National Fertilizers Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

National Fertilizers Limited - NFL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Jul 2024
Closing Date6 Aug 2024
Tender Amount₹ 59,40,250 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hardener HY - 840 / K-46

500

-

-

... More
Hardener HY - 850 / K-42

550

-

-

... More
Quartz Sand grade mix No. 10

20000

-

-

... More
Epoxy painting with Araldite and Hardners on Concrete / Plastered /Metal surfaces in the All Area of Prilling Tower or any Plant at anyHorizontal / Vertical Locations at all heights and depths with allnecessary useful Tools, scafolding / staging for safe and properexecution of work as per instruction of Engineer-in-Charge.(Payment for cost of Araldite and Hardeners shall be made forseparately vide item No. 1 of Material Part)

-

-

-

... More
A) Araldite GY-250 : Hardner HY - 830 : Hardner HY - 850 =100 PBW : 45 PBW : 15 PBW ( PBW = Parts By Weight)

4000

-

-

... More
Two Coat-Ist Coat - Primer-Araldite GY-250 : Hardner HY - 840 =100 PBW : 50 PBW : ( PBW = Parts By Weight)-II nd Coat - Painting -Araldite GY-250 : Hardner HY - 830 : Hardner HY - 850 =100 PBW : 45 PBW : 15 PBW ( PBW = Parts By Weight)

1000

-

-

... More
Repairing the damaged concrete / plastered /other surfaces withprimer followed by epoxy Mortar / putty prepared by mixing Araldite,Hardners, Quartz sand, in the areas of Urea Plant, Prill Tower, DMPlant, Bagging Plant or any Plant & at Horizontal / Vertical locationsat all heights and depths with all necessary Useful tools scafolding /staging for safe and proper execution of work as per instruction ofEngineer-in-Charge.(Payment for cost of Araldite, Hardeners and Quartz sand shall bemade for separately vide item No. 1 of Material Part)Araldite GY-250 : Hardner HY - 830 : Hardner HY - 850 :Quartz Sand No. 10100 PBW : 45 PBW :15 PBW : 800 PBW (PBW = Parts By Weight)

3000

-

-

... More
Laying 5 mm average thickness ( i.e 3 mm to 7 mm thick) epoxyscreeding with Araldite and Hardners on Concrete / Plastered /surfaces in the areas of DM Plant, or at any other location(s), atHorizontal / Vertical locations at all heights and depths with allnecessary materials ,tools & plants , scafolding /staging, as perenclosed Technical Specifications and special conditions of thecontract and as per following formulations : Primer followerd byScreeding of patches and sealed by seal coat of Epoxy with requiredformulationmade for separately vide item No. 1 of Material Part)Primer Coat :Araldite GY- 250 : Hardner HY - 840 =100 PBW : 50 PBW : (PBW = Parts By Weight)Screeding :Araldite GY-250 : Hardner HY - 830 : Hardner HY - 850 :Quartz Sand No. 10100 PBW : 45 PBW : 15 PBW : 800 PBW ( PBW = Parts By Weight)Final CoatAraldite GY-250 : Hardner HY - 830 : Hardner HY - 850 =Araldite GY-250 : Hardner HY - 830 : Hardner HY - 850 =100 PBW : 45 PBW : 15 PBW ( PBW = Parts By Weight)

2000

-

-

... More
Dismantling of existing damaged Epoxy screeding / plaster, oldEpoxy Coating from the Concrete / Plastered / surfaces in thevarious areas of NFL Plant, or at anyother location(s), atHorizontal / Vertical locations at all heights and depths , preparingthe areas to receive fresh treatment, with all necessary tools &tackels , scafolding / staging, including collection of dismentalledmaterials and disposal of the same in disposal yards locatedwithin Factory area as per instruction of Engineer-in-Charge.

5000

-

-

... More
Providing and laying Acid Resistant Tile on Floor/Walls/Drains orat any required location in plant area by using 228 mm x 114 mmx 38 mm size Acid Resistant Tile Class-1 conforming to IS: 4860with one priming Coat of epoxy primer with 6 mm or more thickbed of epoxy quartz mortar to make proper slope and painting ofjoints with solvent free epoxy paint as per enclosed technicalspecifications. The rate shall include for surface prepration,dismentailing of existing / damaged floor Providing & Fixing Tilewith mortar and disposal of debris to dump yard in factory area.(Note- All Material for Item no-5 i.e- Acid Resistant Tile, Epoxy Mortar,Quartz Sand and other material etc shall be arrange by Contractor forexecution of said item at is own cost)

300

-

-

... More
Note: (1) GST shall be paid extra as per NIT. (2) Bidders may take care of Clause No. 6.0 of GTC & 1.8.0 of STC while quoting the Rates. (3) Bidders must read all the Clauses of STC and Scope of work before quoting rates.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.