Indian Oil Adani Gas Private Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Indian Oil Adani Gas Private Limited - IOAGPL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date3 Oct 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Summary

Development For Steel Network Laying Of 4 In Dia Steel Pipeline For Png

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
TRENCHING - Trenching to all depths by excavation in all types of terrain/ strata including soft/ hard rock and various type of pavement/ footpath/ roads etc. including rock breaking, chiselling or otherwise cutting, excavation etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge & as per the relevant standard/ specification etc. The minimum depth of the trench for laying of Steel pipeline shall be 1.5 - 2 Mtrs. (as directed by Authority/E-I-C) measured from lowest available datum level adjacent to the trench or the periphery of the pipeline route. The depth may increase accordingly at places as per site condition or as per SCC/ OISD-141/ OISD- 226, PNGRB T4S, ASME Codes etc. whichever is higher. Clearing the bottom of trench by removing boulder, pebbles, etc. Undertaking proper safety measures, installing side plates/bracing etc. for protection of trench sides from collapsing. Dewatering of trenches to be done properly and no extra soil to be left over on roads/site. Excavation required for preparation of Tie-In Pits is covered in this item. No extra/separate claims/payments under any clause/condition shall be made.

-

-

-

... More
WELDING & NDT – Checking, cleaning, aligning, bending, cutting and bevelling (if required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray for Mainline welding & Gamma-Ray for Tie-In Joints of lowered section (in trench) only and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re- radiography and other tests as required on repaired joints. All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipeline including cutting of test header, rebevelling as required, radiography and other NDT examination, joint coating as per specification.

-

-

-

... More
COATING - Coating of field weld joints, bends, elbows, buried fittings and valves etc. including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxy etc.) as per Technical Specification compatible with 3 layer PE coating material of the line pipe. Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling.

-

-

-

... More
LOWERING & BACKFILLING - Installation/ lowering the pipeline in trench to required depth, supply and placement of PE warning mat Anti-Rodent type as per approved specifications over the pipeline along the complete route, padding around pipeline with suitable approved soil including supply of padding material, backfilling with available & borrowed earth (if required), approved excavated material and/or other suitable soil by crowning. Supply and installation of slope breakers, wherever required or, as directed by Owner, Engineer–in–charge. Supply and installation of bank protection along with backfill materials duly approved by EIC for pipeline trench and banks falls under minor water body crossing as per technical specification & Std. Drg., wherever required or, as directed by Owner/ EIC. Training and diversions of streams in steep slope area, wherever required. Supplying and filling coarse sand under floors, in foundations, floor, trenches, plinth etc. including cost-of sand, royalty, transportation, loading, unloading, spreading in layers not exceeding 20 cm., watering, ramming, compacting, dressing and levelling etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of E-I-C.

-

-

-

... More
RESTORATION - Supply and installation of construction markers (RCC Markers - to be installed at a distance of 50 mtr throughout the pipeline, Warning Marker- to be installed at a distance of 150 mtr throughout the pipeline), clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstruction within the ROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line/ poles, etc. coordination with concerned authorities and obtain permissions from these authorities. Final clean- up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer I/C. Restoration after completion of laying/crossing as per the direction of Statutory authority / Client / PMC and obtaining NOC.

-

-

-

... More
TESTING - Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with required quantity of corrosion inhibiters, if necessary as per specification and approved by Engineer I/C to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services, supervision, labour, consumables, water etc. as required and approved by Engineer I/C. Locating of leaks and rectification of defects attributable to Contractor (rectification of defects in line pipe material not attributable to contractor shall be paid separately as per other item of schedule of rate), re-testing after rectification, dewatering after successful completion of hydro testing of entire section and as approved by Engineer-in-charge.

-

-

-

... More
Carrying out GIS Data Collection & Entry for each Pipeline Assets / Cut Points / Jointers (Latitude / Longitude) With attributes as per satisfaction of Owner and / Or as directed by Engineer I/C. Submission of Data in the GIs format of. Shp,. Kml. Accuracy of the collection of assets / Cut points/ Joints to be in accuracy to be maintained 30cm -60cm.

-

-

-

... More
AS-BUILT - Preparation of as-built drawings, pipe-books (3 hard copies of pipebook including as built drawings and 2 soft copies) All the works shall be executed in accordance with the provision of contract including carrying out all temporary/ ancillary/ auxiliary works required for the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for pre-commissioning activities.

-

-

-

... More
4"x 6.4mm Wall Thck X-42/X-60 Pipeline Laying (1.5 m Pipe Top Cover)

1000

-

-

... More
Installation of Valves

-

-

-

... More
Handling, Storage, Installation/Erection, tie-in of valve assembly with station piping/pipeline including radiography of tie-up joints, functional testing,etc Precommissioning and Commissioning as per Owner's representative specification for all type of Valves. All coupling, nipples, gaskets, studs bolts & nut etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under this item rate.

-

-

-

... More
All pipes, fittings, valves, O-lets Size 2" NB CS and less than 2" NB size shall be supplied by the contractor but no separate payments shall be made as it is covered under item rate.

-

-

-

... More
4" NB 300# B/W Ball Valve Installation (with Bye-Pass & vent facility)

2

-

-

... More
4" NB 300# B/W Ball Valve Installation (without Bye-Pass & vent facility)

3

-

-

... More
Note:-Valves are free issue by Client

-

-

-

... More
Valve Chamber Construction

-

-

-

... More
SCOPE - All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specification enclosed and instruction of Engineer-in-Charge. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.

-

-

-

... More
EXCAVATION - Earth work in excavation in all kinds of soil, mixed strata, hard rock upto any depth including trimming of sides of the trenches/ valve pits, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including bailing out of water, if any, filling in sides of foundation trenches, plinth etc. with the excavated earth available and/ or depositing the excess earth within station area limits, in layers not exceeding 20 cms. thick, consolidating each deposited layer by ramming, watering, dressing to level and grade, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Engineer I/C.

-

-

-

... More
PLAIN CEMENT CONCRETE - Supplying and laying plain cement concrete of grade M 20 with stone aggregate 20mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, columns, pedestals, pedestal bases, pipe supports, floors, chambers, cable trench, under floors and any other locations, at all levels and locations as per drawings, specifications and directions of the Engineer I/C.

-

-

-

... More
SAND - Supplying and filling coarse sand under floors, in foundations, floor, trenches, plinth etc. including cost-of sand, royalty, transportation, loading, unloading, spreading in layers not exceeding 20 cm., watering, ramming, compacting, dressing and levelling etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Engineer I/C.

-

-

-

... More
REINFORCED CEMENT CONCRETE - Providing and laying RCC (reinforced cement concrete) of grade M-25 with 20mm and down grade crushed stone aggregate in all types of sub-structures like Beams, foundations, walls, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall including construction joints, bitumen painting on surfaces in contact with soil, shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer I/C.

-

-

-

... More
REINFORCEMENT - Supplying and providing reinforcement (for reinforced cement concrete works) Thermo-mechanically treated Fe-415 bars conforming to IS:1786 including initial straightening of coiled/uncoiled bars, removal of loose rust, cutting, bending to correct size & shape, binding with 18 gauge G.I. wire at each intersection and placing at any position, at any height and depth complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer.

-

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete

-

-

-

... More
BRICK WORK - Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curing, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Engineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, plastering, painting etc. with all bye-works and sundry works).

-

-

-

... More
STRUCTURAL WORK - Supplying, fabricating and fixing M.S. structural steel work made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. for struts, chain link fencing posts as per drawing including gate, ladders, safety grills, walkways, collapsible gate, signboards, supports for cable trench, making slots for barbed line, wire hoisting, placing in position, embedding in concrete, applying two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of EPILUX 610 Primer of M/s Berger or any other approved equivalent make as per manufacturer’s recommendation, complete in all respect including cutting to required size welding of joints, fixing anchor plates, bolts, threading, nuts, washers, sleeves etc. and necessary lettering of approved pattern on main gate, signboards etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. (excluding the cost of concrete work).

-

-

-

... More
CONSTRUCTION OF RCC VALVE CHAMBER (SIZE 2500 X 2000 X 2200 MM (APPROX)

2

-

-

... More
CONSTRUCTION OF RCC VALVE CHAMBER (SIZE 2500 X 1500 X 2000 MM (APPROX.)

3

-

-

... More
CONSTRUCTION OF RCC VALVE CHAMBER (SIZE 3000 X 2500 X 2200 MM (APPROX.)

2

-

-

... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD

-

-

-

... More
SCOPE - Complete work of installation of carrier pipe at crossings or wherever required by HDD method for roads, nala, drain and canal wherever required in all types of soils/ murram and terrains including scope covered in Item A above but not limited to string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve (Dirax) and repair of pipeline coating with special repair patch materials as per Specification, pre- testing and post testing etc. of complete string made for crossing. Rate for this SOR item for steel pipeline laying is inclusive of carrier pipe string preparation (Welding, NDT, Pretesting, Coating, Hydro testing, Pre-commissioning and commissioning of pipeline etc.).Incl. Pre- testing and post testing shall be conducted as per EIC direction for critical crossings like Major Road Junction, NHAI, River & Canal, Railway and any other crossings considered critical by EIC and contractor shall abide by the EIC directions Installation of Warning Marker at Entry and Exit Point.

-

-

-

... More
SURVEY - Pre-Construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing/ laying along route drawings for getting their approval from concerned Authority/ Engineer-in-Charge, getting work permit/ NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start of the execution of work. Additional land required for placement of HDD equipments and/ or string preparation shall be in Contractors scope. Bore hole inspection to identify soil strata shall be undertaken as per EIC directions for HDD in rocky strata

-

-

-

... More
TRENCHING/EXCAVATION FOR HDD WORKS - Trenching to all depths by excavation in all types of terrain/ strata including soft/ hard rock and various type of pavement/ footpath/ roads etc. including rock breaking, chiselling or otherwise cutting, excavation etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge & as per the relevant standard/ specification etc. The minimum depth of the trench for laying of Steel pipeline shall be 1.5 - 2 Mtrs. (as directed by Authority/E-I-C) measured from lowest available datum level adjacent to the trench or the periphery of the pipeline route. The depth may increase accordingly at places as per site condition or as per SCC/ OISD-141/ OISD- 226, PNGRB T4S, ASME Codes etc. whichever is higher. Clearing the bottom of trench by removing boulder, pebbles, etc. Undertaking proper safety measures, installing side plates/bracing etc. for protection of trench sides from collapsing. Dewatering of trenches to be done properly and no extra soil to be left over on roads/site. Excavation required for preparation of Tie-In Pits is covered in this item. No extra/separate claims/payments under any clause/condition shall be made. No extra payment for excavation or breaking of soft/ hard rock and various type of pavement/ footpath/ roads, hard soil, etc required for laying

-

-

-

... More
DRILLING - Drilling to required depth including maintenance/ restoration of drill hole in all types of soils/ murram/ mixed strata, all depth to accommodate the pipeline at all conditions encountered during crossing/ laying along route by approved HDD methods procedure for providing minimum cover specified in code/ specification/ PNGRB regulations or as decided by concerned authority, whichever is more.

-

-

-

... More
RESTORATION - Backfilling of the ditch/ trench including restoration and clean-up of area and all other works including cleaning, gauging and final hydro testing etc. along with mainline works required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer I/C and/or as directed by concerned Authority.

-

-

-

... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD - Uncased CROSSING (Soft Soil)

-

-

-

... More
4" NB Uncased crossing by HDD M/C

500

-

-

... More
INSTALLATION/ LAYING OF CARRIER PIPE BY HDD METHOD - LAYING ALONG THE ROU

-

-

-

... More
4" NB Carrier Pipe by HDD M/C

1000

-

-

... More
TEMPORARY CATHODIC PROTECTION

-

-

-

... More
Design, detailed engineering, supply, installation, testing and commissioning of the temporary Cathodic protection system using Mg/ Zn galvanic anodes to protect the external surface of 3 LPE coated entire length steel pipeline network against corrosion for design life of minimum 2 years or till commissioning of PCP system whichever is later as per standard specification for temporary cathodic protection system. Scope shall also include but not limited to the following for completion of jobs:

-

-

-

... More
Measurement of soil resistivity along the right of way of the main pipeline route as per specification for design & installation of anodes. Collection of additional data related to cathodic protection along the right of way of pipeline as per specifications.

-

-

-

... More
Supply, installation, testing & commissioning of one set of spark gap arrestor with 2 plate Zinc grounding cell of 20 kg net weight each across each insulating joint as per specification. Supply & installation of Zinc Ribbon Anodes at 4-8 O'clock position in the interval of 2 metre (max.) on carrier pipes at all cased crossings i.e. railways/ roads etc.

