Irrigation And Water Resources Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Irrigation And Water Resources Department - GoH Tender

Works
Eprocure
Opening Date29 May 2021
Closing Date3 Jun 2021
Tender Amount₹ 20,45,000 
Notes
Download

Costs

  • EMD

    ₹ 40,900
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling brick work, Tile masonry or Tile lining and Tile Terracing in cement complete in all respect as per direction of Engineer-in-Charge. HSR item No. 8.5 (b)

19.19

-

-

... More
Dismantling road including soling and wearing coat, screening and stacking of old serviceable material, complete in all respect as per direction of Engineer-in-Charge. HSR item 24.37

39.44

-

-

... More
Earth work excavation in all kind of soil including breaking of clods with all lead, lifts & other allowances if any including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item 6.2 (b) + (c ), i,ii,iii + 6.3 (i)

587.65

-

-

... More
Extra for compaction for laying earth in 25 cm layer including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.6.2 (g), (i,ii)- 6.3 (i)+6.2 (g), (v)

587.65

-

-

... More
Earth work excavation in Foundation, Trenches etc. in all kind of soils, not exceeding 2 mtrs. Depth including dressing of bottom and sides of trenches etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 6.6

845.04

-

-

... More
Shuttering for faces of concrete foundation and foundation beams (vertical or battering) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item 9.13

152.87

-

-

... More
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-15 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P. cement content 240 kg Per cum including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.(10.64-10.79+10.41)

160.63

-

-

... More
Ist Class brick work laid in C:M 1:3 in F&P including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item No. 11.5

147.9

-

-

... More
RCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 10.66

70.27

-

-

... More
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.(10.66-10.79+10.41)

12.14

-

-

... More
Centering & Shuttering of faces of wall partitions, retaining walls, well staining and the like (vertical or battering) including attached pilasters, buttresses etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 9.5

80.66

-

-

... More
Centring and shuttering for main slab Culverts including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.9.18 (b)

71.86

-

-

... More
Providing & fixing PVC rain water pipe 6 Kg. pressure of ISI mark in cement mortar during masonry work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 13.89 (a)

15.24

-

-

... More
Providing & fixing PVC rain water pipe 6 Kg. pressure of ISI mark in cement mortar during masonry work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 13.89 (b) (150 mm dia PVC pipe)

2.37

-

-

... More
Rehandling of earth work with all lead, lift & other allowances (If any) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR Chapter-6 (Note-II).

587.65

-

-

... More
Fe-500 EQ TMT steel bars RCC work where not included in the complete rate of RCC including bending, binding and placing in position including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. (HSR item No.18.22)

54.19

-

-

... More
Providing expansion joint remolded joint filler 20 mm wide including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 24.35 (b)

990.31

-

-

... More
Filling sand behind the structure with all lead, lift & other allowances (If any) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (NS Item).

98.26

-

-

... More
Dry brick on edge paving sand grounted over 50mm thick earth mud plaster including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No 14.20.

185.8

-

-

... More
Striking joints in cement on brick and tile work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR 15.69 (a)

70.46

-

-

... More
Laying of dry brick bats including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item No 10.116

1.19

-

-

... More
Dismantling of dry brick on edge complete in all respect as per direction of Engineer-in-Charge. HSR item No. 8.5 (i)

22.64

-

-

... More
Preparation of plastered or concrete surfaces for painting, including sand papering the surface, applying once coat of linseed oil and filling with approved quality filler, consisting of white lead, linseed oil, varnish and chalk mitti including finishing surface to the required finish, complete including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item No.16.24

46.21

-

-

... More
Applying priming coat with cement primer in all shades on newaly plastered including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.16.25)

46.21

-

-

... More
Painting two coats with ready mixed exterior paint in all shades including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (HSR item No. 16.26)

46.21

-

-

... More
Supply & fixing sign board including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (N.S.Item)

2

-

-

... More
Credit of material:- (i) Old Steel

4.54

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.