Haryana Urban Development Authority Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 2,340Document Cost
₹ 250Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_HBC_153638_1Bid Award Id
ViewTender No
Job No 66/2020 Re-invitedTender Authority
Haryana Urban Development Authority ViewPurchaser Address
-Website
http://https://www.hsvphry.org.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
9.5 Centering and Shuttering for faces of walls, partitions, retaining wall, well steining and the like (vertical or battering) including attached pilasters, buttresses etc.
8.5
-
54.85
... More
18.22 Steel reinforcement TMT bars FE-500 EQR / FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and
placing in position complete in all respects for all heights / depths /storeys / basements etc. Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
4
-
927.05
... More
18.12 Wrought iron and mild steel (using angles, flats, square bars, tee and channels ladders, grills, gritting frames, window guards, iron doors open-able or fixed stair case or parapet or any other type of railing gates and tree guards etc. including cost of crews and welding road bolts and nuts complete fixed in position.
9.5
-
1040.35
... More
16.9
+16.17 Applying priming coat with metal primer on new steel or iron work including preparation of surface. + Painting two coats excluding priming coat with ready mixed paint for metallic surfaces in all shades on new steel or iron work.
20
-
9
... More
15.11 15 mm thick cement plaster 1:5 on the rough side of single or half brick wall
15
-
14.25
... More
15.3 + 15.75 12 mm thick cement plaster 1:2 with Cement rendering on plaster 1 mm thick
10
-
20.85
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements