Irrigation And Water Resources Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Irrigation And Water Resources Department - GoH Tender

Works
Eprocure
Opening Date20 Mar 2019
Closing Date24 Apr 2020
Tender Amount₹ 12,99,275 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 13,000
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Re-Construction of V.R.Bridge at RD 280 of Gudhrana Link Drain
Re-Construction of V.R.Bridge at RD 280 of Gudhrana Link Drain
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work excavation in all kind of soil with an average lead of 22.5 mtr for making road ramp.

577.15

-

-

... More
Earth Work excavation in all kind of soils in foundation and trenches (HSR Item No. 6.6).

113.49

-

-

... More
Re-handling of earth as per HSR Note II.

207.49

-

-

... More
Earth work excavation in all kind of soil with lead of 495 mtr(HSR item 6.2 C)

361.86

-

-

... More
Earth Work excavation in all kind of soil with a lead of 15 mtr.

180.95

-

-

... More
Dry brick on edge paving sand grouted over 50 mm thick earth and mud plaster (HSR item No. 14.20)

208.9

-

-

... More
First class brick work laid in cement stone dust (from crusher) mortar 1:7 in foundation and plinth (HSR Item 11.21)

5.31

-

-

... More
Laying Cement Concrete 1:3:6 with stone agg. 20MM nominal size in foundation and plinth (HSR Item No. 10.40).

70.8

-

-

... More
First class brick work laid in cement stone dust (from crusher) mortar 1:3 in foundation and plinth (HSR Item 11.25)

70.63

-

-

... More
First class brick work laid in cement stone dust (from crusher) mortar 1:3 in first story upto 4.0 mtr above plinth level (HSR Item 11.30)

25.84

-

-

... More
Design mix cement concrete of grade M-25 with minimum cement contents 300 Kg/cum in first storey up to 4 Mtr. Above plinth level (HSR Item No. 10.73).

52.49

-

-

... More
Design mix cement concrete of grade M-20 with minimum cement contents 300 Kg/cum in foundation and plinth (HSR Item No. 10.65).

12.93

-

-

... More
Cement Pointing 1:2 deep varity on brick and tile work(HSR item 15.60)

66.45

-

-

... More
Centering and shuttering for slab culvert exceeding 3 Mtr. To 6 Mtr. (HSR Item No. 9.18 B + note No.5)

31.41

-

-

... More
Centering and Shuttering for faces for concrete foundation and foundation beam(Vertical or battering) (HSR item 9.13)

85.18

-

-

... More
painting two coats with ready mixed exterior paint in all shades on newely plastered or concrete surface of walls .(HSR item 16.26)

32.72

-

-

... More
Filling expansion Joint with Bitumen filler 12mm wide(HSR item 24.34)

697.06

-

-

... More
Weep hole in Abutment and wall along section C-C as per specifications (5’ Horizontal & 5’ Vertical).

32

-

-

... More
Cold twisted deformed(: eibbed/tor steel) bars for RCC including bending, binding and placing of position complete.(HSR item 18.22)

45.48

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.