Lala Lajpat Rai University Of Veterinary And Animal Sciences Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Lala Lajpat Rai University Of Veterinary And Animal Sciences - LUVAS Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date15 Jan 2022
Closing Date7 Feb 2022
Tender Amount₹ 41,79,804 
Notes
Download

Costs

  • EMD

    ₹ 89,200
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and stacking of good quality top layer garden earth free from debris and weeds, at site including royalty and carriage/lead 5 km (good earth measured in stacks will be reduced by 20 % for payment) only for filling of pots and flower beds 26.2

210

-

338

... More
Supplying at site of work well-decayed farm-yard manure from any available source, approved by the Engineer-incharge including Screening through sieve of LS.designation 16 mm with 5 km lead and supply of good earth making mixture in ratio of 1 :2 26.3.1

100

-

478

... More
Surface dressing of ground including removing rank vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m in all kind of soils . 26.4.2

5000

-

14

... More
clearing jungle manually including uprooting rank vegetation , grass, woody vegetation up to 30cm girth measured at height 1 m above ground level and removal of rubbish up to a distance of 50 m out side the periphery of the area cleared 26.4.3

5000

-

7

... More
Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 1 o to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. 26.4.8

2000

-

40

... More
Trenching in all kinds of soil up to a depth of 60 cm including removal and stacking of serviceable MATERIALs and then disposing of by spreading and neatly levelling with in a lead of 50 metres and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/an farm-yard manure before and after flooding trench with water (excluding cost of imported earth and sludge or farm-yard manure) 26.4.9

100

-

51

... More
Rough dressing the trenched ground including breaking clods. 26.4.10

1000

-

1

... More
Fine dressing the ground 26.4.12

20000

-

2

... More
Making lawns with rough grassing including uprooting rank vegetation and weeds by digging area to a depth of 30 cm , removing all weeds and other growth with roots by forking repeatedly, ploughing and dragging with 'swagha' breaking of clods, removal of rubbish, dressing and supplying doob grass roots, and planting at 15 cm apart, including supplying and spreading of farm-yard manure at the rate of 0.18 cum per 100 sqm fertilizers etc 26.5

10000

-

14

... More
Maintenance of rough grassing, including 50 gm DAP and 50 gm per sqm Urea fertilizer application , watering and mowing etc for a period of per year one year. 26.6

5000

-

19

... More
Grassing of play grounds with doob grass including uprooting rank vegetation and weeds by digging area to a depth of 30 cm , removing all weeds and other growth with roots by forking repeatedly, ploughing and dragging with 'swagha' breaking of clods, removal of rubbish, dressing and supplying doob grass roots, and planting at 10 cm apart in both directions , watering weeding including supplying and spreading of farm-yard manure at the rate of 0.18 cum per 100 sqm fertilizers DAP 50 g per sqm etc and maintenance till weed free turf is formed 26.7

1000

-

24

... More
Providing and fixing Selection no. 1 grass turf with earth 50mm to 60mm thickness and ramming with required wooden tools, rolling with light roller to make the surface

2000

-

112

... More
Maintenance of fine grass lawn for one year including fertilizer application, DAP @ 20gm/sqm, urea 40gm/sqm, watering, weeding, top dressing with good earth and manure mixture 2:1 @ 0.01cum per sqm, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads

1000

-

50

... More
Weeding out of lawn, where weeds are up to 50%, by removal of all weeds and other wild growth with roots by forking including disposal of garden rubbish with all leads and lifts complete.

2000

-

13

... More
Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) Hole 1.2 metre dia and 1.2 metre deep

2600

-

65

... More
Digging of pits in all kinds of soil & refilling the same, with the excavated earth mixed with well decayed farm yard manure @ 30% of pit volume and insecticide for termite control ( Excluding cost of FYM and Insecticide.) 26.13.6

200

-

71

... More
Maintenance of tree for one year for the 1st three years each of age including weeding, hoeing , plant protection , watering from Deptt. source , application of 1 O ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc. 26.15.1

1000

-

438

... More
Pruning, trimming, shaping of mature trees /shrubs (ht 15 feet and each above) including removal and disposal of cut materials up to 50m lead. 26.16

1000

-

50

... More
Stacking of Trees Providing and fixing single stack for a tree with bamboo 38 mm dia, 2.40 m long including rope, wire etc. 26.17.1

500

-

84

... More
Three point guying of large palms and trees with coir ropes and stacking with 30 mm dia 2.40 m long bamboo 26.17.3

400

-

142

... More
Maintenance of shrub for one year including weeding, hoeing, plant protection, watering from Deptt. source, application of 1 O ml chlorpyriphos four times in a year , 0.0289cum FYM each, 20 gm urea and 20 gm DAP twice, replacement of casualty etc. with same species and same age of plant Individual shrubs 26.19.1

400

-

325

... More
Supply and Planting rare and specimen tree plants in already each prepared pits (Ficus starlight 150 cm height , Terminalia 210 cm height, menatalis , Michelia champaca hybrid more than 180 cm height, Cyprus (Golden juniperous) more than 180 cm height, topiary of 1 O to 12 no. well trimmed bolls of more than 30cm size of Ficus nuda, Ficus retusa, Ficus long island , Ficus panda more than 180 cm height, Golden bottle brush , casurina equistefolia , Bottle palm with stem circumference at base more than 40cm ,Washingtonia palm of healthy clear stem height below leaf more Thant 90 cm) including , fertilizer and insecticides chlorpyriphos 20 ml per pit, planting of 180cm to 210cm tall sapling in position and flooding with water .specie of plant will be decided by engineer in charge. 26.20

171

-

1119

... More
Planting seasonal flower in beds Supply and planting flower beds including digging 30 cm deep bed and refilling of beds with excavated soil and FYM 0.0508 cum per sqm , Fertilizer DAP 50 gms and insecticides chlorpyriphos 10 ml per sqm , planting of F1 hybrid flower saplings to be supplied in tray pots / thumb pots at 20 cm distance from plant to plant and row to row minimum 25 no . plants per sqm 26.22.1

517

-

238

... More
Planting flower beds including digging 30 cm deep bed and refilling of beds with excavated soil and FYM 0.0508 cum per sqm , Fertilizer DAP 50 gms and insecticides chlorpyriphos 10ml per sqm , planting of F1 hybrid well bloomed flower saplings to be supplied in polybags at 25cm distance from plant to plant and row to row minimum 15 no . plants per sqm

540

-

705

... More
Maintenance of ground cover plants for one year including application of FYM 0.0508 cum , insecticide 10ml, fertilizer 20 gm ,per sqm, replacement of casualty with same specie of plant and all horticultural practices. 26.27

500

-

202

... More
Planting permanent hedges including digging of trenches, 60 cm sqm wide and 45 cm deep, refilling the excavated earth, mixed with farmyard manure, supplied at the rate of 1.62 cum per 18 sqm, DAP 0.6kg, Chlorpyriphos 20%EC@ 0.20 litre per 18 sqm and supplying and planting hedge at 30 cm apart in two rows @ 202 no. well trimmed bushy ,multi-branched ,30 cm to 45 cm in height plants to be supplied in 15 cm x 15 cm poly bags per 18 sqm 26.34

1500

-

258

... More
Watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 No. Tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/per plant 27 no irrigations per year , lawn 2.5 cm layer or 25 litre/sqm 50 no irrigations per year , ground cover I flower bed / rose bed 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , hedge for 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , Pot plant 3 litre water daily 250 irrigations per year 26.53

1500

-

525

... More
Providing and displaying of Areca Palm plant, having ht. 1.95 m to 2.40 m with 12 to 14 suckers, well developed, fresh and healthy with lush green foliage in 35 cm size of Bucket type cement pots & as per direction of the officer-in-charge. 26.105

300

-

747

... More
Providing and displaying of Seaforthia Palm plant, having ht. 1.50 m to 1.80 m with 12-15 suckers, well developed, fresh and healthy lush green leaves from bottom to top in 30 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge. 26.166

200

-

640

... More
Fertilizer urea H0019

5

-

560

... More
Vermi compost manure H0030

5

-

500

... More
Coco peat H0031

50

-

25

... More
Murate of Potash H0034

50

-

18

... More
DAP H00318

2

-

2300



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.