Directorate Of Urban Local Bodies Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 16,000Document Cost
₹ 1,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRY_421268_1Bid Award Id
ViewTender No
2025ED869397 3DEF 4B81 B963 3BF27CAB6AAD318ULBTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://https://ulbharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
HSR Item 4.14.1-Earth work in excavation by mechanical
means (Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on
plan), including dressing of sides and ramming of bottoms, lift
up to 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of
50 m. 1. All kinds of soil.
HSR Rate(Rs.) 83.00 Through Rate
70.79
83
5875.57
... More
HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2.
Cement Concrete 1:8:16 with stone aggregate 40 mm size in
foundation and plinth.
HSR Rate(Rs.) 1863.00 Through Rate
7.51
1863
13991.13
... More
HSR Item 7.21.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation and
plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)
HSR Rate(Rs.) 3968.00 Through Rate
9.97
3968
39560.96
... More
HSR Item 7.22.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructure
above plinth level up to floor IV level in all shapes and sizes in
: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)
HSR Rate(Rs.) 4488.00 Through Rate
26.38
4488
118393.44
... More
HSR Item 11.5.3-12 mm cement plaster of mix : 3. 1:4 (1
cement: 4 fine sand) HSR Rate(Rs.) 113.00 Through Rate
114.68
113
12958.84
... More
HSR Item 12.158.1-Providing and fixing 12 mm thick
prelaminated particle board flat pressed three layer or graded
wood particle board conforming to IS: 12823 Grade l Type ll,
in panelling fixed in aluminium doors, windows shutters and
partition frames with C.P. brass / stainless steel screws etc.
complete as per architectural drawings and directions of
engineer-in-charge. 1. Pre-laminated particle board with
decorative lamination on one side and balancing lamination
on other side HSR Rate(Rs.) 747.00 Through Rate
5.55
747
4145.85
... More
HSR Item 5.7.4-Demolishing brick work manually/ by
mechanical means including stacking of serviceable material
and disposal of unserviceable material within 50 metres lead
as per direction of Engineer-in-charge. 4. In cement mortar
HSR Rate(Rs.) 585.00 Through Rate
3.73
585
2182.05
... More
HSR Item 12.144.2-Providing and fixing to existing door
frames. 2. 30 mm thick Fibreglass Reinforced Plastic (F.R.P.)
flush door shutter in different plain and wood finish made with
fire retardant grade unsaturated polyester resin, moulded to 3
mm thick FRP laminate all around, with suitable wooden
blocks inside at required places for fixing of fittings and
polyurethane foam (PUF)/Polystyrene foam to be used as
filler material throughout the hollow panel, casted
monolithically with testing parameters of F.R.P. laminate
conforming to table - 3 of IS: 14856, complete as per direction
of Engineer-in-charge. HSR Rate(Rs.) 3253.00 Through Rate
5.55
3253
18054.15
... More
HSR Item 11.6.2-15 mm cement plaster on the rough side of
single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand)
HSR Rate(Rs.) 127.00 Through Rate
114.68
127
14564.36
... More
HSR Item 6.15.1-Reinforced cement concrete work in walls
(any thickness), including attached pilasters, buttresses, plinth
and string courses, fillets, columns, pillars, piers, abutments,
posts and struts etc. above plinth level up to floor four level,
excluding cost of centering, shuttering, finishing and
reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-
III) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 5969.00 Through Rate
20.2
5969
120573.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements