Maharshi Dayanand University Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 32,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HRY_81619_1Bid Award Id
ViewTender No
MDU/EE/2019/E.I/07Tender Authority
Maharshi Dayanand University ViewPurchaser Address
-Website
http://https://mdu.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Running capacitor Aluminium cap 36 Mfd. “Epcos/GC/Tibcon" make
12
-
-
Running capacitor Aluminium cap 6/36 Mfd. ''Epcos/GC/Tibcon" make
12
-
-
Running capacitor Aluminium cap 40 Mfd. ''Epcos/GC/Tibcon" make
60
-
-
Running capacitor Aluminium cap 45 Mfd. ''Epcos/GC/Tibcon" make
60
-
-
Running capacitor Aluminium cap 50 Mfd. ''Epcos/GC/Tibcon" make
60
-
-
Starting relay 1022/1622 ‘Microtek’ / ‘Annapurna’ make
6
-
-
Air filter for 1.5/2.0 ton window / split AC
12
-
-
New compressor hermetic (reciprocating) 1.5 ton ‘Emerson’ / ‘THK’ / make with one year guarantee. Old scrap compressor should not be retained by department. So rates will be quoted by discounting the cost of old compressor.
3
-
-
New compressor hermetic (reciprocating) 2.0 ton ‘Emerson’ / ‘THK’ / make with one year guarantee. Old scrap compressor should not be retained by department. So rates will be quoted by discounting the cost of old compressor.
6
-
-
New compressor rotary 1.5 ton ‘Highly’ / ‘Hitachi’ make with one year guarantee. Old scrap compressor should not be retained by department. So rates will be quoted by discounting the cost of old compressor.
6
-
-
New compressor rotary 2.0 ton ‘Highly’ / ‘Hitachi’ make with one year guarantee. Old scrap compressor should not be retained by department. So rates will be quoted by discounting the cost of old compressor.
12
-
-
Main lead of A/C three core 4.0 sqmm copper wire ‘Havells’/ ‘Polycab’ make
120
-
-
New fan motor for window / split AC 1.5/2.0 ton copper wound make and model as per existing installed AC with one year guarantee. Old scrap fan motor should not be retained by department. So rates will be quoted by discounting the cost of old fan motor.
12
-
-
Selector switch for 1.5 / 2.0 ton window A/C make and model as per existing installed AC.
6
-
-
Thermostat for 1.5 / 2.0 ton AC ‘Danfoss’ / ‘Annapurna’ make with one year guarantee.
6
-
-
2 MFD condenser for fan motor ‘Epcos’ / ‘GC’ / ‘Tibcon’ make
24
-
-
4 MFD condenser for fan motor ‘Epcos’ / ‘GC’ / ‘Tibcon’ make
24
-
-
6 MFD condenser for fan motor‘Epcos’ / ‘GC’ / ‘Tibcon’ make
24
-
-
Remote for existing 1.5 / 2.0 ton window / split AC make ‘Blue Star’ / ‘Hitachi’ / ‘Voltas’ / .Samsung’
6
-
-
Selector switch knob for window type AC model as per existing installed AC.
12
-
-
Rubber gutka and rubber ring / rubber ring iron clamp model as per requirement for holding fan motor (12+12+12 )
43
-
-
Bearing for AC fan motor ‘NBC’ / ‘SKF’ make as per requirement of existing installed AC.
60
-
-
Steel shaft for AC fan motor make and model as per requirement of existing installed AC.
24
-
-
Bush gun metal for AC fan motor as per existing model of motor.
36
-
-
Stud for AC fan motor as per existing fan motor.
33
-
-
Connector 32 Amp for AC voltage stabilizer three pin in bakelite.
36
-
-
Pencil cell for AC Remote
120
-
-
Copper pipe heavy 5/8” ‘Mandev’ make (50 ft. length each coil)
120
-
-
Copper pipe heavy ¼” ‘Mandev’ make. (50 ft. length each coil)
120
-
-
Copper pipe heavy 3/8” ‘Mandev’ make.(50 ft. length each coil)
120
-
-
Copper pipe heavy ½” ‘Mandev’ make (50 ft. length each coil)
120
-
-
Insulation rubber pipe for covering copper pipe (5/8+ ¼) ‘Malayasia’ make
240
-
-
Flair nut brass 5/8”
24
-
-
Flair nut brass 1/4”
48
-
-
Flair nut brass 3/8”
24
-
-
Flair nut brass 1/2”
24
-
-
Flair nut brass 1”
12
-
-
Dead nut brass ¼”
120
-
-
PVC drain pipe flexible ‘Rajdoot’/ ‘Finolex’/ ‘Supreme’ / ‘Kasta’ make size 1/2''
300
-
-
1” PVC pipe for AC drain ‘Finolex’ / ‘Supreme’ / ‘Kasta’ make
600
-
-
1” PVC elbow for AC drain pipe socket
60
-
-
1” PVC bend for AC drain pipe
60
-
-
Copper thimble 32 Amp silver coated (100 piece in one Pkt.) (vertical + horizontal)
5
-
-
Teflon tape.
33
-
-
Fan blower for window AC 1.5/2.0 ton make and model as per requirement of existing installed AC.
24
-
-
Fan blower for split AC indoor 1.5/2.0 ton make and model as per requirement of existing installed AC.
12
-
-
Fan blade window / split AC 1.5/2.0 ton make and model, as per requirement of existing installed AC.
30
-
-
Split AC outdoor stand powder coated
120
-
-
Split AC outdoor fan motor stand make and model as per requirement of existing installed AC.
12
-
-
Split AC outdoor safety net jaal of stainless steel in front of fan blade side make and model as per requirement of existing installed AC. size 2x2 feet
60
-
-
Contactor single phase 32 Amp for split AC outdoor unit ‘Siemens’ / ‘C&S’ / ‘ABB’ make
60
-
-
New PCB window AC 1.5/2.0 ton make and model as per requirement of existing installed AC.
6
-
-
New PCB split AC 1.5/2.0 ton make and model as per requirement of existing installed AC.
6
-
-
New PCB inverter split AC 1.5/2.0 ton indoor make and model as per requirement of existing installed AC.
6
-
-
New PCB inverter split AC 1.5/2.0 ton outdoor make and model as per requirement of existing installed AC.
6
-
-
M S saddle for 1” pipe
240
-
-
PVC flexible pipe 2 ½” ‘Rajdoot’ make
60
-
-
MS saddle for 2 ½” pipe
60
-
-
Contactor 3 phase 32 Amp for ductable unit make and model as per requirement of existing installed AC ‘Siemens’ / ‘C&S’ / ‘ABB’ make
24
-
-
Fan blade 22” aluminium for package ductable unit 5/11 ton make and model material as per requirement of existing installed packaged unit i.e. Bluestar, Hitachi.
16
-
-
Refilling of R22 gas 'Mafron' make in existing cylinder provided by the department.
96
-
-
Refilling of R410 gas 'Mafron' make in existing cylinder provided by the department.
48
-
-
Refilling of R407 gas 'Mafron' make in existing cylinder provided by the department.
60
-
-
Refilling of Nitrogen gas in existing cylinder provided by the department.(capacity of existing cylinder is 7 cubic meter)
5
-
-
Refilling of Oxygen gas in existing cylinder provided by the department.(capacity of existing cylinder is 7 cubic meter)
12
-
-
Copper welding rod
2
-
-
Valve 3/8” brass
24
-
-
Valve 5/8” brass
36
-
-
Valve 1/4” brass
48
-
-
Valve 1/2” brass
24
-
-
Running condenser 60 Mfd aluminium cap ‘Tibcon’ / ‘GC’ / ‘Epcos’ make
60
-
-
10 Mfd capacitor aluminium cap ‘Tibcon’ / ‘GC’ / ‘Epcos’ make
24
-
-
Elbow copper 1”
24
-
-
Socket copper 1”
12
-
-
Elbow copper ¾”
12
-
-
PVC gitti 40 mm per pkt. 100 pieces
12
-
-
Screw 3/8” rate per pkt. 100 piece
6
-
-
PVC cable tie 200 mm (100 pieces in each packet)
3
-
-
PVC cable tie 250 mm(100 pieces in each packet)
3
-
-
M Seal (50 gm packet)
12
-
-
Coil shiner (1 litre packing)
6
-
-
Steel screw ½”, ¾” full threading
6
-
-
Copper cooling coil for window AC 1.5 ton as per requirement of existing installed AC. Old scrap cooling coil should not be retained by department. So rates will be quoted by discounting the cost of old cooling coil.
4
-
-
Copper cooling coil for window AC 2.0 ton as per requirement of existing installed AC. Old scrap cooling coil should not be retained by department. So rates will be quoted by discounting the cost of old cooling coil.
3
-
-
Copper cooling coil for split AC 1.5 ton as per requirement of existing installed AC. Old scrap cooling coil should not be retained by department. So rates will be quoted by discounting the cost of old cooling coil.
3
-
-
Copper cooling coil for split AC 2.0 ton as per requirement of existing installed AC. Old scrap cooling coil should not be retained by department. So rates will be quoted by discounting the cost of old cooling coil.
3
-
-
Copper condenser coil for split AC 2.0 ton outdoor unit as per requirement of existing installed AC. Old scrap condenser coil should not be retained by department. So rates will be quoted by discounting the cost of old condenser coil.
5
-
-
Copper condenser coil for split AC 1.5 ton outdoor unit as per requirement of existing installed AC. Old scrap condenser coil should not be retained by department. So rates will be quoted by discounting the cost of old condenser coil.
3
-
-
Scroll compressor 1.5 ton as per requirement of existing installed AC. Old scrap Scroll compressor should not be retained by department. So rates will be quoted by discounting the cost of old Scroll compressor.
5
-
-
Scroll compressor 2.0 ton as per requirement of existing installed AC. Old scrap Scroll compressor should not be retained by department. So rates will be quoted by discounting the cost of old Scroll compressor.
6
-
-
New DC fan motor
6
-
-
Fastener 4’’
240
-
-
LPG cane portable gas cartridge
60
-
-
PCB 5.8 ton 3 phase 'Blue Star', 'Voltas' make Old scrap of PCB should not be retained by department. So rates will be quoted by discounting the cost of old PCB
2
-
-
0.55 capillary copper tube
60
-
-
A.C. copper filter and driers 2 way 3/8" size
15
-
-
Packing tape 2" size
24
-
-
PVC clamp / saddle 10 mm size
6
-
-
Compressor for 5.8 ton ductable unit Old scrap of compressor should not be retained by department. So rates will be quoted by discounting the cost of old compressor
1
-
-
Fan motor for 5-8 ton ductable unit. Old scrap of fan motor should not be retained by department. So rates will be quoted by discounting the cost of old fan motor
1
-
-
Fan belt A32 for ductable unit 5-8 ton
6
-
-
Three pin top 16 amp. 'Anckor'/'SSK' make
60
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements