (Tail piece) for Exhauster Hydroveyer Size 200 mm dia

1

-

-

... More
11-Replacement of Air Separator Tank of SG Plant (Approx Wt. 3 Te)

1

-

-

... More
12-Replacement of Segment of Air Separator Tank of SGP (Approx Wt 175 Kg)

1

-

-

... More
13-Replacement of Hydraulic Ejector Assembly (Jet Pump Ass'y) of Bottom Ash System (Approx Wt. 275 Kg)

2

-

-

... More
14-Replacement of Inlet Piece of Hydraulic Ejector of Bottom Ash System.

1

-

-

... More
15-Replacement of Combining Tube of Hydraulic Ejector of Bottom Ash System.

2

-

-

... More
16-Repair / Replacement of Butter fly Valve, Size 300 mm dia

1

-

-

... More
17-Replacement of Bearing of Clinker Grinder of SG Plant

2

-

-

... More
18-Repacking of Gland of Clinker Grinder of SG Plant

1

-

-

... More
19-Replacement of Clinker Grinder Bearing. Replacement including related jobs i.e. Gland packing Gear/Sprocket removal and fitting etc. of CPP

1

-

-

... More
20-Replacement of Seal of Bottom Ash Hopper Gate including dismentling/ refixing of gate housing, power cylinder, service water line connection etc.

1

-

-

... More
21-Repair & Replacement of Hydraulic Cylinder of Clinker Grinder.

1

-

-

... More
22-Replacement of bearing housing with Impeller of ID/FD Fan. Replacement includes removal of Impeller housing of ID/FD Fan casing, removal of impeller & fixing on overhauled/new bearing housing, putting in position , alignment & after completion of job, top

2

-

-

... More
B-Repair/Replacement of Coal & Oil Burner of SG Plant.

-

-

-

... More
1-Repair & Replacement of Coal Burner Assy.

12

-

-

... More
2-Repair & Replacement of Gas Burner Assy.

1

-

-

... More
3-Repair of Coal Nozzle Tips (includes Cutting/Removal of damaged Baffle Plates, repair of body, Hard Facing and checking of fitting of Seal Plates.

13

-

-

... More
4-Repair & Replacement of End Air Nozzle Tips

1

-

-

... More
C-Pulverised Fuel (P.F.) system of SG Plant .

-

-

-

... More
1-Opening & Boxing up of PF Line Victaulic Coupling, Size 300 mm dia.

20

-

-

... More
2-Opening & Boxing up of PF Line Orifice, Size 300 mm dia.

2

-

-

... More
3-Rotation of PF Distributor Outlet Pipe, Size 300 mm dia.

1

-

-

... More
4-Replacement of PF Distributor Outlet Pipe, Size 300 mm dia.

2

-

-

... More
5-Replacement of Coal Bends, Size 300 mm dia upto 60 Degree.

3

-

-

... More
6-Replacement of Coal Bends, Size 300 mm dia above 60 Degree upto 90 Degree.

3

-

-

... More
7-Repair of small Distributor (includes removal of old worn out Riffle Elements, Build up Hard Facing and fitting of New Riffle Elements)

1

-

-

... More
D-Jobs pertaining to Electro Static Precipitator of SGP

-

-

-

... More
1-Dismantling & Removal of Collecting Electrode Plate.

4

-

-

... More
2-Erection of Collecting Electrode Plate

9

-

-

... More
3-Dismentling & Removal of Emmitting Electrode

1

-

-

... More
4-Installation of Emitting Electrode

1

-

-

... More
5-Replacement of Rapping Hammer (Outer Arm)

32

-

-

... More
6-Repair & Replacement of Drive Shaft.

1

-

-

... More
7-Repair & replacement of Guide Rod(Tie Rod)

1

-

-

... More
8-Repair & replacement of Shock Bar

1

-

-

... More
9-Replacement of Shock Pad.

20

-

-

... More
E-Jobs pertaining to Coal Handling / Urea & Bagging Plant /Bentonite Sulphur Plant

-

-

-

... More
1-Impact Idlers (Rollers) Bracket Dismantling & Installation with New Idlers (Rollers) after repair for 750 mm & 1000 mm wide Belt.

10

-

-

... More
2-Replacement of Impact Idlers (Rollers) for 750 mm & 1000 mm wide Belt

3

-

-

... More
3-Self Aligning Idlers (Rollers) Bracket Dismantling & Installation with new Idlers (Rollers) after Repair for 750 mm & 1000 mm wide Belt.

1

-

-

... More
4-Replacement of Self Aligning Idlers (Rollers) for 600,750 mm & 1000 mm wide Belt.

3

-

-

... More
5-Troughing Idlers (Rollers) Bracket Dismantling & Installation with New Idlers (Rollers) for 750 mm & 1000 mm wide Belt.

47

-

-

... More
6-Replacement of Troughing Idlers (Rollers) of carrying side for 750 mm & 1000 mm wide Belt.

8

-

-

... More
7-Return Idlers (Rollers) Bracket Dismantling & Installation with New Idlers (Rollers) after repair for 750 mm & 1000 mm wide Belt.

30

-

-

... More
8-Replacement of Return Idlers (Rollers) for 600, 750 mm & 1000 mm wide Belt.

5

-

-

... More
9-Clamp Fatener Joint for 750 mm width Conveyor Belt.

1

-

-

... More
10-Replacement of Screen Cloth Panel of Vibrating Screen.

5

-

-

... More
11-Replacement of conveyor belt/oil resistant conveyor belt 1000mm/800mm/ 750mm/600mm

450

-

-

... More
12-Hot Vulcanizing Joint for 600/750/800/1000 mm wide Conveyer Belt/ oil resistant conveyor belt

4

-

-

... More
13-Replacement of Decksheet for 1350x1250x3 mm

10

-

-

... More
14-Replacement of Decksheet for 1350x1100x3 mm

10

-

-

... More
F-Job pertaining to Air preheater

-

-

-

... More
1-Replacement of Radial Seals (Hot End) for Air Preheater of SGP Boilers (Includes removal of old seals, repair of mounting surfaces, if any; re-fixing of New Seals, adjustment of clearances and trial run) - (There are 12 Sectors / APH)

1

-

-

... More
2-Replacement of Radial Seals (Cold End) for Air Preheater of SGP Boilers (Includes removal of old seals, repair of mounting surfaces, if any; re-fixing of New Seals, adjustment of clearances and trial run) - (There are 12 Sectors / APH)

1

-

-

... More
3-Replacement of Circumferential and Rotor Post Seals (Hot End) for Air Preheater of SGP Boilers (Includes removal of old seals, repair of mounting surfaces, if any; re-fixing of New Seals, adjustment of clearances and trial run)

1

-

-

... More
4-Replacement of Circumferential Seals and Rotor Post (Cold End) for Air Preheater of SGP Boilers (Includes removal of old seals, repair of mounting surfaces, if any; re-fixing of New Seals, adjustment of clearances and trial run)

1

-

-

... More
Annexure-X

-

-

-

... More
A-Opening/Inspection & Re-fixing of Demister.

-

-

-

... More
1-AFA-601 (Size 1500 x 150 mm)

1

-

-

... More
2-AGC-601 (Size 1650 x 150 mm)

1

-

-

... More
3-UDA-203 (Size 1788 x 100 mm)

1

-

-

... More
4-UDA-402 (Size 800 x 100 mm)

1

-

-

... More
B-Opening/Inspection & Replacement of Demister in New Ammonia Plant.

-

-

-

... More
1-F 302 CO2 absorber demister replacement

1

-

-

... More
2-F 551 Purge Gas Absorber demister replacement

1

-

-

... More
Annexure - XI

-

-

-

... More
A-Supply of Contract labour for unplanned/unforeseen Plant Break-down/Shut-down Jobs:

-

-

-

... More
Labour Rates (Rate per working day of 8 Hours))

-

-

-

... More
1-General Fitter/HES fitter(Highly Skilled Labour)

1320

-

-

... More
2-Auto Electrician(Highly Skilled Labour)

310

-

-

... More
3-Rigger(Skilled Labour Gr.B)

3145

-

-

... More
4-Welder (IBR)

20

-

-

... More
5-Welder(Non-IBR)(Skilled Labour Gr.B)

460

-

-

... More
6-Turner/Machinist(Highly Skilled Labour)

600

-

-

... More
7-Mazdoor/Helper(Unskilled )

10140

-

-

... More
B-Labour Rates (Over Time Rate per Hours)

-

-

-

... More
1-General Fitter/HES fitter(Highly Skilled Labour)

1685

-

-

... More
2-Auto Electrician(Highly Skilled Labour)

145

-

-

... More
3-Rigger(Skilled Labour Gr.B)

4230

-

-

... More
4-Welder (IBR)

15

-

-

... More
5-Welder(Non-IBR)(Skilled Labour Gr.B)

510

-

-

... More
6-Turner/Machinist(Highly Skilled Labour)

160

-

-

... More
7-Mazdoor/Helper(Unskilled )

15580

-

-

... More
Annexure - XII

-

-

-

... More
ITEM FOR UREA PLANT:

-

-

-

... More
A-Opening & boxing up of swirl of UDA-201.

-

-

-

... More
1-OD of perforated plate : 2050 MM, No. of Swirl: 1087

1

-

-

... More
B-Opening and Box-up of Demister & Perforated plates of UDA-202

4

-

-

... More
C-Opening and Box-up of UGA-403 strainer.

4

-

-

... More
D-Opening and box-up of UGA-404 Strainer

2

-

-

... More
E-Opening & box up of UGB-102 motor radiator.

4

-

-

... More
F-Repair of Wagon Hauler:

-

-

-

... More
1-Single Joint of Wire Rope

1

-

-

... More
2-Double Joint of Wire Rope

1

-

-

... More
3-Replacement of Bearing of Wagon Hauler Pulley

7

-

-

... More
4-Replacement of Wagon Hauler Pulley

1

-

-

... More
5-Replacement of wire rope of wagon hauler - 650mtr including shift of wire rope, lifting & normalizing counter weights of wagon hauler, installing of wire rope and connecting of wire rope with single or double joint as required. Shifting of wire rope from store to site and site to scrap yard

1

-

-

... More
G-Repair of Bucket Elevator.

-

-

-

... More
1-Replacement of Chain along with bucket

7

-

-

... More
2-Replacement of Sprockets, Head Tail End

1

-

-

... More
3-Replacement of Bearings of Sprockets

1

-

-

... More
4-Replacement of Each Bucket.

2

-

-

... More
H-Replacement of Troughing, Carrying Rollers Assembly complete by removing & re-fixing of brackets.

-

-

-

... More
1-For 1000 mm wide belt

15

-

-

... More
2-For 600 mm wide belt

16

-

-

... More
3-For 400 mm wide belt

7

-

-

... More
I-Replacement of Return Rollers .

-

-

-

... More
1-For 1000 mm Belt

6

-

-

... More
2-For 600 mm Belt

10

-

-

... More
J-Replacement of gearbox of conveyor belt in Urea and Bagging Plant.

-

-

-

... More
1-600 mm

1

-

-

... More
2-1000 mm

1

-

-

... More
Annexure - XIII

-

-

-

... More
ITEMS FOR SMC & UREA PLANT

-

-

-

... More
A-Replacement of Pulley Bearing

-

-

-

... More
1-Bearing UCP-10

1

-

-

... More
2-Bearing UCP-12

1

-

-

... More
3-Bearing UCP-15

1

-

-

... More
4-Bearing UCP-17

1

-

-

... More
B-Replacement of Conveyor belt pulley with new bearing .

-

-

-

... More
For Urea Plant & Bagging Plant

-

-

-

... More
1-Pully dia 500x700 Length 1150 for 1000 mm conveyor belt

1

-

-

... More
2-Pully dia 850 Length 1100 for 1000 mm conveyor belt

1

-

-

... More
3-Pully dia 500 Length 850/900 for 800 mm conveyor belt

1

-

-

... More
4-Pully dia 510 Length 750 for 600 mm conveyor belt

1

-

-

... More
For SMC Plant

-

-

-

... More
1-Pulley size 630/650 dia x 1100/1150

1

-

-

... More
2-Pulley size 500 dia X 1150

1

-

-

... More
3-Pulley size 500 dia X 900/850

1

-

-

... More
4-Pulley size 400 dia x 1150

1

-

-

... More
5-Pulley size 400 dia x 900/850

1

-

-

... More
C-Replacement of Expansion Bellow:

-

-

-

... More
1-Expansion Bellow size 1120x1780x 300 mm

1

-

-

... More
2-Expansion Bellow size 1200x4445x 250 mm

1

-

-

... More
3-Expansion Bellow size 1700x4364x 250 mm

1

-

-

... More
4-Expansion Bellow size 1700x2240x 250 mm

1

-

-

... More
5-Expansion Bellow size 4200x5760x 360 mm

1

-

-

... More
Annexure - XIV

-

-

-

... More
A-ITEMS FOR MECHANICAL WORKSHOP

-

-

-

... More
1-Scrap removal, machine cleaning and lubrication of guide ways etc.of Boring M/c,Lathe M/c(six Nos.),Radial Drilling M/c,Horizotal Surface Grinder,shaper and Slotter (2Nos.),Cylinderical grinder,Lapping M/c, Milling M/c and hydraulic press(200Te)

9

-

-

... More
2-Loading of jobs, Centering/Setting and unloading of Boring M/c,Lathe M/c(six Nos.),Radial Drilling M/c,Horizotal Surface Grinder,shaper and Slotter (2Nos.), Cylinderical grinder, Milling M/c and hydraulic press(200Te)

4

-

-

... More
3-Assistance for polishing work for Workshop Machinery i.e. Lathe M/c(six Nos.),Radial Drilling M/c Shaper and Slotter (2Nos.), Milling M/c etc.

4

-

-

... More
4-Assistance for repair of valves/overhauling and for fabrication shop

7

-

-

... More
B-Job pertains to Heavy Earth Moving Section (Auto Section)

-

-

-

... More
Rate for No. of Times jobs to be done in a year

-

-

-

... More
1-Assistance in upkeep/maintenance of Auto Section of its various equipment I.e.127Te/75Te/Coles Crane,Hydra crane (3Te,5Te,8Te), Dozer (D-80 A12),Loader (Terex), 50HX Backhoe Loader,Tractor Trolley etc.as well as deployment of various Cranes/Tractor Trolle

4

-

-

... More
C-Deployment of Operator for operating various equipments.

-

-

-

... More
1-127 Te/75Te Crane

150

-

-

... More
2-Coles Crane/50 HX Backhoe Loader

140

-

-

... More
3-14 Te/8 Te/5Te/3Te Hydra

550

-

-

... More
4-Tractor

60

-

-

... More
D-Deployment of Operator for operating various equipments. (Over time rate/ hour)

-

-

-

... More
1-127 Te/75Te Crane  (Over time)

90

-

-

... More
2-Coles Crane/50 HX Backhoe Loader (Over time)

80

-

-

... More
3-14Te/8 Te/5Te/3Te Hydra (Over time)

300

-

-

... More
4-Tractor

50

-

-

... More
JOB PERTAINING TO EARTH MOVING

-

-

-

... More
E-Servicing of Crane and other Heavy Earth moving equipments. Job includes repalcement of all filters of air, L.O, diesel and hydraulic oil system including replacement of Lubricating/ hydraulic Oil. Greaing of all greasing points adjustment/ replacement

-

-

-

... More
1-Servicing of dozer D80- A 12

1

-

-

... More
2-Servicing of P&H 75 Te crane

1

-

-

... More
3-Servicing of coles crane 12T

1

-

-

... More
4-Service of escorts hydra cranes 8 Te cap,

1

-

-

... More
5-Service of escorts hydra cranes 5Te cap,

1

-

-

... More
6-Service of escorts hydra cranes 3 Te cap,

1

-

-

... More
7-Cleaning of radiator of dozer, Job includes removal of radiator and its fan, cleaning of fins from outside and assembly of the same. If required centre arm is also to be removed to take out the radiator.

1

-

-

... More
8-Cleaning of air filter of dozers, Job includes removal of filter elements and cleaning of the same with air and boxing up back.

4

-

-

... More
9-Reduction/extension of boom of 127 Te mobile crane of length as per the plant-in-charge instruction. Job includes shifting of extension piece to site. Removal of hook, pins stay wires etc after lowering the boom and fixing/ removal of the extension piece and fixing the same. Fixing of extension piece and removal of the same after completion of the work shall be considered one time only and considered for full lengh of boom.

1

-

-

... More
10-Reduction/extension of boom of 75Te mobile crane of length as per the plant-in-charge instruction. Job includes shifting of extension piece to site. Removal of hook, pins stay wires etc after lowering the boom and fixing/ removal of the extension piece and fixing the same. Fixing of extension piece and removal of the same after completion of the work shall be considered one time only and considered for full lengh of boom.

1

-

-

... More
Annexure - XV

-

-

-

... More
LOAD TESTING OF CRANES & LIFTING TACKLES:

-

-

-

... More
A-Annual load testing of cranes & lifting tackles includes the lubrication of all the points, checking the brake blocks/brake liners etc. for proper operation with respect to load testing. In case of any abnormality faced in operation during load testing of Cranes/Hydra/EOT shall be rectified by NFL. Trolley mounted/chain blocks shall be attended by contractor. Spares, if required, will be provided by NFL free of cost.

-

-

-

... More
Cranes/Hydra/EOT Cranes

-

-

-

... More
1-TATA P&H Crane Cap. 127 Te, Located at Mech Workshop

1

-

-

... More
2-TATA P&H Crane Cap. 75 Te, Located at Mech Workshop

1

-

-

... More
3-Coles Crane Cap. 12.5 Te, Located at Mech Workshop

1

-

-

... More
4-Hydra 8Te Located at Mech Work-shop

1

-

-

... More
5-Hydra 5 Te Located at Mech. Work-shop

1

-

-

... More
6-Hydra 3 Te Located at Mech. Work-shop

1

-

-

... More
7-M/s Garlic Udyog O/H Crane, capacity 20 Te in Urea Compressor House.

1

-

-

... More
8-M/s Mukand Engg. O/H Crane Cap. 20/5 Te in Ammonia Comprssor House

1

-

-

... More
9-M/s Garlic Udyog O/H Crane, capacity 10 Te in Workshop.

1

-

-

... More
10-M/s Garlic Udyog O/H Crane, capacity 5 Te in O&U Compressor House.

1

-

-

... More
11-M/s Khandewal Udyog EOT Crane Cap. 5 Te of Urea Pump House and Bagging Plant Empty Bag Store

1

-

-

... More
12-M/s Garlic Udyog O/H Crane, capacity 0.5 Te in RWP Chemical Dozing House

1

-

-

... More
13-M/s khandewal Udyog O/H Crane, capacity 43/10 Te in TG House CPP.

1

-

-

... More
14-Single Girder EOT Crane (BUC Make), capacity 5 Te, Located at Slurry Pump House and Ash Water Pump House.

1

-

-

... More
15-Wire Rope Hoist (TAK Elect. Make), capacity 7.5 MT at Prilling Tower Top.

1

-

-

... More
16-Wire Rope Hoist (Tirfor Make), capacity 1.6 MT at Urea Syn. Reactor Top.

1

-

-

... More
17-Wire Rope Hoist, capacity 2 MT at Hydro Vector Tower of SG Plant.

1

-

-

... More
18-Wire Rope Hoist, capacity 2 MT at Hydro Vector Tower of CPP Plant.

1

-

-

... More
19-Chain Hoist, capacity 2 MT at Bowl Mills Bay & Fireman's Floor in SGP and Coal Feeder in CPP.

1

-

-

... More
20-M/S garlic udyog O/H EOT crane capacity 25/5 Te in old ammonia compressor house

1

-

-

... More
21-M/S armsel engg. O/H EOT crane capacity 25/5 Te in new ammonia compressor house

1

-

-

... More
22-M/S HERCULEOS. O/H EOT crane capacity 1Te in Bentonite Sulphur plant

1

-

-

... More
23-Pick & Carry Crane( 14 Te Hydra)

1

-

-

... More
B-Chain Pulley Blocks.

-

-

-

... More
Rates for Testing only.

-

-

-

... More
1-Chain Pulley Block, capacity 0.5 Te

1

-

-

... More
2-Chain Pulley Block Capacity 1.0 Te

2

-

-

... More
3-Chain Pulley Block, capacity 1.5 Te

1

-

-

... More
4-Chain Pulley Block Capacity 2.0 Te

3

-

-

... More
5-Chain Pulley Block Capacity 3.0 Te

2

-

-

... More
6-Chain Pulley Block Capacity 4.0/5.0 Te

2

-

-

... More
7-Chain Pulley Block Capacity10.0 Te

1

-

-

... More
C-Rates for Repair/Overhauling & Testing

-

-

-

... More
1-Chain Pulley Block Capacity 0.5 Te

1

-

-

... More
2-Chain Pulley Block Capacity 1.0 Te

4

-

-

... More
3-Chain Pulley Block Capacity 2.0 Te

4

-

-

... More
4-Chain Pulley Block Capacity 3.0 Te

6

-

-

... More
5-Chain Pulley Block Capacity 4.0/5.0 Te

4

-

-

... More
6-Chain Pulley Block, capacity 7.5 Te

1

-

-

... More
7-Chain Pulley Block, capacity 10.0 Te

1

-

-

... More
Annexure - XVI

-

-

-

... More
Electrical Dept.

-

-

-

... More
A-Shifting of ID Fan Motors.

-

-

-

... More
1-Shifting of ID Fan Motors

5

-

-

... More
A-II-Replacement and shifting of UJD-301 A & B Screw conveyor geared motors

1

-

-

... More
B-Opening/fixing of Electrical Motors and placing in the Plant for repair. Repair will be in the scope of NFL.

-

-

-

... More
Rates when Motors are not to be shifted to Elect. Workshop

-

-

-

... More
1-From 11 K.W. to 90 KW

2

-

-

... More
2-From 90 K.W. to 315 KW

1

-

-

... More
3-Above 315 KW Motor

1

-

-

... More
C-Rates when Motors are to be shifted to Elect. Workshop

-

-

-

... More
1-From 11 K.W. to 90 KW

1

-

-

... More
2-From 90 K.W. to 315 KW

1

-

-

... More
3-Above 315 KW Motor

1

-

-

... More
4-UGB-302, 600 KW at Prilling Tower Top at 65 Meter Height (Approximate Weight 6 MT)

1

-

-

... More
5-UGA-302 A & B, 125 KW at Prilling Tower Dust Chamber at 50 Meter Height (Approximate Weight 1.5 MT)

1

-

-

... More
Annexure - XVII

-

-

-

... More
Valves pertaining in Instrument Dept.

-

-

-

... More
A-Upto & including 3" dia

-

-

-

... More
1-Opening upto 600 lbs Rating.

33

-

-

... More
2-Re-fixing upto 600 lbs Rating.

34

-

-

... More
3-Opening above 600 lbs Rating.

1

-

-

... More
4-Re-fixing above 600 lbs Rating.

1

-

-

... More
B-Above 3" dia and upto & including 6" dia:

-

-

-

... More
1-Opening upto 600 lbs Rating.

50

-

-

... More
2-Re-fixing upto 600 lbs Rating.

50

-

-

... More
3-Opening above 600 lbs Rating.

1

-

-

... More
4-Re-fixing above 600 lbs Rating.

1

-

-

... More
C-Above 6" dia and upto & including 12" dia:

-

-

-

... More
1-Opening upto 600 lbs Rating.

6

-

-

... More
2-Re-fixing upto 600 lbs Rating.

6

-

-

... More
Annexure - XVIII

-

-

-

... More
A-Replacement of Economiser Tube of Boiler: (Involves Cutting to reach weak tube, edge preparation, fitting of new tube, root run, DP check, final welding, Assistance in X-Ray and Hydro test. Also includes erection of scaffolding & working platform, wherever required. Welding shall be carried out by an IBR qualified Welder). It includes 2 welding joints per tube upto the length of 6.4 Meter.

-

-

-

... More
1-Economiser Tube Welding Joint (Upto Tube OD 63.5 mm)

1

-

-

... More
2-Economiser Tube Length Erection (Upto Tube OD 63.5 mm)

1

-

-

... More
B-Replacement of Water Wall Tube of Boiler: (Involves cutting, edge preparation, fitting of new tube, root run, DP check, final welding, Assistance in X-Ray, Hydro test and welding of sealing fin. Also includes erection of local additional scaffolding & working platform, wherever required. welding shall be carried out by an IBR qualified Welder).

-

-

-

... More
1-Water Wall Tube Welding Joint (Upto Tube OD 76.2 mm)

11

-

-

... More
2-Water Wall Tube Length Erection (Upto Tube OD 76.2 mm)

1

-

-

... More
C-Replacement of Super Heater Tube of Boiler: (Involves cutting, edge preparation, fitting of new tube, root run, DP check, final welding, Assistance in X-Ray and Hydro test. Also includes erection of local additional scaffolding & working platform, wherever required. Welding shall be carried out by an IBR qualified Welder).

-

-

-

... More
1-Super Heater Tube Welding Joint (Upto Tube OD 63.5 mm)

4

-

-

... More
2-Super Heater Tube Length Erection (Upto Tube OD 63.5 mm)

4

-

-

... More
D-Repair job in Steam Drum and Mud Drum of BHEL & MES Boiler

-

-

-

... More
1-Plug Welding in Steam Drum and Mud Drum of BHEL & MES Boiler

1

-

-

... More
2-Seal Welding in Steam Drum of BHEL & MES Boiler

1

-

-

... More
3-Seal Welding in Mud Drum of BHEL & MES Boiler

1

-

-

... More
Note: One set mentioned under item code 18.01D.01 mean 1 No. each in Steam & Mud Drum

-

-

-

... More
E-Erection & dismantling of scaffolding for various jobs at various heights inside/outside Boiler, Furnace, Steam Start-up Heater or any other Vessels as under:

-

-

-

... More
1-Upto & including 10 meter height

375

-

-

... More
2-Above 10 Meter upto & below 25 meter height

2

-

-

... More
3-Above 25 Meter Height

1

-

-

... More
Note:

-

-

-

... More
1-Scaffolding material(Steel Pipe & other fittings) supplied by NFL

-

-

-

... More
2-Area of platform with Steel Planks & Steel Challies shall be arranged by contractor.

-

-

-

... More
3-A safe Approach by ladder & Intermediate stay will be made for reaching the work place.

-

-

-

... More
4-Area of Platform will be considered for measurement purpose.

-

-

-

... More
Annexure - XIX

-

-

-

... More
A-Additional items to be excuted in different Section/Plant.

-

-

-

... More
1-Heating of Pipe Lines of Urea and Bentonite Sulphur plant

2

-

-

... More
2-Heating of Mechanical Components like Bearings, Couplings, Hubs etc. during Mounting/ Dismounting at the time of assembly of Equipments (All consumables like Oxygen, DA Gas etc. required for this job will be in the scope of Party)

36

-

-

... More
Annexure - XX

-

-

-

... More
A-REPAIR/OVERHAULING OF BOWL MILLS AND MAINT. OF ASH DISPOSAL LINE EXHAUSTER & GEAR BOX AND ITS COMPONENTS

-

-

-

... More
JOB PERTAINS TO RC FEEDER:

-

-

-

... More
1-Replacement(Including Fabrication & Hard facing) of Square Coal Feed Chute between Coal Bunker Hopper and Coal Feed Gate.

1

-

-

... More
2-Reapir & Replacement of Coal Feed Gate (Including Hard Facing)

1

-

-

... More
3-Replacement(Including Fabrication & Hard facing) of Square Inverted Pyramid Coal Inlet Chute between Coal Feed Gate & RC Feeder.

1

-

-

... More
4-Replacement of Feed Roll Blades of RC Feeder (1 Set = 6 Nos.)

1

-

-

... More
5-Replacement of Feed Roll Spider Assembly of RC Feeder

1

-

-

... More
6-Overhauling including Repair & Replacement of RC Feeder

2

-

-

... More
7-Repair & Replacement of Hing Gate Mechanism Assembly of RC Feeder

1

-

-

... More
8-Repair & Replacement of Hing Gate & Blade Assembly of RC Feeder

1

-

-

... More
9-Replacement(Including Fabrication & Hard facing) of Coal Discharge Chute between RC Feeder and Coal Feed Pipe of Bowll Mill.

1

-

-

... More
JOB PERTAINS TO BOWL MILL:

-

-

-

... More
10-Repair of Converter Head by patch welding and Box up.

1

-

-

... More
11-Replacement of new Converter Head

1

-

-

... More
12-Adjustment of clearance (Gap) between Roller Journal Assembly & Bull Ring and pressure Ring Assembly.

20

-

-

... More
13-Replacement of Roller Journal Assembly

25

-

-

... More
14-Repair & Replacement of Inner Cone

1

-

-

... More
15-Overhauling including Repair & Replacement of Wear Components of Bowll Mill excluding Gear box.

3

-

-

... More
16-Replacement of Worm Shaft Ass'y including blue matching of Worm Shaft & Gear Wheel and alignment.

1

-

-

... More
17-Overhauling of Worm Shaft Assembly

1

-

-

... More
18-Overhauling including Repair & Replacement of complete Bowl Mill.

3

-

-

... More
19-Preventive Maint. of Oil Pump Assembly including lower Bearing Housing.

1

-

-

... More
20-Replacement of scraper Assembly of Bowl Mill.

12

-

-

... More
21-Opening & Boxing up of one segment of Skirt Assembly (for inspection of vertical Shaft & its Upper Guide Bearing)

3

-

-

... More
22-Replacement of Skirt Ass'y(1 No. = 4 segments)

1

-

-

... More
23-Opening & Boxing up of Bibby / Gear Coupling between Bowl Mill and Exhauster or Motor for Inspection.

3

-

-

... More
24-Alignment of Bibby / Gear Coupling between Bowl Mill and Exhauster or Motor.

1

-

-

... More
25-Replacement of coupling including alignment of coupling between Bowl Mill and Exhauster or Motor.

1

-

-

... More
26-Overhauling of Hot Air Gate

1

-

-

... More
27-Replacement of Mill Body Liner for Bowl Mill (Includes removal of old liner by opening of bolt/cutting, surface preparation by welding/grinding, if required and fixing of New Liner)

70

-

-

... More
28-Replacement of Extension Strip in Bowl Mill which includes removal of old strip and welding/positioning of new strip (1 set includes 6 Nos.)

4

-

-

... More
JOB PERTAINS TO EXHAUSTER:

-

-

-

... More
29-Opening & Boxing up of Manhole Cover for Inspection of Exhauster.

1

-

-

... More
30-Opening & Boxing up of Manhole Cover and assistance in balancing.

32

-

-

... More
31-Replacement of periphery Liners # II (below door) of Exhauster (including opening & boxing up of Manhole Cover)

2

-

-

... More
32-Replacement of periphery Liner (door) of Exhauster (including opening & boxing up of Manhole Cover)

4

-

-

... More
33-Replacement of periphery Liners # III (above door) of Exhauster (including opening & boxing up of Manhole Cover)

2

-

-

... More
34-Replacement of periphery Liners # IV (Top) of Exhauster (1 set = 4 Nos.)

1

-

-

... More
35-Replacement of Fan Blades and balancing of Exhauster (1 set = 6 Nos.)

2

-

-

... More
36-Replacement of Whizer Blades and balancing of Exhauster (1 set = 6 Nos.)

1

-

-

... More
37-Replacement of Whizer Disc and balancing.

1

-

-

... More
38-Replacement of Fan Intake pipe of Exhauster.

1

-

-

... More
39-Fabrication & Erection of Fan intake pipe (Rate should be on per meter basis)

2

-

-

... More
40-Replacement of Exhauster suction Elbow alone.

1

-

-

... More
41-Replacement of Discharge Neck of Exhauster alone.

1

-

-

... More
42-Replacement of Stub End Victaulic Coupling of Discharge Neck of Exhauster alone.

1

-

-

... More
43-Replacement of complete ED Valve Assembly including Disc, Shaft, Bushing and Power Cylinder alone.

1

-

-

... More
44-Overhauling of ED Valve Ass'y including repair & replacement of Body, Disc, Shafts & Bushing etc. alone.

1

-

-

... More
45-Overhauling & Replacement of Bearing Housing Assembly of Exhauster alone.

2

-

-

... More
46-Overhauling including Repair & Replacement of Exhauster Ass'y including Bearing Housing, Exhauster Casing & ED Valve Assembly.

2

-

-

... More
47-Overhauling including Repair & Replacement of Exhauster Ass'y.incuding bearing housing but excluding Exhauster Casing and ED Valve Assembly.

1

-

-

... More
48-Overhauling including Repair & Replacement of Exhauster Ass'y. excluding replacement of Bearing Housing Assembly, ED Valve Assembly and Exhauster Casing.

15

-

-

... More
49-Replacement of complete Riffle Element of big Riffle Distributor for Pulverised Fuel.

1

-

-

... More
50-Replacement of big Riffle Distributor Assembly for Pulverised Fuel.

1

-

-

... More
51-Replacement of complete Riffle Element of small Riffle Distributor for Pulverised Fuel.

1

-

-

... More
52-Replacement of small Riffle Distributor Assembly for Pulverised Fuel.

1

-

-

... More
53-Replacement of Motor of Bowl Mill

1

-

-

... More
54-Replacement of Extension Ring & Strip

1

-

-

... More
55-Replacement of intermediate/ deflector/ deflector body-Liner

1

-

-

... More
56-Replacement of spring Assy.

1

-

-

... More
57-Replacement of Jack bolt

1

-

-

... More
58-Replacement of Ash water Pump in SGP including alignment

1

-

-

... More
59-Replacement of Bearing of Ash Water Pump in SGP which includes matching of Bearing surface with shaft.

1

-

-

... More
60-Replacement of flange segment for exhauster(removed by cutting alinging&refixing in position by welding on both sides.

1

-

-

... More
Annexure - XXI

-

-

-

... More
A-MAINTENANCE OF ASH DISPOSAL LINE TO ASH POND

-

-

-

... More
1-Replacement(Including Repair) of 12" dia Motor Operated Knife Edge Gate Valve (KEGV).

1

-

-

... More
2-Replacement of Knife Edge Gate of 12 inch dia Motor Operated Knife Edge Gate Valve.

1

-

-

... More
3-Opening & Boxing up of 12" dia spool piece in the suction line of Ash Slurry Pump.

1

-

-

... More
4-Opening & Boxing up of 12" x 10" dia Reducer in the suction line of Ash Slurry Pump.

1

-

-

... More
5-Opening & Boxing up of 12" NB 150# Flange Pipe Sleeve Coupling (including replacement of Coupling Gasket)

1

-

-

... More
6-Replacement of 12 Inch dia 150# Pipe Sleeve Coupling.

1

-

-

... More
7-Replacement(Including Repair) of 12" NB 45 Degree C.I. Elbow.

1

-

-

... More
8-Replacement(Including Repair) of 12" NB 45 Degree C.I. Offset Elbow ('S' Elbow)

1

-

-

... More
9-Replacement(Including Repair) of 12" NB 90 Degree C.I. Elbow.

1

-

-

... More
10-Replacement(Including Repair) of 12" NB 45 Degree C.I. Letral.

1

-

-

... More
11-Replacement of 12" Sch-40 pipe line (Including Opening & Boxing up of End Connections etc)

1

-

-

... More
12-Opening & Boxing up of 14" NB 150# Pipe Sleeve Coupling (including replacement of Coupling Gasket).

1

-

-

... More
13-Replacement of 14" dia 150# Pipe Sleeve Coupling.

1

-

-

... More
14-Replacement(Including Repair) of 14" NB 45 Degree C.I. Elbow.

1

-

-

... More
15-Replacement(Including Repair) of 14" NB 90 Degree C.I. Elbow.

1

-

-

... More
16-Replacement of 14" NB Sch-40 pipe line (including opening & boxing up of End Connections etc.)

1

-

-

... More
17-Erection of 14" NB Sch-40 pipe line (including opening & boxing up of End Connections etc.)

1

-

-

... More
18-Replacement of Motor of Ash Slurry Pump

1

-

-

... More
19-Removal & re-fixing of slip plate Ash disposal line out side the Pump house tee in old/new line.

1

-

-

... More
20-Replacement of gasket of 12" dia Ash disposal line.

1

-

-

... More
Annexure-XXII

-

-

-

... More
A-Jobs pertains to Cooling Tower

-

-

-

... More
1-Opening & boxing up of sump striner of cooling towers for inspection

45

-

-

... More
B-Jobs Pertains to Sulphur Bentonite plant

-

-

-

... More
1-BF-02 filter replacement of size 200NB

52

-

-

... More
2-Replacement of Gear Pumps

20

-

-

... More
3-Overhauling of Gear Pumps

16

-

-

... More
4-Stainless steel belt jointing job (1 mm thickness)

-

-

-

... More
a-Cracks jointing job

4

-

-

... More
b-Patch  jointing job

2

-

-

... More
c-Cracks jointing job

5

-

-

... More
d-Patch  jointing job

5

-

-

... More
C-Jobs Pertaining to GTG-HRSG Plant

-

-

-

... More
1-NG filter element replacement of size 12”, 300#

1

-

-

... More
2-GTG Air Intake Filter Replacement.

1

-

-

... More
Annexure-XXIII

-

-

-

... More
Various Plant Jobs:

-

-

-

... More
To assist NFL Employee in executing various Mechanical Maintenance Jobs in routine day to day maintenance in general shift & Plant shift.

-

-

-

... More
A-Ammonia Plant

-

-

-

... More
1-Reformer Area AFC Plant

260

-

-

... More
2-CO Area AFC Plant

265

-

-

... More
3-Compressor House, ARU, Synthesis Section, ASU NWU & Argon Plant

270

-

-

... More
4-Ammonia Plant rotating shift

270

-

-

... More
B-Off Sites & Utilities:

-

-

-

... More
1-DM Plant, Cooling Towers, Air Compressor

355

-

-

... More
2-Effluent Treatment Plant, Methanol Storage Area

195

-

-

... More
3-Raw Water Plant and final Pond

285

-

-

... More
4-Sulphur Bentonite plant

850

-

-

... More
C-SMC

-

-

-

... More
1-GTG-HRSG plant & Ashing section

120

-

-

... More
2-Steam Generation Plant

450

-

-

... More
3-Material Handling Plant

7

-

-

... More
D-Urea Plant

-

-

-

... More
1-Compressor House, Ammonia Feed Pump, R & D Section

290

-

-

... More
2-Centrifuge House, Cristalyser Section Priling Tower, Melter, Distributors, CFD etc.

260

-

-

... More
3-Conveyors, Stitching Machines, Stitching Station etc.

205

-

-

... More
Annexure-XXIV

-

-

-

... More
A-New Ammonia plant jobs

-

-

-

... More
1-XP 301 strainer opening/ box-up

1

-

-

... More
2-P 301 pump strainer opening/box-up

1

-

-

... More
3-IAD filter replacement

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.