Irrigation And Water Resources Department Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 2,92,950Document Cost
₹ 15,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRY_439337_1Tender No
202598CEE017 4AED 4E8D 8B96 79B6D709566D150IRRTender Authority
Irrigation And Water Resources Department ViewPurchaser Address
-Website
http://https://hid.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
63553.43
78
4957167.54
... More
[4.16.1.4]Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 1.4. Pipes, cables etc, exceeding 600 mm dia but not exceeding 900 mm dia. [Through Rate]
2493.02
211
526027.22
... More
[5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate]
536.8
1287
690861.6
... More
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
455.2
3476
1582275.2
... More
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate]
285.06
2911
829809.66
... More
[6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. [Through Rate]
15.84
282
4466.88
... More
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
550
66
36300
... More
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
117.29
4128
484181.33
... More
[7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
39.01
4346
169572.1
Evaluation Notes How It Works ?