-

-

-

... More
Supply, installation, testing & commissioning one set of polarisation cell with zinc anode at all high tension (66KV or higher) electrical power transmission line/Equipment crossing or running parallel to the pipeline for grounding purpose as per specification. The rating shall depend upon anticipated fault current & ground bed resistance at the location of installation. However, the rating of polarisation cell (krick) shall not be less than 5 KA & number of 20 kg net weight zinc anode shall not be less than two.

-

-

-

... More
Monitoring of the protection system till commissioning of pipeline or till final handover, whichever is earliest..

-

-

-

... More
All civil/ structural works related to TCP system including supply of bricks, cement & steel etc. required for completion of the system.

-

-

-

... More
The quantities mentioned above are tentative and quantities for above including supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner.

-

-

-

... More
For all the supply items mentioned above, procurement shall be made as per specification & Data Sheets, after due approval of Engineer-incharge.

-

-

-

... More
4"x 6.4mm Wall Thck X-42 Pipeline Laying (1.5 m Pipe Top Cover)

2500

-

-

... More
Other Items

-

-

-

... More
S&I of Neoprene / HDPE Sheet of Suitable Width as per drawings, specifications of E-I-C. (Thickness 6 mm)

25

-

-

... More
Extra Excavation in soil

-

-

-

... More
PLAIN CEMENT CONCRETE (Supplying and laying plain cement concrete of grade M 20 with stone aggregate 20mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, columns, pedestals, pedestal bases, pipe supports,floors, chambers, cable trench, under floors and any other locations (which are not covered as part of composite items) , at all levels and locations as per drawings, specifications and directions of the Engineer I/C. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.)

25

-

-

... More
REINFORCED CEMENT CONCRETE IN SUB STRUCTURE WORKS (Providing and laying RCC (reinforced cement concrete) of grade M-25 with 20mm and down grade crushed stone aggregate in all types of sub-structures like Beams, foundations, walls, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall including construction joints, bitumen painting on surfaces in contact with soil, shuttering, supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer I/C.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all works and sundry works complete).

25

-

-

... More
Liasioning Cost (if required) with various government / Semi government / Private land owner after receiving Principle permissions from IOAGPL. Prior approval from EIC shall be taken for any liasoning activities as per this line item

2500

-

-

... More
CONCENTRIC REDUCER 4”X2”, (ASTM A 234 GR.WPB)

5

-

-

... More
90 DEG ELBOW 1.5D- 4”, SCH.80 (ASTM A 234 GR.WPB)

5

-

-

... More
SURGE DIVERTER

5

-

-

... More
Road/Surface restoration works shall be executed as per the specification of concerned authority and their directions. Specification provided below for restoration of Chipping Carpet road and BM&BC road are indicative only. Authority norms and directions shall be final and to ensured (in case of deviation between specification provided below and authority norms, authority norms shall be final). Contractor shall obtain NOC from respective authority after work completion. No separate payment shall be made for sub activities under each type of restoration item

-

-

-

... More
Chipping Carpet Road Restoration: Excavation – 1500mm thick (1.50m3); Sand Filling – 750mm thick (0.75m3); Granular Sub-Base (GSB) – 450mm thick (0.45m3); Wet Mix Macadam (WMM) – 300mm thick (0.30m3); Prime Coat – 1 m2; Premix Surfacing – 1m2

-

-

-

... More
BM&BC Road restoration: Excavation – 1500mm thick (1.50m3); Sand Filling – 750mm thick (0.75m3); Granular Sub-Base (GSB) – 450mm thick (0.45m3); Wet Mix Macadam (WMM) – 300mm thick (0.30m3); Prime Coat – 1 m2; Tack Coat – 1m2; Bituminous Macadam (BM) – 50mm thick (0.050m3); Bituminous Concrete (BC) – 40mm thick (0.04m3)

-

-

-

... More
RESTORATION OF ASPHALT ROAD UPTO 10 CM THICKNESS

50

-

-

... More
RESTORATION OF ASPHALT ROAD BEYOND 10 CM UPTO 20 CM THICKNESS

50

-

-

... More
RESTORATION OF CONCRETE ROAD UPTO 10 CM THICKNESS

50

-

-

... More
RESTORATION OF RED STONE ROAD / FOOTPATH / PAVEMENT/ PAVER BLOCK UPTO 4 CM THICKNESS

50

-

-

... More
PERMANENT MARKERS

-

-

-

... More
Permanent Markers supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint (powder coated), stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner/Owner’s Representative

-

-

-

... More
RCC BOUNDARY PILLARS

50

-

-

... More
PIPELINE MARKER (STEEL) (Directional Markers, Warning Markers, Kilomenter Markers.)

15

-

-

... More
PLANT PIPING (ONLY FOR ABOVEGROUND WORKS/ CNG STATION/ DRS & MRS LOCATIONS)

-

-

-

... More
Transportation of all piping items from Owner's and/ or Contractor's storage point to work at site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning/ Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Preparation of isometric and fabrication drawings. Preparation of final bill of material based on piping GADs. Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of all Olets less than 2" NB size, all sizes of nipples and coupling etc. as required for completion of job. Weldolets, sockolets, flanges, vent and drain point connection etc., including providing stubbing connections, fabricated fittings and reinforcement pads etc., as required.

-

-

-

... More
Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie- in with existing piping/facilities, etc. tapping for inline instruments like pressure gauges, thermo wells, sample connection, etc. Carrying out Non-destructive testing as required. All butt welded fittings & flanges end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost.

-

-

-

... More
Surface preparation before application of primer by means of shot blasting including supply of approved quality of grits, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.

-

-

-

... More
Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specifications suitable for highly corrosive area environment including supply of approved paints and primers, application of primer and paints, identification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc.

-

-

-

... More
Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.

-

-

-

... More
Precommissioning & making operational all piping system and equipments. Commissioning Contractor scope shall provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.

-

-

-

... More
Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.

-

-

-

... More
Complete Carbon Steel aboveground Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. No separate payments shall be made for the supply of gaskets, studs, bolts & nuts as it is covered under this item rate.

-

-

-

... More
All pipes, fittings, valves, O-lets, Size 2" NB or less than 2" size, all sizes of coupling and nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.

-

-

-

... More
All civil/ structural works including area fencing and gate, piping support etc. is covered in this item.

-

-

-

... More
PIPING WORKS, 4", API 5L X 42/ X 60

50

-

-

... More
PIPING WORKS, 2", SCH 80, ASTM A 106 GR. B

25

-

-

... More
4" NB 300# Insulating Joint Installation

4

-

-

... More
INSTALLATION OF BALL VALVE, 4", 300#, BW END CONNECTION

6

-

-

... More
INSTALLATION OF BALL VALVE, 2", 300#, BW END CONNECTION

5

-

-

... More
INSTALLATION OF BALL VALVE, 2", 150#, BW END CONNECTION

2

-

-

... More
INSTALLATION OF BALL VALVE, 2", 150#, FE CONNECTION

2

-

-

... More
INSTALLATION OF GLOBE VALVE, 4", 300#, BW END CONNECTION

2

-

-

... More
INSTALLATION OF GLOBE VALVE, 2", 300#, BW END CONNECTION

2

-

-

... More
INSTALLATION OF GLOBE VALVE, 2", 300#, FE CONNECTION

2

-

-

... More
Note:-Insulating Joint are free issue by Client

-

-

-

... More
HOOK -UP

-

-

-

... More
Hook-up of proposed pipeline by welding of final tie-in-joint with any existing laid pipeline portion, existing Tap-off & battery limit of different section including Hook-up point of the existing pipeline to be made ready for welding by cutting of Sections including Hook-up point of the existing pipeline to be made ready for welding by cutting of flanges / valves / headers at all depth in all type of soil etc. Venting of N2 / gas / gas mixture as required purging of N2 Gas (if required), rebevelling as required, radiography and other NDT examination, joint coating as per specification. Contractor shall supply of all consumables, manpower, machineries, materials, N2 gas etc. and carry out all works as per the provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
4" NB/ 6.4 MM (0.252")/ API 5L GR. B (ERW)

2

-

-

... More
STRUCTURAL WORKS

-

-

-

... More
Supplying, fabricating and fixing M.S. structural steel work made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. for struts, chain link fencing posts as per drawing including gate, ladders, safety grills, walkways, collapsible gate, signboards, supports for cable trench, making slots for barbed line, wire hoisting, placing in position, embedding in concrete, applying two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of EPILUX 610 Primer of M/s Berger or any other approved equivalent make as per manufacturer’s recommendation, complete in all respect including cutting to required size welding of joints, fixing anchor plates,bolts, theading, nuts, washers, sleeves etc. and necessary lettering of approved pattern on main gate, signboards etc.complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. (excluding the cost of concrete work).

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.