Directorate Of Urban Local Bodies Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 3,260Document Cost
₹ 1,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRY_408440_1Bid Award Id
ViewTender No
2024FA6DB5C8 62E9 487D A10E 3BF611D168DF330ULBTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://https://ulbharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
HSR Item 17.70 -Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3.
136.17
26
3540.42
HSR Item 6.14.1 -Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :
1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
0.61
4374
2668.14
HSR Item 6.33.3 -Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position,
binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note:
Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps,
couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these
items shall be deemed to be included in the rates for reinforcement.
3. Cold twisted bars
80
68
5440
HSR Item 4.33-Excavating, supplying and filling of local earth
(including royalty) by mechanical transport up to a lead of 1
km also including ramming and watering of the earth in layers
not exceeding 20 cm in trenches, plinth, sides of foundation
etc. complete
32.36
138
4465.68
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements